I want to search for...

Permit #2016121035

Permit Details

Status: COED

Parcel Id: 16-11-31-4575-00000-0060
CONDITIONED SPACE: 2600 sqft
GARAGE: 660 sqft
OPENED PORCH (WITH ROOF) : 305 sqft
OPENED PORCH (WITH ROOF) : 50 sqft
Total Square Footage: 3615 sqft
Block: 00000
Subdivision: 2122 - North Park Estates at Grand Haven
Job Phone: (386)383-0376
Location Address: 58 WATERFRONT PARK RD
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/09/2017
NOC: RECORDED
Applicant name: ANTHONY CRAIG GUCCIONE
Owner: MAZIYA, MARIA

Address

1009 N UMBERLAND ST

MORRISTOWN, NY 13664

Lot: 0060
Contracted Stated Job Value: ¤400,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLD COAST HOME BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 354707

PALM COAST, FL 32137

CGC1507791 (Exp: 08/31/2026) 386-313-6221

Sub Contractors

BERT S MCLAUGHLIN
Status Location Address State License Number Phone
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13006455 (Exp: 08/31/2026) 386-265-2687
JOHN BRADLEY WINFREY JR
Status Location Address State License Number Phone Fax
ACTIVE

1685 S. CLARA AVE

Deland, FL 32720

CFC054901 (Exp: 08/31/2026) 386-734-0154 386-734-2751
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone Fax
CANCEL

2 HARGROVE GRADE

PALM COAST, FL 32136

CAC048127 (Exp: 08/31/2018) 386-445-5023 386-446-4614
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/12/2017 FINAL APPROVED CMINI
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 10/11/2017 Disapproved -FEE REQUIRED WMILLER
Note: 1. SHOWER ACCESS MINIMUM CLEAR OPEN WIDTH 26. 2708.1.1 2. NEED INSULATION CERT ON SITE AND POSTED 3. NEED APPROVED FINAL ON SITE AT TIME OF FINAL 4. ANTI-TIPPING BRACKET IS NOT INSTALLED ON STOVE PER E4101.2
ROW - FINAL APRON (AFTER POUR) 10/10/2017 APPROVED RGROSS
ROW - FINAL INSPECTION 10/10/2017 APPROVED RGROSS
U -UTILITY RESIDENTIAL FINAL 10/10/2017 FINAL APPROVED LFITZGERALD
Note: per agreement w/Jim-Gold Coast -the 6" cleanout will have a flush mount cap and the 4" cleanout will be capped and buried.
FINAL SURVEY (OFFICE USE ONLY) 09/26/2017 APPROVED DREWIS
U-REUSE METER 09/08/2017 APPROVED LFITZGERALD
ELECTRIC - EARLY POWER 08/21/2017 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 11:30
ROW- PRE-APRON (PRE-POUR) 08/09/2017 PARTIALLY APPROVED CTROHA
Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. PAVERS ONLY
ROW- PRE-APRON (PRE-POUR) 08/07/2017 CANCELLED BY APPLICANT AIRS WEB
TUB SET 08/07/2017 APPROVED - AS NOTED JGIBSON
Note: BOTH SOAKER TUBS ARE SET AND TUB ROUGH BOXES SEALED
INSULATION 06/29/2017 APPROVED LMILLER
Note: THIS IS A REINSPECTION
INSULATION 06/28/2017 Disapproved -FEE REQUIRED LMILLER
Note: THIS IS A REINSPECTION 1. BAFFLES REQUIRED 26 IN ACCORDANCE WITH FBC ENERGY CONSERVATION R303.2.1 AND MANUFACTURER SPECS. (Baffles required at changes in ceiling heights) 2. FIREBLOCKING R302.11 1-6 non-fire rated foam at fire blocking in front wall and missing in back wall 3. reatach loose baffles along exterior wall (wind blown)
INSULATION 06/23/2017 Disapproved -FEE REQUIRED DROCKWELL
Note: Not ready for inspection.Baffels,yardsticks not installed
ALL ROUGH 06/21/2017 APPROVED - AS NOTED DROCKWELL
Note: Have 10ft head on sanitary lines by next inspection
LATH/BRICK/ WATER BARRIER 06/12/2017 APPROVED DROCKWELL
WINDOW NAILING 06/01/2017 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/18/2017 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION. approved per revision
ROOF VALLEY & METAL 05/17/2017 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/08/2017 Disapproved -FEE REQUIRED LMILLER
Note: NEED TO ADD X-BRACING PER DETAILS TB01, AND TB05 (CIRCLED ON PLANS) MISSING STRAPS AT LOCATION (M) CIRCLED ON PLANS) SHEATHING AND DOWN CELLS PASSED.... (OK TO DRY IN)
ELECTRIC-TUG 04/04/2017 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION SPOKE TO SUSAN FPL RELEASED TUG 2:50
ELECTRIC-TUG 04/03/2017 CANCELLED BY APPLICANT RMARTIN
TIE BEAM / LINTEL 03/07/2017 APPROVED DROCKWELL
ELEV CERT-FOUNDATION APPROVAL 03/06/2017 APPROVED DBEVAN
FOUND SURVEY APPROVED (OFFICE) 03/06/2017 APPROVED JHINDMAN
MONOLITHIC SLAB 02/20/2017 APPROVED LMILLER
PLUMBING 1ST ROUGH UNDERGROUND 02/15/2017 APPROVED LMILLER
GRAVITY SEWER TEST 02/15/2017 APPROVED LMILLER
U - SEWER TIE IN 02/15/2017 APPROVED DSPENCER

