Permit #2016120300
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01290-0090 |
| CONDITIONED SPACE: 2016 sqft |
| GARAGE: 549 sqft |
| OPENED PORCH (WITH ROOF) : 202 sqft |
| OPENED PORCH (WITH ROOF) : 118 sqft |
| Total Square Footage: 2885 sqft |
| Block: 01290 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-931-1725 |
| Location Address: 63 EDWARD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/13/2017 |
| NOC: RECORDED |
| Applicant name: JOSEPH ALEIXO PORTAL |
| Owner: MUNIZ, JORGE & DELIA N |
|
Address 1689 E 3RD AVE BAY SHORE, NY 11706 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SWEETWATER CUSTOM HOMES INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1105 LAMBERT AVENUE FLAGLER BEACH, FL 32136 |
CBC1252965 (Exp: 08/31/2024) | 386-931-1725 | 386-439-4676 |
Sub Contractors
JAMES ALLEN TAYLOR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
265 TYMBER CREEK ROAD ORMOND BEACH, FL 32174 |
CCC1326819 (Exp: 08/31/2022) | (386)290-0281 | (386)673-5216 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
CHARLES K DAVIS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3000 E MOODY BLVD BLDG 2 BUNNELL , FL 32110 |
EC13004270 (Exp: 08/31/2026) | 386-931-6614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/08/2018 | FINAL APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL INSPECTION | 03/08/2018 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION, ASPHALT REPAIR COMPLETE | |||
| BLD - BUILDING FINAL | 03/07/2018 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Provide systems ground for low-volt/Strap meter mast/Illuminate back porch exits/Missing light at entry/Switch plate laundry room/Provide water hammer at dishwasher | |||
| ROW - FINAL INSPECTION | 03/07/2018 | Disapproved -FEE REQUIRED | CTROHA |
| Note: REPAIR ROAD DAMAGE SEE MARKING PAINT | |||
| ROW - FINAL APRON (AFTER POUR) | 03/01/2018 | APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 03/01/2018 | FINAL APPROVED | MBACON |
| FINAL SURVEY (OFFICE USE ONLY) | 02/23/2018 | APPROVED | DREWIS |
| ELECTRIC - EARLY POWER | 12/14/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: spoke to dell fpl released early power 3:00 | |||
| ROW- PRE-APRON (PRE-POUR) | 11/09/2017 | APPROVED | CTROHA |
| Note: READY FOR PAVERS It is the BUILDER'S RESPONSIBILITY: to form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 11/09/2017 | APPROVED - AS NOTED | CTROHA |
| Note: OLD IN SPECTION CODE DO NOT USE 7030 | |||
| ROW- PRE-APRON (PRE-POUR) | 11/02/2017 | PARTIALLY APPROVED | CTROHA |
| Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. COLLAR AROUND PIPE ONLY | |||
| U - SEWER TIE IN | 09/29/2017 | APPROVED | MBACON |
| GRAVITY SEWER TEST | 09/29/2017 | APPROVED | JGIBSON |
| ROW - DRAINAGE | 08/18/2017 | APPROVED | CTROHA |
| Note: WORK COMPLETE | |||
| ROW - DRAINAGE | 08/14/2017 | Disapproved - NO FEE | CTROHA |
| Note: MOVE DUMPSTER AND CLEAN UP SWALE RESTABLISH DRAINAGE THROUGH THE SWALE | |||
| ELECTRIC-TUG | 07/17/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION PER CONTRACTOR SPOKE TO SUSAN FPL RELEASED TUG POWER 2:30 | |||
| ELECTRIC-TUG | 07/14/2017 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: NEED APPROVED SET OF PLANS ON SITE FOR INSPECTION, NEED ELECTRIC RISER DIAGRAM, THERE IS NOT A GROUND TO METER DISCONNECT NEC 250.66 | |||
| INSULATION | 07/05/2017 | APPROVED | DROCKWELL |
| LATH/BRICK/ WATER BARRIER | 06/28/2017 | APPROVED | DROCKWELL |
| ALL ROUGH | 06/26/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION per cpntractor | |||
