I want to search for...
Permit #2016120764
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00030-0010 |
| CONDITIONED SPACE: 2864 sqft |
| GARAGE: 499 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| OPENED PORCH (WITH ROOF) : 809 sqft |
| Total Square Footage: 4263 sqft |
| Block: 00030 |
| Subdivision: 2108 - Hidden Lakes- Phase II-Toscana |
| Job Phone: 863-420-2100 |
| Location Address: 15 NEW WATER OAK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/26/2017 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
531 CODISCO WAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2018) | (407)333-2665 | (407)585-1002 |
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
KYLE G ROE
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
2048 APEX COURT APOPKA, FL 32703 |
CFC1425725 (Exp: 08/31/2024) | 407-898-2023 | 407-648-5654 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL SURVEY (OFFICE USE ONLY) | 01/10/2018 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION Reviewed by Jerry Hindman on 12-28-17. | |||
| BLD - BUILDING FINAL | 01/10/2018 | FINAL APPROVED | CMINI |
| ROW - FINAL INSPECTION | 01/09/2018 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. ADA MAT TO BE INSTALLED AT THE CORNER. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/08/2018 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-reuse now connected PLEASE REMOVE EXCESS SOILS FROM WATER METER PIT | |||
| ROW - FINAL APRON (AFTER POUR) | 01/08/2018 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL INSPECTION | 01/08/2018 | Disapproved -FEE REQUIRED | RGROSS |
| Note: ADA MAT NEEDED FROM SIDEWALK TO STREET TRANSITION | |||
| ROW- PRE-APRON (PRE-POUR) | 01/05/2018 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. SECOND PART OF THE PRE POUR. INSPECTED THE DAY BEFORE. READY FOR PAVERS. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/03/2018 | Disapproved -FEE REQUIRED | RGROSS |
| Note: FINAL APPROVED SURVEY NOT ON SITE. SECOND PART OF THE PRE POUR NEEDS TO BE APPROVED BEFORE FINAL APRON. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/03/2018 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: re-use meter not yet connected to home irrigation line,plumber not on site ; reminded builder supervisor to remove excess soils in water meter pit | |||
| FINAL SURVEY (OFFICE USE ONLY) | 01/03/2018 | Disapproved - NO FEE | CMINI |
| Note: need to submit to office, not a call in inspection | |||
| ELECTRIC - EARLY POWER | 11/30/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED EARLY POWER 3:30 | |||
| ROW- PRE-APRON (PRE-POUR) | 10/16/2017 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR SIDEWALK AND APRON POUR ONLY. | |||
| INSULATION | 08/10/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 08/10/2017 | APPROVED | DROCKWELL |
| INSULATION | 08/09/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Fireblock archway/Fireblock all drop ceilings/Firefoam service panel and all penetrations thru top plate | |||
| ALL ROUGH | 08/02/2017 | APPROVED - AS NOTED | CMINI |
| Note: fireblocking FBC 302. minimize gaps in door jams | |||
| ALL ROUGH | 08/01/2017 | CANCELLED BY APPLICANT | AIRS WEB |
| TIE BEAM / LINTEL | 07/28/2017 | APPROVED - AS NOTED | CMINI |
| Note: pool house completion | |||
| GAS ROUGH | 07/24/2017 | APPROVED | CMINI |
| ROOF VALLEY & METAL | 07/21/2017 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/20/2017 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/14/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION. trusses not strapped at entry, need revision for arch window headers | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/12/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION. need to see straps on headers front entry. missing headers over windows per detail. need to remove plywood showing kneewall | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/20/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: missing straps, missing headers, missing kneewalls, need repair revision for cut truss. LVLs not complete per plan. remove plywood on arches so we can see tie downs. remove soffits for inspection. not ready, incomplete inspection | |||
| ELECTRIC-TUG | 05/25/2017 | APPROVED - AS NOTED | CMINI |
| Note: SPOKE TO DELL FPL RELEASED TUG 1:20 | |||
| ROOF VALLEY & METAL | 05/25/2017 | Disapproved - NO FEE | CMINI |
| Note: need to have roof sheathing, braces, ties and down cell approved before this inspection | |||
| TIE BEAM / LINTEL | 03/21/2017 | APPROVED | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 03/09/2017 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 03/07/2017 | APPROVED | LMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/03/2017 | APPROVED | CMINI |
| GRAVITY SEWER TEST | 03/03/2017 | APPROVED | CMINI |
| U - SEWER TIE IN | 03/03/2017 | APPROVED | JNICHOLS |
| FOOTER | 02/10/2017 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 12/22/2017 | 12/28/2017 |
| Note: Released By: JHINDMAN final survey cannot complete inspection due to invalid NOC | |||
