Permit #2016120008
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00340-0260 |
| CONDITIONED SPACE: 2593 sqft |
| OPENED PORCH (WITH ROOF) : 151 sqft |
| OPENED PORCH (WITH ROOF) : 70 sqft |
| GARAGE: 862 sqft |
| Total Square Footage: 3676 sqft |
| Block: 00340 |
| Subdivision: 2211 - SECTION 59-SEMINOLE PARK |
| Job Phone: 386-931-2568 |
| Location Address: 26 SEA FRONT TRL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/20/2016 |
| NOC: RECORDED |
| Applicant name: PETER JOSEPH LYDEN |
| Owner: GORTH, DAVID & LINDA |
|
Address 11 SEA FLOWER PATH PALM COAST, FL 32164 |
| Lot: 0260 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DEL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1009 BUNNELL, FL 32110 |
CBC1253392 (Exp: 08/31/2024) | 386-931-2568 |
Sub Contractors
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
JAMES KUYKENDALL
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2550 US 1 NORTH SUITE 3 BUNNELL, FL 32110 |
CAC1815546 (Exp: 08/31/2022) | (386)437-2929 | (386)437-2942 |
LARRY A JONES
| Status | Location Address | State License Number | Phone |
| INACTIVE |
P. O. Box 1150 Bunnell, FL 32110 |
RF0055279 (Exp: 08/31/2025) | (386) 437-0230 |
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1009 BUNNELL, FL 32110 |
CBC1253392 (Exp: 08/31/2024) | 386-931-2568 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 01/23/2018 | APPROVED - AS NOTED | CTROHA |
| Note: NEED TO MAKE SAW CUTS OVER PIPE ON THE MITERED ENDS | |||
| U - SEWER TIE IN | 09/28/2017 | APPROVED | MBACON |
| U -UTILITY RESIDENTIAL FINAL | 09/28/2017 | FINAL APPROVED | MBACON |
| Note: Pep tank placement approved per Ralph Hand. | |||
| BLD - BUILDING FINAL | 09/27/2017 | FINAL APPROVED | CMINI |
| ROW - FINAL INSPECTION | 09/26/2017 | APPROVED | CTROHA |
| Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION work complete | |||
| ROW - FINAL INSPECTION | 09/22/2017 | Disapproved -FEE REQUIRED | CTROHA |
| Note: SOD WITH BAHIA ALONG DITCH ON THE RIGHT SIDE PROPERTY LINE AND CLEAN UP CONSTRUCTION DEBRIS (CONCRETE) ALONG DITCH BANK | |||
| GRAVITY SEWER TEST | 09/22/2017 | APPROVED | CMINI |
| ELECTRIC - EARLY POWER | 09/22/2017 | APPROVED | CMINI |
| FINAL SURVEY (OFFICE USE ONLY) | 09/19/2017 | APPROVED | JHINDMAN |
| ROW- PRE-APRON (PRE-POUR) | 08/29/2017 | APPROVED | CTROHA |
| Note: READY FOR PAVERS | |||
| ROW- PRE-APRON (PRE-POUR) | 08/21/2017 | APPROVED | CTROHA |
| Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/18/2017 | Disapproved -FEE REQUIRED | CTROHA |
| Note: NO COMPACTION AROUND CULVERT CULVERT PIPE IS FLOATING NOT 6" AT ROAD EDGE AND NEEDS A FORM BOARD AT ROAD CONCRETE CAN NOT ENTER THE ROAD WAY NEED TO DIG OUT AROUND THE ENDS OF THE CULVERT SEE DRIVEWAY DETAIL | |||
| ROW- PRE-APRON (PRE-POUR) | 08/14/2017 | Disapproved -FEE REQUIRED | CTROHA |
| Note: CULVERT PIPE OUT OF TOLERANCE SEE SWALE PLAN | |||
| INSULATION | 07/26/2017 | APPROVED | CMINI |
| ALL ROUGH | 04/20/2017 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/17/2017 | APPROVED | CMINI |
| LATH/BRICK/ WATER BARRIER | 04/17/2017 | APPROVED | CMINI |
| TIE BEAM / LINTEL | 03/23/2017 | APPROVED | CMINI |
| ELECTRIC-TUG | 03/23/2017 | APPROVED - AS NOTED | CMINI |
| Note: called fpl to release power, spoke with Susan | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/02/2017 | APPROVED | FREODICA |
