Permit #2017020101
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00050-0160 |
| CONDITIONED SPACE: 2456 sqft |
| GARAGE: 556 sqft |
| OPENED PORCH (WITH ROOF) : 368 sqft |
| OPENED PORCH (WITH ROOF) : 98 sqft |
| Total Square Footage: 3478 sqft |
| Block: 00050 |
| Subdivision: 2108 - Hidden Lakes- Phase II-Toscana |
| Job Phone: 863-420-2100 |
| Location Address: 59 NEW WATER OAK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/23/2017 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
531 CODISCO WAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2018) | (407)333-2665 | (407)585-1002 |
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
KYLE G ROE
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
2048 APEX COURT APOPKA, FL 32703 |
CFC1425725 (Exp: 08/31/2024) | 407-898-2023 | 407-648-5654 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/12/2017 | FINAL APPROVED | CMINI |
| ROW - FINAL INSPECTION | 10/12/2017 | APPROVED - AS NOTED | RGROSS |
| Note: THIS IS A REINSPECTION. CONTRACTOR HAS SOD ON ORDER TO SOD ACROSS THE STREET. CONTACTOR TO NOTIFY INSPECTOR WHEN COMPLETE. | |||
| ROW - FINAL INSPECTION | 10/11/2017 | Disapproved -FEE REQUIRED | RGROSS |
| Note: REMOVE ROAD BASE PILE ACROSS THE STREET AND SOD ALL BARE EARTH AREAS. | |||
| ROW - FINAL APRON (AFTER POUR) | 10/10/2017 | APPROVED | RGROSS |
| U-CROSS CONNECTION | 10/10/2017 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION-reclaim meter now installed | |||
| U -UTILITY RESIDENTIAL FINAL | 10/10/2017 | FINAL APPROVED | LFITZGERALD |
| FINAL SURVEY (OFFICE USE ONLY) | 10/09/2017 | APPROVED | DREWIS |
| Note: THIS IS A REINSPECTION | |||
| FINAL APRON (AFTER POUR/DRIVEWAY) | 10/02/2017 | APPROVED | RGROSS |
| ROW - FINAL APRON (AFTER POUR) | 10/02/2017 | CANCELLED BY APPLICANT | AIRS WEB |
| U -UTILITY RESIDENTIAL FINAL | 10/02/2017 | CANCELLED BY APPLICANT | AIRS WEB |
| FINAL SURVEY (OFFICE USE ONLY) | 09/29/2017 | Disapproved - NO FEE | DREWIS |
| U-CROSS CONNECTION | 09/27/2017 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: reuse meter not installed,utility dept. contacted by builder | |||
| PRE-APRON (PRE-POUR/DRIVEWAY) | 09/22/2017 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 09/21/2017 | APPROVED | JHINDMAN |
| ROW- PRE-APRON (PRE-POUR) | 09/20/2017 | PARTIALLY APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. APPROVED FOR SIDEWALK AND APRON POUR ONLY. PAVER DRIVEWAY. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/19/2017 | Disapproved -FEE REQUIRED | RGROSS |
| Note: SIDEWALK NOT COMPLETELY FORMED. NO MATERIAL REMOVED FROM DRIVEWAY AREA. COULD NOT EVEN GIVE PARTIAL PASS. | |||
| INSULATION | 07/26/2017 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 07/25/2017 | APPROVED | CMINI |
| INSULATION | 07/24/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: missing insulation at exterior arch window, need fire rated foam at plumbing pipes, missing fire block at elec panel. insulation blown out in garage walls | |||
| ALL ROUGH | 07/20/2017 | APPROVED | CMINI |
| ROOF VALLEY & METAL | 07/18/2017 | APPROVED | DROCKWELL |
| ELECTRIC-TUG | 07/18/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TUG POWER 3:50 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/14/2017 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION. need to expose hear over window at front entrance | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/12/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION. not completed per plan | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/06/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: need to expose areas of framing, headers etc. circled on roof plan, missing or can not see, check all | |||
| TIE BEAM / LINTEL | 05/12/2017 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 04/27/2017 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 04/25/2017 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING PRESSURE TEST | 04/20/2017 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS A REINSPECTION ON SANITARY WASTE DUE TO A BUSTED LINE FROM CONCRETE CONTRACTOR | |||
