I want to search for...
Permit #2017011028
Permit Details
Status: COED
| Parcel Id: 07-11-31-7015-00030-1640 |
| CONDITIONED SPACE: 2670 sqft |
| GARAGE: 824 sqft |
| OPENED PORCH (WITH ROOF) : 129 sqft |
| OPENED PORCH (WITH ROOF) : 372 sqft |
| Total Square Footage: 3995 sqft |
| Block: 00030 |
| Subdivision: 2194 - SECTION 15-COUNTRY CLUB COVE |
| Job Phone: 386-236-4133 |
| Location Address: 9 CARLOS CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/01/2017 |
| NOC: RECORDED |
| Applicant name: LEONARDO CIRO SANCLEMENTE |
| Owner: DARVILLE, BRIAN R & STEPHANIE |
|
Address 12055 MODENA LANE ORLANDO, FL 32827 |
| Lot: 1640 |
| Contracted Stated Job Value: ¤371,768.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INTERVEST CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone |
| CANCEL |
2379 BEVILLE RD DAYTONA BEACH, FL 32119 |
CBC1261237 (Exp: 08/31/2020) | 386-236-4133 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
CHARLES H KULP
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
5401 ENERGY AIR CT ORLANDO, FL 32810 |
CAC018270 (Exp: 08/31/2022) | 407-886-3729 | 407-886-7580 |
BARRY D MARTIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1650 N STATE STREET Bunnell, FL 32110 |
CCC033728 (Exp: 08/31/2020) | (386) 437-7700 | (386)437-7701 |
KEN DEPRINZIO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
325 WALKER STREET HOLLY HILL, FL 32117 |
11351 (Exp: 08/31/2026) | 386-672-8494 | 386-673-7856 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/19/2017 | FINAL APPROVED | CMINI |
| ROW - FINAL INSPECTION | 12/18/2017 | APPROVED | CTROHA |
| Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION | |||
| ROW - FINAL INSPECTION | 12/15/2017 | Disapproved -FEE REQUIRED | RGROSS |
| Note: per william. SEED AND STRAW ALL BARE EARTH AREAS ALONG BOTH SIDES OF PROPERTY. SOD ALL BARE EARTH ON BOTH SIDES IN THE REAR WHERE SEDIMENT CAN ENTER THE CANAL. NOTE: PERMIT PULLED FOR CONSTRUCTION ON THE VACANT NEXT DOOR. NO SOD NEEDED IN THE ROW ON THE VACANT. CULVERT PIPE CHECKED AND APPROVED BY ROBERT. SWALE PLAN WAS ADJUSTED TWICE. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/13/2017 | APPROVED | DREWIS |
| U -UTILITY RESIDENTIAL FINAL | 12/12/2017 | FINAL APPROVED | JNICHOLS |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 12/08/2017 | Disapproved -FEE REQUIRED | JNICHOLS |
| Note: the clean out cap and the adapter for the cap were broke. Also the pipe that which this cap is on is broke beneath the ground about 12" down. This needs to be repaired. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/08/2017 | APPROVED | RGROSS |
| ROW- PRE-APRON (PRE-POUR) | 11/28/2017 | APPROVED - AS NOTED | RGROSS |
| Note: SMALL WASHOUT NEEDS REGRADED. READY TO POUR | |||
| ELECTRIC - EARLY POWER | 11/28/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 2:40 | |||
| ROW- PRE-APRON (PRE-POUR) | 11/15/2017 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 11/14/2017 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Swale plan was revised. New Culvert Elevation 6.50. Property line to the left is 6.60. Questions call Robert 386-793-3980. CULVERT BAND BRACKET AND BOLTS CANNOT BE FACE UP. BRACKET NEEDS TO BE ON THE SIDE OF THE CULVERT WITH BOLTS FACED DOWN. | |||
| U - SEWER TIE IN | 11/08/2017 | APPROVED | JNICHOLS |
| Note: THIS IS A REINSPECTION | |||
| U - SEWER TIE IN | 10/31/2017 | CANCELLED BY APPLICANT | JNICHOLS |
| Note: telephone pole is in the way | |||
| GRAVITY SEWER TEST | 10/31/2017 | APPROVED | JGIBSON |
| GAS ROUGH | 10/03/2017 | APPROVED | CMINI |
| INSULATION | 10/03/2017 | APPROVED | CMINI |
| LATH/BRICK/ WATER BARRIER | 09/29/2017 | APPROVED | CMINI |
| ALL ROUGH | 09/22/2017 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION. still need to strap SER cable with-in 12" of panel | |||
| ALL ROUGH | 09/01/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: need to frame panel. missing 10' head on DWV. missing nail plate on electric in kitchen. missing straps on SER cable coming out of panel | |||
| ROOF VALLEY & METAL | 08/28/2017 | APPROVED | CMINI |
| WALL SHEATHING | 08/17/2017 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/17/2017 | APPROVED - AS NOTED | CMINI |
| Note: need to add connections to shear wall, framer working on it. | |||
| ELECTRIC-TUG | 07/25/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION SPOKE TO SUSAN FPL RELEASED TUG POWER 3:10 | |||
| ELECTRIC-TUG | 07/24/2017 | Disapproved - NO FEE | RMARTIN |
| Note: NEED APPROVED PLANS ON SITE FOR INSPECTION, ELECTRIC RISER DIAGRAM | |||
| FOUND SURVEY APPROVED (OFFICE) | 07/21/2017 | APPROVED | FREODICA |
| TIE BEAM / LINTEL | 07/21/2017 | APPROVED | CMINI |
| MONOLITHIC SLAB | 07/07/2017 | APPROVED | LMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/27/2017 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED SLEEVES ON SANIYARY DRAINAGE AND WATER LINES IN FOOTER CIRCLED ON FOUNDATION PLAN | |||