| MONOLITHIC SLAB | 02/22/2017 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/30/2017 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/24/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Plumbing riser diagram not in packet |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 09/19/2017 | 09/19/2017 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 09/15/2017 | 09/19/2017 |
| Note: Released By: JHINDMAN final s | |||
| ZON | COMPLETE | 07/19/2017 | 07/19/2017 |
| Note: Released By: TDOAK | |||
| UTL | COMPLETE | 07/19/2017 | 07/27/2017 |
| Note: Released By: MBACON All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA clear zone for a hydrant is 3 feet from both sides and 3 feet behind the hydrant. Front of hydrant shall remain completely clear. | |||
| ENGIN1 | COMPLETE | 07/19/2017 | 07/21/2017 |
| Note: Released By: TBAKER No change to swale sheet | |||
| SW1 | COMPLETE | 03/01/2017 | 03/02/2017 |
| Note: Released By: FREODICA foundation s | |||
| PLENV | COMPLETE | 12/14/2016 | 12/14/2016 |
| Note: Site plan is consistent with the approved DO and stormwater agreement. | |||
| ZON | COMPLETE | 12/14/2016 | 12/14/2016 |
| PLUM | COMPLETE | 12/14/2016 | 12/19/2016 |
| MECH | COMPLETE | 12/14/2016 | 12/19/2016 |
| BLD | COMPLETE | 12/02/2016 | 12/06/2016 |
| ELEC | COMPLETE | 12/02/2016 | 12/06/2016 |
| ENGIN1 | COMPLETE | 12/02/2016 | 12/09/2016 |
| MECH | HOLD | 12/02/2016 | 12/08/2016 |
| Note: 1. Provide signature and license number of hvac contractor on hvac plan per FBC 5th ed. 107.2.1. 2. Latent capacity of selected hvac units shall not be less the calculated latent load per FBCEC 5th ed. R403.6.1.1. F.Reodica-386-986-4734. | |||
| PLUM | HOLD | 12/02/2016 | 12/08/2016 |
| Note: Provide complete pipe sizes of DWV on sanitary riser diagram per FBCR 5th ed. P3005.4/P3101. F.Reodica-386-986-4734. | |||
| SW1 | COMPLETE | 12/02/2016 | 12/06/2016 |
| UD1 | COMPLETE | 12/02/2016 | 12/05/2016 |
| Note: This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 12/02/2016 | 12/05/2016 |
| Note: Per the land development code 4.01.03 B Attached garages shall have a maximum depth of 30 feet. The plans show garage at 31' - 2" | |||
| URB | COMPLETE | 12/02/2016 | 12/02/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| RECORDING FEE REIMBURSE DOC | ¤52.50 | 01/22/2018 |
| REINSPECTION FEE | ¤40.00 | 01/22/2018 |
| REINSPECTION FEE | ¤40.00 | 01/22/2018 |
| REINSPECTION FEE | ¤40.00 | 01/22/2018 |
| REINSPECTION FEE | ¤40.00 | 01/22/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤664.00 | 12/20/2016 |
| SITE PLAN 20 | ¤20.00 | 12/20/2016 |
| SURCHARGE FS 533.721 | ¤24.22 | 12/20/2016 |
| SURCHARGE - FS 468.631 | ¤24.22 | 12/20/2016 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/20/2016 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 12/20/2016 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 12/20/2016 |
| MECHANICAL FEE | ¤259.20 | 12/20/2016 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 12/20/2016 |
| PLAN CHECK FEE | ¤132.80 | 12/20/2016 |
| PLUMBING FEE | ¤259.20 | 12/20/2016 |
| ADMIN FEE | ¤20.00 | 12/20/2016 |
| ELECTRIC FEE | ¤259.20 | 12/20/2016 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.43) | 12/20/2016 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤214.29 | 12/20/2016 |
| IMPACT FEE PARKS | ¤849.24 | 12/20/2016 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/20/2016 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,617.89 |