I want to search for...
Permit #2016120326
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00340-0090 |
| CONDITIONED SPACE: 1875 sqft |
| OPENED PORCH (WITH ROOF) : 252 sqft |
| OPENED PORCH (WITH ROOF) : 67 sqft |
| GARAGE: 750 sqft |
| Total Square Footage: 2944 sqft |
| Block: 00340 |
| Subdivision: 2211 - SECTION 59-SEMINOLE PARK |
| Job Phone: 386-931-1725 |
| Location Address: 31 SEA FLOWER PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/24/2017 |
| NOC: RECORDED |
| Applicant name: JOSEPH ALEIXO PORTAL |
| Owner: SOUZA, LESLIE D |
|
Address 27 SEA FLOWER PATH PALM COAST, FL 32164 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SWEETWATER CUSTOM HOMES INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1105 LAMBERT AVENUE FLAGLER BEACH, FL 32136 |
CBC1252965 (Exp: 08/31/2024) | 386-931-1725 | 386-439-4676 |
Sub Contractors
JAMES ALLEN TAYLOR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
265 TYMBER CREEK ROAD ORMOND BEACH, FL 32174 |
CCC1326819 (Exp: 08/31/2022) | (386)290-0281 | (386)673-5216 |
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/31/2018 | FINAL APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION per contractor | |||
| BLD - BUILDING FINAL | 01/23/2018 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Need revision to show additional electric. Soffit cans/Fireplace. Garage door into house from garage must self close and latch | |||
| ROW - FINAL INSPECTION | 01/22/2018 | APPROVED | CTROHA |
| Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 01/22/2018 | FINAL APPROVED | MBACON |
| Note: Please cut sewer clean out to grade | |||
| ROW - FINAL APRON (AFTER POUR) | 01/19/2018 | APPROVED | CTROHA |
| Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION | |||
| ROW - FINAL INSPECTION | 01/19/2018 | Disapproved - NO FEE | CTROHA |
| Note: SEED AND STRAW ADJ PROPERTY TO THE REAR | |||
| U - SEWER TIE IN | 01/09/2018 | APPROVED | MBACON |
| Note: THIS IS A REINSPECTION This was inspected on 8-26 and was never called in. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/05/2018 | APPROVED | DREWIS |
| ELECTRIC - EARLY POWER | 11/28/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED EARLY POWER 10:05 | |||
| ROW - FINAL APRON (AFTER POUR) | 10/19/2017 | Disapproved -FEE REQUIRED | CTROHA |
| Note: FINAL SURVEY IS REQUIRED FOR FINAL APRON INSPECTION | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 10/16/2017 | CANCELLED BY INSPECTOR | CTROHA |
| Note: 7030 IS NOT A VALID CODE | |||
| ROW- PRE-APRON (PRE-POUR) | 10/16/2017 | APPROVED | CTROHA |
| Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| U - SEWER TIE IN | 08/25/2017 | Disapproved - NO FEE | MBACON |
| Note: sewer tie in is not visible | |||
| GRAVITY SEWER TEST | 08/25/2017 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 06/26/2017 | APPROVED | DROCKWELL |
| INSULATION | 06/12/2017 | APPROVED | DROCKWELL |
| ALL ROUGH | 06/08/2017 | APPROVED - AS NOTED | DROCKWELL |
| Note: Have 10ft head on sanitary line by next inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/02/2017 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/30/2017 | CANCELLED BY INSPECTOR | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 05/30/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 05/25/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Roof is shingled.Missed inspection. Cannot see valley sheets in some areas. Call building official for direction | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/10/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Pocket door assembly is an exterior wall.Provide detail for anchoring to wall, header and floor/Strap 2x6 rafters to trusses below left side load path required | |||