| ALL ROUGH | 06/08/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: No pressure on supply side/No test on sanitary lines/Frame elec panel/Install fixed glass framing at nook/Tighten threaded rods/Dryer duct in chase at top plate | |||
| ROOF VALLEY & METAL | 05/24/2017 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/25/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/12/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Bolting not completed add studs under girder 3 points | |||
| TIE BEAM / LINTEL | 03/17/2017 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 03/16/2017 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 03/01/2017 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/21/2017 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 02/23/2018 | 02/23/2018 |
| Note: Released By: DREWIS final survey | |||
| ZON | COMPLETE | 11/09/2017 | 11/13/2017 |
| Note: Released By: TAWILLIAMS | |||
| ZON | COMPLETE | 10/30/2017 | 10/31/2017 |
| Note: Released By: TAWILLIAMS | |||
| ZON | HOLD | 10/06/2017 | 10/06/2017 |
| Note: Held By: TAWILLIAMS 1)Need site plan, please show setbacks to property line. 2) Need a Right-Of-Way Utilization Agreement signed by all owers as listed on the deed, The signatures must be notarized and we need the original | |||
| SW1 | COMPLETE | 10/06/2017 | 10/09/2017 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 10/06/2017 | 10/09/2017 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 04/20/2017 | 04/25/2017 |
| SW1 | COMPLETE | 03/15/2017 | 03/16/2017 |
| Note: Released By: JHINDMAN FOUNDATION | |||
| ZON | COMPLETE | 01/03/2017 | 01/03/2017 |
| UD1 | COMPLETE | 01/03/2017 | 01/04/2017 |
| ELEC | COMPLETE | 01/03/2017 | 01/10/2017 |
| BLD | COMPLETE | 12/07/2016 | 12/14/2016 |
| ELEC | HOLD | 12/07/2016 | 12/14/2016 |
| Note: 1. Provide a smoke/co detector 5th ed. FBC R 314. J. Hindman 986-3784. | |||
| ENGIN1 | COMPLETE | 12/07/2016 | 12/13/2016 |
| MECH | COMPLETE | 12/07/2016 | 12/15/2016 |
| PLUM | COMPLETE | 12/07/2016 | 12/15/2016 |
| SW1 | COMPLETE | 12/07/2016 | 12/14/2016 |
| UD1 | HOLD | 12/07/2016 | 12/09/2016 |
| Note: PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. | |||
| ZON | HOLD | 12/07/2016 | 12/08/2016 |
| Note: Please provide color swatches for exterior walls and garage doors. T. Williams 986-3751 | |||
| URB | COMPLETE | 12/07/2016 | 12/08/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤40.00 | 03/09/2018 |
| RECORDING FEE REIMBURSE DOC | ¤52.50 | 03/09/2018 |
| REINSPECTION FEE | ¤40.00 | 03/09/2018 |
| REINSPECTION FEE | ¤40.00 | 03/09/2018 |
| REINSPECTION FEE | ¤40.00 | 03/09/2018 |
| REINSPECTION FEE | ¤40.00 | 03/09/2018 |
| REINSPECTION FEE | ¤40.00 | 03/09/2018 |
| REVISION | ¤40.00 | 03/09/2018 |
| SITE PLAN 20 | ¤20.00 | 01/13/2017 |
| SURCHARGE FS 533.721 | ¤19.62 | 01/13/2017 |
| SURCHARGE - FS 468.631 | ¤19.62 | 01/13/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/13/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 01/13/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤518.00 | 01/13/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 01/13/2017 |
| MECHANICAL FEE | ¤215.40 | 01/13/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/13/2017 |
| PLAN CHECK FEE | ¤103.60 | 01/13/2017 |
| PLUMBING FEE | ¤215.40 | 01/13/2017 |
| ELECTRIC FEE | ¤215.40 | 01/13/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.43) | 01/13/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤214.29 | 01/13/2017 |
| IMPACT FEE PARKS | ¤849.24 | 01/13/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/13/2017 |
| ADMIN FEE | ¤20.00 | 01/13/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,422.09 |