I want to search for...

Permit #2016110715

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00700-0120
CONDITIONED SPACE: 1664 sqft
GARAGE: 498 sqft
OPENED PORCH (WITH ROOF) : 475 sqft
OPENED PORCH (WITH ROOF) : 101 sqft
Total Square Footage: 2738 sqft
Block: 00700
Subdivision: -
Job Phone: 386-986-6021
Location Address: 20 SLEEPY HOLLOW TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/21/2016
NOC: RECORDED
Applicant name: RONALD JULIUS WAHL
Owner: ARKADIAL LLC

Address

8 EDGELY PLACE

PALM COAST, FL 32164

Lot: 0120
Contracted Stated Job Value: ¤140,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

RONALD JULIUS WAHL- INDIVIDUAL
Status Location Address State License Number Phone
CANCEL

3 EDGEWATER PLACE

PALM COAST, FL 32137

CRC1331488 (Exp: 08/31/2022) 386-986-6021

Sub Contractors

RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
ROBERT JOHN TROWBRIDGE
Status Location Address State License Number Phone
INACTIVE

3801 Long Grove Lane

Port Orange, 32119

CAC057234 (Exp: 08/31/2024) (386) 767-9735
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488
DANIEL J LUSINSKI
Status Location Address Mailing Address State License Number Phone
ACTIVE

389 PALM COAST PARKWAY SW

PALM COAST, FL 32137

#4

PALM COAST, FL 32137

CCC1330133 (Exp: 08/31/2026) 386-338-7926

Inspection History

Type Request Date Result Inspector
U -UTILITY RESIDENTIAL FINAL 07/18/2017 FINAL APPROVED MBACON
BLD - BUILDING FINAL 07/17/2017 FINAL APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
ROOF VALLEY & METAL 07/13/2017 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
ROOF VALLEY & METAL 07/12/2017 Disapproved -FEE REQUIRED DROCKWELL
Note: Missed inspection.See chief building inspector or Building offical
BLD - BUILDING FINAL 07/12/2017 CANCELLED BY APPLICANT DROCKWELL
ROW - FINAL APRON (AFTER POUR) 07/06/2017 APPROVED CTROHA
Note: THIS IS A REINSPECTION FINAL SURVEY ON SITE
ROW - FINAL INSPECTION 07/06/2017 APPROVED CTROHA
Note: APPROVED UNDER 7000 CODE
ROW - FINAL APRON (AFTER POUR) 07/05/2017 CANCELLED BY APPLICANT CTROHA
Note: THIS IS A REINSPECTION
ROW FINAL 07/05/2017 APPROVED CTROHA
Note: THIS IS A REINSPECTION
ROW - FINAL APRON (AFTER POUR) 06/30/2017 Disapproved - NO FEE CTROHA
Note: MISSING DOCUMENTS: FINAL SURVEY
ROW FINAL 06/30/2017 Disapproved -FEE REQUIRED CTROHA
Note: SEED AND STRAW: ALL BARE GROUND ON ADJACENT PROPERTIES LEFT AND REAR
FINAL SURVEY (OFFICE USE ONLY) 06/14/2017 APPROVED JHINDMAN
ELECTRIC - EARLY POWER 04/27/2017 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED EARLY POWER 3:15
ELECTRIC FINAL 04/26/2017 Disapproved - NO FEE RMARTIN
Note: THIS PERMIT DOES NOT REQUIRE ELECTRIC FINAL INSPECTION, NEED TO CALL IN INSPECTIONS ON PLACARD, MAYBE EARLY POWER INSPECTION?
ROW- PRE-APRON (PRE-POUR) 04/21/2017 APPROVED RGROSS
Note: READY TO POUR
U - SEWER TIE IN 04/10/2017 APPROVED MBACON
GRAVITY SEWER TEST 04/10/2017 APPROVED JGIBSON
INSULATION 03/24/2017 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
INSULATION 03/23/2017 Disapproved -FEE REQUIRED DROCKWELL
Note: Baffels are tight against roof deck not allowing for ventilation
ALL ROUGH 03/21/2017 APPROVED DROCKWELL
LATH/BRICK/ WATER BARRIER 03/17/2017 APPROVED DROCKWELL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/07/2017 APPROVED - AS NOTED DROCKWELL
Note: Re-strap truss at entry left side. Existing strap is over-bent
TIE BEAM / LINTEL 02/16/2017 APPROVED DROCKWELL
FOUND SURVEY APPROVED (OFFICE) 02/15/2017 APPROVED FREODICA
MONOLITHIC SLAB 02/02/2017 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 01/30/2017 APPROVED - AS NOTED DROCKWELL
Note: FYI-- Add forms before mono slab inspection

