I want to search for...

Permit #2016111421

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-01630-0090
CONDITIONED SPACE: 2578 sqft
GARAGE: 541 sqft
OPENED PORCH (WITH ROOF) : 306 sqft
OPENED PORCH (WITH ROOF) : 43 sqft
Total Square Footage: 3468 sqft
Block: 01630
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 386-931-2568
Location Address: 201 LONDON DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/21/2016
NOC: RECORDED
Applicant name: PETER JOSEPH LYDEN
Owner: KUREK, THOMAS & MARGARET E

Address

1721 PERENNIAL WAY

ERIE, PA 16510

Lot: 0090
Contracted Stated Job Value: ¤170,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

DEL CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

PO BOX 1009

BUNNELL, FL 32110

CBC1253392 (Exp: 08/31/2024) 386-931-2568

Sub Contractors

PETER JOSEPH LYDEN
Status Location Address State License Number Phone
CANCEL

17 UNIMAY CT

BUNNELL, FL 32110

EC0002436 (Exp: 08/31/2022) 386-931-2568
CHARLES WEYANT
Status Location Address State License Number Phone
ACTIVE

PO BOX 1261

FLAGLER BEACH, FL 32136

CAC1815058 (Exp: 08/31/2026) (386)246-7745
LARRY A JONES
Status Location Address State License Number Phone
INACTIVE

P. O. Box 1150

Bunnell, FL 32110

RF0055279 (Exp: 08/31/2025) (386) 437-0230
PETER JOSEPH LYDEN
Status Location Address State License Number Phone
INACTIVE

PO BOX 1009

BUNNELL, FL 32110

CBC1253392 (Exp: 08/31/2024) 386-931-2568

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/14/2017 FINAL APPROVED CMINI
ROW - FINAL APRON (AFTER POUR) 11/06/2017 APPROVED - AS NOTED RGROSS
Note: SWALE HOLDING WATER. CITY WILL REGRADE GENERAL SWALE RUN IN THE FUTURE TO CORRECT SWALE DRAINAGE ISSUE.
FINAL SURVEY (OFFICE USE ONLY) 10/30/2017 APPROVED DREWIS
ROW- PRE-APRON (PRE-POUR) 08/17/2017 APPROVED RGROSS
Note: APPROVED. READY FOR PAVERS.
ROW- PRE-APRON (PRE-POUR) 07/28/2017 PARTIALLY APPROVED RGROSS
Note: PARTIALLY APPROVED FOR CONCRETE APRON AND OVER PIPE ONLY. MUST HAVE 2ND PRE POUR BEFORE PAVERS ARE PLACED.
ALL ROUGH 07/26/2017 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/26/2017 APPROVED CMINI
ROOF VALLEY & METAL 07/26/2017 APPROVED CMINI
INSULATION 07/26/2017 APPROVED CMINI
ELECTRIC-TUG 03/02/2017 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED TUG POWER 2:20
TIE BEAM / LINTEL 02/22/2017 APPROVED CMINI
FOUND SURVEY APPROVED (OFFICE) 01/31/2017 APPROVED FREODICA
MONOLITHIC SLAB 01/26/2017 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 01/26/2017 APPROVED CMINI

Review History

Department Status Date In Date Out
SW1 COMPLETE 10/30/2017 10/30/2017
Note: Released By: DREWIS final surve
ZON COMPLETE 09/14/2017 09/14/2017
Note: Released By: AMOBLEY
BLD COMPLETE 08/29/2017 08/29/2017
Note: Released By: JHINDMAN
ENGIN1 COMPLETE 08/29/2017 08/29/2017
Note: Released By: TBAKER
ZON HOLD 05/17/2017 08/30/2017
Note: Held By: AMOBLEY Need right of way agreement for paver driveway signed by all owners and notarized
ENGIN1 COMPLETE 05/16/2017 05/17/2017
Note: A revised Swale Plan has been issued. The original Swale Plan issued 12/06/2016 is now VOID. Note the revised swale elevation to accomodate the paver driveway.
SW1 COMPLETE 05/16/2017 05/23/2017
UD1 COMPLETE 05/16/2017 05/17/2017
ZON HOLD 05/16/2017 05/17/2017
Note: Need right of way agreement signed by all owners on the deed Please show setbacks from the paver lanai on site plan
SW1 COMPLETE 01/30/2017 01/31/2017
Note: Released By: FREODICA FOUNDATION
UD1 COMPLETE 12/16/2016 12/19/2016
UD1 HOLD 12/12/2016 12/13/2016
Note: PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. I see new submittal on 12/12/16 but PEP panel electrical stub out is still not labeled/located in drawing.
PLUM COMPLETE 12/12/2016 12/15/2016
MECH COMPLETE 12/12/2016 12/15/2016
BLD COMPLETE 12/02/2016 12/08/2016
ELEC COMPLETE 12/02/2016 12/07/2016
ENGIN1 COMPLETE 12/02/2016 12/06/2016
MECH HOLD 12/02/2016 12/07/2016
Note: 1. Clarify the insulation R-value of unvented roof deck (item 10a) on energy calculations as it shows only R=1 per FBCEC 5th ed. T-R4021.1/FBC 5th ed. 107.2.1. 2. Provide sensible and latent capacities of selected hvac units at the design conditions per FBCEC 5th ed.R403.6.1. F,Reodica-386-986-4734.
PLUM HOLD 12/02/2016 12/07/2016
Note: 1. Provide complete pipe sizes of DWV on sanitary riser diagram per FBCR 5th ed P3005.4/FBC 5th ed. 107.2.1.
SW1 COMPLETE 12/02/2016 12/07/2016
UD1 HOLD 12/02/2016 12/05/2016
Note: PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
ZON COMPLETE 12/02/2016 12/02/2016
URB COMPLETE 12/02/2016 12/02/2016

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RECORDING FEE REIMBURSE DOC ¤52.50 09/15/2017
REVISION ¤40.00 09/15/2017
SITE PLAN 20 ¤20.00 12/21/2016
SURCHARGE FS 533.721 ¤23.59 12/21/2016
SURCHARGE - FS 468.631 ¤23.59 12/21/2016
STORM WATER PERMIT FEES ¤80.00 12/21/2016
3% TRANS IMPACT FEE CREDIT (¤93.74) 12/21/2016
IMPACT FEE TRANSPORTATION ¤3,124.67 12/21/2016
MECHANICAL FEE ¤253.20 12/21/2016
3% PARKS IMPACT FEE CREDIT (¤25.48) 12/21/2016
PLAN CHECK FEE ¤128.80 12/21/2016
PLUMBING FEE ¤253.20 12/21/2016
NEW RESIDENTIAL INSPECTIONS ¤644.00 12/21/2016
ADMIN FEE ¤20.00 12/21/2016
ELECTRIC FEE ¤253.20 12/21/2016
3% FIRE IMPACT FEE CREDIT (¤6.43) 12/21/2016
IMPACT FEE FIRE NONRESIDENTIAL ¤214.29 12/21/2016
IMPACT FEE PARKS ¤849.24 12/21/2016
IMPACT FEE SCHOOL ¤3,600.00 12/21/2016
Fees Total Due: ¤0.00 Total Paid: ¤9,454.63