| TIE BEAM / LINTEL | 04/07/2017 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 04/03/2017 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 03/14/2017 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/24/2017 | APPROVED | DROCKWELL |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 01/24/2018 | 01/29/2018 |
| Note: Released By: DREWIS | |||
| SW1 | COMPLETE | 01/04/2018 | 01/05/2018 |
| Note: Released By: DREWIS final s | |||
| PLUM | COMPLETE | 07/19/2017 | 07/26/2017 |
| Note: Released By: FREODICA Revision: Changed sanitary riser diagram | |||
| ELEC | COMPLETE | 07/19/2017 | 07/26/2017 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 07/19/2017 | 07/26/2017 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 05/30/2017 | 06/01/2017 |
| BLD | COMPLETE | 05/18/2017 | 05/25/2017 |
| ELEC | COMPLETE | 04/20/2017 | 04/25/2017 |
| SW1 | COMPLETE | 04/03/2017 | 04/03/2017 |
| Note: Released By: JHINDMAN FOUNDATION S | |||
| BLD | COMPLETE | 03/09/2017 | 03/13/2017 |
| PLUM | COMPLETE | 01/18/2017 | 01/23/2017 |
| UD1 | COMPLETE | 01/03/2017 | 01/04/2017 |
| ELEC | COMPLETE | 01/03/2017 | 01/11/2017 |
| BLD | COMPLETE | 01/03/2017 | 01/09/2017 |
| PLUM | HOLD | 01/03/2017 | 01/09/2017 |
| Note: Repeat comment; Provide vent for the shower or tub fixture drain at master bathroom per FBCR 5th ed. P3108. | |||
| MECH | COMPLETE | 01/03/2017 | 01/09/2017 |
| BLD | HOLD | 12/08/2016 | 12/15/2016 |
| Note: 1. Identify the lintels on the floorplan. 5th ed. FBC 107.2.1. J. Hindman 986-3784. | |||
| ELEC | HOLD | 12/08/2016 | 12/15/2016 |
| Note: 1. Provide a smoke/co detector outside of the master bedroom door. 5th ed. FBC R 314 and 315. J. Hindman 986-3784. | |||
| ENGIN1 | COMPLETE | 12/08/2016 | 12/14/2016 |
| MECH | HOLD | 12/08/2016 | 12/15/2016 |
| Note: Provide signature of builder on energy performance level(EPL) display card per FBCEC 5th ed. R401.3. F.Reodica - 386-986-4734. | |||
| PLUM | HOLD | 12/08/2016 | 12/15/2016 |
| Note: Provide vent for the shower or tub fixture drain at master bathroom per FBCR 5th ed. P3108. | |||
| SW1 | COMPLETE | 12/08/2016 | 12/15/2016 |
| UD1 | HOLD | 12/08/2016 | 12/09/2016 |
| Note: PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. | |||
| ZON | COMPLETE | 12/08/2016 | 12/08/2016 |
| URB | COMPLETE | 12/08/2016 | 12/09/2016 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 01/31/2018 |
| REVISION | ¤40.00 | 01/31/2018 |
| REVISION | ¤40.00 | 01/31/2018 |
| REVISION | ¤40.00 | 01/31/2018 |
| REVISION | ¤40.00 | 01/31/2018 |
| REVISION | ¤40.00 | 01/31/2018 |
| REINSPECTION FEE | ¤40.00 | 01/31/2018 |
| REINSPECTION FEE | ¤40.00 | 01/31/2018 |
| REINSPECTION FEE | ¤40.00 | 01/31/2018 |
| REINSPECTION FEE | ¤40.00 | 01/31/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤504.00 | 01/24/2017 |
| SITE PLAN 20 | ¤20.00 | 01/24/2017 |
| SURCHARGE FS 533.721 | ¤19.18 | 01/24/2017 |
| SURCHARGE - FS 468.631 | ¤19.18 | 01/24/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/24/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 01/24/2017 |
| ADMIN FEE | ¤20.00 | 01/24/2017 |
| ELECTRIC FEE | ¤211.20 | 01/24/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.43) | 01/24/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤214.29 | 01/24/2017 |
| IMPACT FEE PARKS | ¤849.24 | 01/24/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/24/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 01/24/2017 |
| MECHANICAL FEE | ¤211.20 | 01/24/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/24/2017 |
| PLAN CHECK FEE | ¤100.80 | 01/24/2017 |
| PLUMBING FEE | ¤211.20 | 01/24/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,459.31 |