Review History

Department Status Date In Date Out
SW1 COMPLETE 06/13/2017 06/14/2017
Note: Released By: JHINDMAN final s
SW1 COMPLETE 02/15/2017 02/15/2017
Note: Released By: FREODICA foundation s
MECH COMPLETE 12/16/2016 12/21/2016
MECH HOLD 12/09/2016 12/15/2016
Note: Provide the complete package of energy calculations per FBC 5th ed. 107.2.1. F.Reodica-386-986-4734.
UD1 COMPLETE 12/02/2016 12/05/2016
ELEC COMPLETE 12/02/2016 12/07/2016
MECH HOLD 12/02/2016 12/07/2016
Note: Submitted AHRI certificate of product ratings shall not be used for equipment sizing as it does not include the sensible and latent capacities of selected hvac units at the design conditions per FBCEC 5th ed. R403.6/R403.6.1.1. F.Reodica -386-986-4734.
BLD COMPLETE 11/16/2016 11/21/2016
ELEC HOLD 11/16/2016 11/21/2016
Note: 1. Provide electrical load calculations 2011 NEC art. 220. J. Hindman 986-3784.
ENGIN1 COMPLETE 11/16/2016 11/28/2016
MECH HOLD 11/16/2016 11/21/2016
Note: 1. On the project summary design page of the energy calculations Provide the heating and cooling equipment summary information for the units that are to be installed. 5th ed. FBC 107.2.1. J. Hindman 986-3784.
PLUM COMPLETE 11/16/2016 11/21/2016
SW1 COMPLETE 11/16/2016 11/21/2016
UD1 HOLD 11/16/2016 11/21/2016
Note: PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
ZON COMPLETE 11/16/2016 11/17/2016
URB COMPLETE 11/16/2016 11/17/2016

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/17/2017
REINSPECTION FEE ¤40.00 07/05/2017
REINSPECTION FEE ¤40.00 07/05/2017
NEW RESIDENTIAL INSPECTIONS ¤458.00 12/21/2016
SITE PLAN 20 ¤20.00 12/21/2016
SURCHARGE FS 533.721 ¤17.73 12/21/2016
SURCHARGE - FS 468.631 ¤17.73 12/21/2016
STORM WATER PERMIT FEES ¤80.00 12/21/2016
3% TRANS IMPACT FEE CREDIT (¤93.74) 12/21/2016
ADMIN FEE ¤20.00 12/21/2016
ELECTRIC FEE ¤197.40 12/21/2016
3% FIRE IMPACT FEE CREDIT (¤6.43) 12/21/2016
IMPACT FEE FIRE NONRESIDENTIAL ¤214.29 12/21/2016
IMPACT FEE PARKS ¤849.24 12/21/2016
IMPACT FEE SCHOOL ¤3,600.00 12/21/2016
IMPACT FEE TRANSPORTATION ¤3,124.67 12/21/2016
MECHANICAL FEE ¤197.40 12/21/2016
3% PARKS IMPACT FEE CREDIT (¤25.48) 12/21/2016
PLAN CHECK FEE ¤91.60 12/21/2016
PLUMBING FEE ¤197.40 12/21/2016
Fees Total Due: ¤0.00 Total Paid: ¤9,079.81