| STEM WALL FOUNDATION | 06/13/2017 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| STEM WALL FOUNDATION | 06/09/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: not ready, stem wall not complete, also plans call for it to be poured together with slab | |||
| STEM WALL FOUNDATION | 05/24/2017 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| STEM WALL FOUNDATION | 05/23/2017 | CANCELLED BY APPLICANT | LMILLER |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 12/12/2017 | 12/13/2017 |
| Note: Released By: DREWIS final s | |||
| SW1 | COMPLETE | 07/19/2017 | 07/20/2017 |
| Note: Released By: FREODICA foundation | |||
| PLUM | COMPLETE | 06/14/2017 | 06/19/2017 |
| Note: Released By: FREODICA Revision: changed contractor from first quality plumbing to jeff knight plumbing.and riser diagram. | |||
| BLD | COMPLETE | 05/18/2017 | 05/19/2017 |
| Note: Revision: added stemwall to rear and sides. | |||
| ELEC | COMPLETE | 02/27/2017 | 02/27/2017 |
| PLENV | COMPLETE | 02/13/2017 | 02/14/2017 |
| Note: Informational On February 9, 2017, staff conducted a site inspection to verify the nature of the noted wildlife activity. As discussed with Jean Ball, the site visit did not serve as an official gopher tortoise survey. At this time, no additional documentation is required. Pursuant to Section 10.04.04, LDC, should listed species reside on, or otherwise be significantly dependent upon the subject property, all development activities that might negatively affect that individual or population shall cease. | |||
| ELEC | HOLD | 02/13/2017 | 02/13/2017 |
| Note: 1. The electric plan must be signed and sealed by the architect or be designed by the electrician with his signature and license number on it. 5th ed. FBC 107.1. J. Hindman 986-3784. | |||
| BLD | COMPLETE | 02/13/2017 | 02/13/2017 |
| PLUM | COMPLETE | 02/13/2017 | 02/13/2017 |
| MECH | COMPLETE | 02/13/2017 | 02/13/2017 |
| PLENV | HOLD | 01/26/2017 | 01/30/2017 |
| Note: On May 20, 2015, City staff was notified that a gopher tortoise burrow exists on or in the vicinity of the subject property. Please provide a gopher tortoise survey by a qualified environmental professional that a burrow does not exist on or within 25 feet of the proposed construction activities. Please note that an active list of professionals determined to have met QEP criteria is currently maintained by the City’s Environmental Planner and available upon request. Contact of Environmental Planner: Denise Bevan, dbevan@palmcoastgov.com 386-986-2458 | |||
| BLD | HOLD | 01/25/2017 | 01/30/2017 |
| Note: 1. Provide attic ventilation calculation the comply with 5th ed. FBC R 806. (At least 40 but not less than 50 percent ventilators are to be in the upper portion of the roof if 1/300 area calculation is used.) J. Hindman 986-3784. | |||
| ELEC | HOLD | 01/25/2017 | 01/30/2017 |
| Note: 1. Provide receptacle in bedroom 3 on the wall with the switches. 2011 NEC 210.52. J. Hindman 986-3784. | |||
| ENGIN1 | COMPLETE | 01/25/2017 | 02/03/2017 |
| MECH | HOLD | 01/25/2017 | 01/30/2017 |
| Note: Provide hvac plan with signature and license number of an hvac contractor per FBC 5th ed. 107.2.1. F.Reodica- 386-986-4734. | |||
| PLUM | HOLD | 01/25/2017 | 01/30/2017 |
| Note: Gas riser diagram shall be complete. This includes the gas tank information and its piping to all appliances, piping materials, sizes, delivery pressure approximate distance and shall have signature and license number of gas contractor per FBC 5th ed. 107.2.1./FBCFG 5th ed. 402. F.Reodica - 386-986-4734. | |||
| SW1 | COMPLETE | 01/25/2017 | 01/30/2017 |
| UD1 | COMPLETE | 01/25/2017 | 01/31/2017 |
| Note: This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 01/25/2017 | 01/26/2017 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ENGINEERING ROAD DAMAGE | ¤212.00 | 12/20/2017 |
| REINSPECTION FEE | ¤40.00 | 12/20/2017 |
| REINSPECTION FEE | ¤40.00 | 12/20/2017 |
| REINSPECTION FEE | ¤40.00 | 12/20/2017 |
| REINSPECTION FEE | ¤40.00 | 12/20/2017 |
| REINSPECTION FEE | ¤40.00 | 12/20/2017 |
| REVISION | ¤40.00 | 12/20/2017 |
| REVISION | ¤40.00 | 12/20/2017 |
| SITE PLAN 20 | ¤20.00 | 03/01/2017 |
| SURCHARGE FS 533.721 | ¤26.74 | 03/01/2017 |
| SURCHARGE - FS 468.631 | ¤26.74 | 03/01/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/01/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 03/01/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤744.00 | 03/01/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.43) | 03/01/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤214.29 | 03/01/2017 |
| IMPACT FEE PARKS | ¤849.24 | 03/01/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/01/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 03/01/2017 |
| MECHANICAL FEE | ¤283.20 | 03/01/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/01/2017 |
| PLAN CHECK FEE | ¤148.80 | 03/01/2017 |
| PLUMBING FEE | ¤283.20 | 03/01/2017 |
| ADMIN FEE | ¤20.00 | 03/01/2017 |
| ELECTRIC FEE | ¤283.20 | 03/01/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤10,070.43 |