| MONOLITHIC SLAB | 04/19/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: plumbing needs to be retested because of damage, need to recall plumbing and slab. need to show compaction report. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 04/11/2017 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 04/11/2017 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 04/11/2017 | APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| U - SEWER TIE IN | 04/04/2017 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: tie in to mainline is ok BUT a 45 wye can not be utilized as a 45 degree bend, all wye cleanouts must be behind all 45 degree bends as stated in Palm Coast Utility Standards. | |||
| FOOTER | 03/08/2017 | APPROVED | LMILLER |
Review History
| Department | Status | Date In | Date Out |
| PLUM | COMPLETE | 10/10/2017 | 10/11/2017 |
| Note: Released By: FREODICA Revision error. | |||
| SW1 | COMPLETE | 10/05/2017 | 10/09/2017 |
| Note: Released By: DREWIS FINAL S | |||
| SW1 | HOLD | 10/03/2017 | 10/04/2017 |
| Note: Held By: DREWIS Please provide additional survey measurements at foundation wall and 10' away from wall to assure compliance with FBC R401.3 Please note, measurements must be taken at the foundation wall and corners around entire residence. 10' distance measurements away from foundation walls include driveways. D. Rewis 986-4736 | |||
| SW1 | HOLD | 09/28/2017 | 09/29/2017 |
| Note: Held By: DREWIS Please provide additional survey measurements at foundation wall and 10' away from wall to assure compliance with FBC R401.3 D. Rewis 986-4736 | |||
| PLUM | HOLD | 08/09/2017 | 08/18/2017 |
| Note: Held By: FREODICA Clarify what plumbing revision will be done as there was no plumbing plan submitted for review per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| BLD | COMPLETE | 06/06/2017 | 06/12/2017 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 04/26/2017 | 04/27/2017 |
| Note: Released By: JHINDMAN foundation s | |||
| BLD | COMPLETE | 04/18/2017 | 04/21/2017 |
| Note: Revision- added (1) window at kittchen. | |||
| PLUM | COMPLETE | 02/22/2017 | 02/23/2017 |
| ZON | COMPLETE | 02/15/2017 | 02/16/2017 |
| PLUM | HOLD | 02/15/2017 | 02/17/2017 |
| Note: Repeat comment: Sanitary riser diagram does not match with floor plan. Coordinate for clarity per FBC 5th ed. 107.2.1. F.Reodica - 386-986-4734. | |||
| PLENV | COMPLETE | 02/06/2017 | 02/08/2017 |
| Note: No comments. | |||
| BLD | COMPLETE | 02/03/2017 | 02/07/2017 |
| ELEC | COMPLETE | 02/03/2017 | 02/07/2017 |
| ENGIN1 | COMPLETE | 02/03/2017 | 02/06/2017 |
| MECH | COMPLETE | 02/03/2017 | 02/07/2017 |
| PLUM | HOLD | 02/03/2017 | 02/07/2017 |
| Note: Sanitary riser diagram does not match with floor plan. Coordinate for clarity per FBC 5th ed. 107.2.1. F.Reodica - 386-986-4734. | |||
| SW1 | COMPLETE | 02/03/2017 | 02/07/2017 |
| UD1 | COMPLETE | 02/03/2017 | 02/06/2017 |
| Note: This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 02/03/2017 | 02/06/2017 |
| Note: Must have banding on street side |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 10/11/2017 |
| REINSPECTION FEE | ¤40.00 | 10/09/2017 |
| REINSPECTION FEE | ¤40.00 | 09/05/2017 |
| REINSPECTION FEE | ¤40.00 | 09/05/2017 |
| REINSPECTION FEE | ¤40.00 | 09/05/2017 |
| REINSPECTION FEE | ¤40.00 | 09/05/2017 |
| REINSPECTION FEE | ¤40.00 | 09/05/2017 |
| REVISION | ¤40.00 | 09/05/2017 |
| REVISION | ¤40.00 | 09/05/2017 |
| SITE PLAN 20 | ¤20.00 | 02/23/2017 |
| SURCHARGE FS 533.721 | ¤23.08 | 02/23/2017 |
| SURCHARGE - FS 468.631 | ¤23.08 | 02/23/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/23/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 02/23/2017 |
| ADMIN FEE | ¤20.00 | 02/23/2017 |
| ELECTRIC FEE | ¤248.40 | 02/23/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.43) | 02/23/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤214.29 | 02/23/2017 |
| IMPACT FEE PARKS | ¤849.24 | 02/23/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/23/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 02/23/2017 |
| MECHANICAL FEE | ¤248.40 | 02/23/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 02/23/2017 |
| PLAN CHECK FEE | ¤125.60 | 02/23/2017 |
| PLUMBING FEE | ¤248.40 | 02/23/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤628.00 | 02/23/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,687.51 |