Review History

Department Status Date In Date Out
SW1 COMPLETE 09/26/2017 09/26/2017
Note: Released By: DREWIS final survey
PLFM COMPLETE 09/26/2017 09/27/2017
Note: Released By: DRAMIREZ
BLD COMPLETE 05/16/2017 05/18/2017
Note: Revision; truss repair
BLD COMPLETE 05/02/2017 05/04/2017
PLFM COMPLETE 03/02/2017 03/03/2017
Note: The provided elevation certificate (EC) sealed on 03-01-17 has different elevations for sections C2d and C2e when compared to the previously approved EC sealed on 02-13-17. The noted elevations remain in compliance with the floodplain management regulations. According to direction given as part of recent staff training, please note that sections A9b) and A9c) cannot have “N/A” for a measurement; a “0” is an acceptable entry for future ECs at the at two (2) future stages: 1) Building Under Construction (at foundation) and 2) Finished Construction (final).
SW1 COMPLETE 03/01/2017 03/06/2017
Note: Released By: JHINDMAN foundation s
PLFM COMPLETE 02/14/2017 02/14/2017
Note: Amended elevation certificate has satisfied comments at this stage. Please note that an additional elevation certificate will be required at two (2) future stages: 1) Building Under Construction (at foundation) and 2) Finished Construction (final)
PLFM HOLD 02/10/2017 02/13/2017
Note: On submitted correction sheet, it noted that FFE was changed to 11.95’. Provide a new elevation certificate utilizing form OMB No. 1660-0008 with expiration: November 30, 2018 that reflects any applicable changes for “construction drawings” stage. Note that stem wall construction will also need to be reflected in Section A7 if applicable.
ENGIN1 COMPLETE 02/09/2017 02/09/2017
SW1 COMPLETE 02/09/2017 02/10/2017
ZON COMPLETE 02/09/2017 02/09/2017
BLD COMPLETE 12/22/2016 12/27/2016
ELEC COMPLETE 12/22/2016 12/27/2016
ENGIN1 COMPLETE 12/22/2016 12/29/2016
MECH COMPLETE 12/22/2016 12/28/2016
PLUM COMPLETE 12/22/2016 12/27/2016
SW1 COMPLETE 12/22/2016 12/28/2016
UD1 COMPLETE 12/22/2016 12/28/2016
ZON COMPLETE 12/22/2016 12/28/2016
PLFM COMPLETE 12/22/2016 12/22/2016
Note: Informational: Based on the proposed and existing elevations, staff anticipates the potential justification for a retaining wall. If a retaining wall is utilized, the A7 field will be affected on the elevation certificate. The provided elevation certificate has been deemed sufficient. In future submittals of elevation certificates, the signing and sealing professional shall utilize the elevation certificate form OMB No. 1660-0008 with expiration: November 30, 2016. A community is not allowed to take the July 31, 2015 after December 31, 2016. Please note that an additional elevation certificate will be required at two (2) future stages: 1) Building Under Construction (at foundation) and 2) Finished Construction (final)

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 10/11/2017
REINSPECTION FEE ¤40.00 10/10/2017
REINSPECTION FEE ¤40.00 10/10/2017
REINSPECTION FEE ¤40.00 10/10/2017
REVISION ¤40.00 10/10/2017
REVISION ¤40.00 10/10/2017
SITE PLAN 20 ¤20.00 01/09/2017
SURCHARGE FS 533.721 ¤28.50 01/09/2017
SURCHARGE - FS 468.631 ¤28.50 01/09/2017
STORM WATER PERMIT FEES ¤80.00 01/09/2017
3% TRANS IMPACT FEE CREDIT (¤93.74) 01/09/2017
NEW RESIDENTIAL INSPECTIONS ¤800.00 01/09/2017
ADMIN FEE ¤20.00 01/09/2017
ELECTRIC FEE ¤300.00 01/09/2017
3% FIRE IMPACT FEE CREDIT (¤6.43) 01/09/2017
IMPACT FEE FIRE NONRESIDENTIAL ¤214.29 01/09/2017
IMPACT FEE PARKS ¤849.24 01/09/2017
IMPACT FEE SCHOOL ¤3,600.00 01/09/2017
IMPACT FEE TRANSPORTATION ¤3,124.67 01/09/2017
MECHANICAL FEE ¤300.00 01/09/2017
3% PARKS IMPACT FEE CREDIT (¤25.48) 01/09/2017
PLAN CHECK FEE ¤160.00 01/09/2017
PLUMBING FEE ¤300.00 01/09/2017
Fees Total Due: ¤0.00 Total Paid: ¤9,939.55