| BLD | COMPLETE | 12/22/2017 | 12/22/2017 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 07/10/2017 | 07/10/2017 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 06/19/2017 | 06/20/2017 |
| Note: Released By: JHINDMAN | |||
| BLD | HOLD | 06/09/2017 | 06/12/2017 |
| Note: Held By: JHINDMAN 1. Provide revised energy calculations and manufacturers specifications for the spray foam with the ignition barrier. 5th ed. FBC 107.2.1. | |||
| BLD | COMPLETE | 06/06/2017 | 06/08/2017 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 03/08/2017 | 03/09/2017 |
| Note: Released By: JHINDMAN FOUNDATION S | |||
| PLUM | COMPLETE | 01/18/2017 | 01/23/2017 |
| ZON | COMPLETE | 01/04/2017 | 01/05/2017 |
| URB | COMPLETE | 01/04/2017 | 01/09/2017 |
| ELEC | COMPLETE | 01/04/2017 | 01/12/2017 |
| PLUM | HOLD | 01/04/2017 | 01/11/2017 |
| Note: Repeat comment: Sanitary riser diagram does not match with floor plan. Washing machine and laundry tub drains were shown twice on riser. Coordinate per FBC 5th ed. 107.2.1. F.Reodica - 386-986-4734. | |||
| URB | HOLD | 12/20/2016 | 12/21/2016 |
| Note: Need to add 1 street tree. The approved street tree plan shows 4 street trees for this lot 2 Live oak. 1 Laurel oak and 1 Drake elm. Also note street tree planting must be minimum 5ft from all curbs, sidewalks, driveways and utilities. spacing 50ft on center with a maximum 12ft 6in. from the ROW. | |||
| BLD | COMPLETE | 12/19/2016 | 12/21/2016 |
| ELEC | HOLD | 12/19/2016 | 12/21/2016 |
| Note: 1. Provide electrical load calculations per 2011 NEC art. 220. J. Hindman 986-3784. | |||
| ENGIN1 | COMPLETE | 12/19/2016 | 12/20/2016 |
| MECH | COMPLETE | 12/19/2016 | 12/22/2016 |
| PLUM | HOLD | 12/19/2016 | 12/22/2016 |
| Note: Sanitary riser diagram does not match with floor plan. Washing machine and laundry tub drains were shown twice on riser. Coordinate per FBC 5th ed. 107.2.1. F.Reodica - 386-986-4734. | |||
| SW1 | COMPLETE | 12/19/2016 | 12/22/2016 |
| UD1 | COMPLETE | 12/19/2016 | 12/20/2016 |
| Note: This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 12/19/2016 | 12/20/2016 |
| Note: 1) Address issue. Can't finish zoning review 2) Landscaping : *REQUIRED SCREENING: Above ground structures such as: dumpster enclosures, mechanical equipment, backflow preventers, wells, pumps, tanks, ground-mounted HVAC units, transformers, generators, storage sheds, lift stations, utility cabinets, electrical panels, or ground-mounted cable/satellite television equipment; shall have a medium screen planting, as described in Table 11-4. If the structures are in areas that are visible from an improved public rights-of-way, a medium screen planting as described in Table 11-4 (**see excerpt from table below) shall be provided between the structures and the rights-of-way. If the structures are in areas that are visible from a parking lot or abutting property without an intervening buffer, fence, or wall, then a medium screen planting, as described in Table 11-4, shall be provided between the structures and the parking lot or abutting property. (LDC 11.03.01.H.) **From Table 11-4: (Medium screen planting) shrubs 2 ½’ in height, 7-gallon container, and maximum 4’ on-center spacing. Shrubs shall achieve a minimum height of 3’ within 2 years. REQUIRED PLANTINGS: Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. On corner lots, six (6) shrubs shall be planted on each side of the home facing a street, and (4) shrubs planted on the interior side of the home. All of these required shrubs shall be planted between two and one-half (2 ½) and eight (8) feet of the home’s foundation. The corners of the house shall be wrapped with shrubbery or have an understory tree planted there. (LDC 11.03.02.D.2.a,b,c) T Williams 386-986-2655 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 01/08/2018 |
| REINSPECTION FEE | ¤40.00 | 01/08/2018 |
| REVISION | ¤40.00 | 12/29/2017 |
| REVISION | ¤40.00 | 10/23/2017 |
| REVISION | ¤40.00 | 10/23/2017 |
| REVISION | ¤40.00 | 10/23/2017 |
| REINSPECTION FEE | ¤40.00 | 10/23/2017 |
| REINSPECTION FEE | ¤40.00 | 10/23/2017 |
| REINSPECTION FEE | ¤40.00 | 10/23/2017 |
| REINSPECTION FEE | ¤40.00 | 10/23/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤750.00 | 01/26/2017 |
| ADMIN FEE | ¤20.00 | 01/26/2017 |
| ELECTRIC FEE | ¤285.00 | 01/26/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.43) | 01/26/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤214.29 | 01/26/2017 |
| IMPACT FEE PARKS | ¤849.24 | 01/26/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/26/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 01/26/2017 |
| MECHANICAL FEE | ¤285.00 | 01/26/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/26/2017 |
| PLAN CHECK FEE | ¤150.00 | 01/26/2017 |
| PLUMBING FEE | ¤285.00 | 01/26/2017 |
| SITE PLAN 20 | ¤20.00 | 01/26/2017 |
| SURCHARGE FS 533.721 | ¤26.93 | 01/26/2017 |
| SURCHARGE - FS 468.631 | ¤26.93 | 01/26/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/26/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 01/26/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,991.41 |