Permit #2017020447

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7037-00860-0020
Block: 00860
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 386-437-3122
Location Address: 7 LAKE SUCCESS DR
Type: DR - DRIVEWAY
Issue Date: 02/24/2017
NOC: RECORDED
Applicant name: TERRY MARTIN MCNITT JR
Owner: KNEPP, JAMES P & JOANNE C

Address

7 LAKE SUCCESS

PALM COAST, FL 32137

Lot: 0020
Contracted Stated Job Value: ¤7,000.00
Job Description: PAVER DRIVEWAY
Type: CN

Contractor

VERDEGO LLC
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 789

BUNNELL, FL 32110

CGC1506752 (Exp: 08/31/2026) 386-437-3122 386-437-6883

Inspection History

Type Request Date Result Inspector
FINAL - BUILDING MISC 08/22/2017 APPROVED RGROSS
Note: APPROVED
ROW FINAL 07/19/2017 APPROVED RGROSS
Note: APPROVED
ROW - FINAL INSPECTION 05/30/2017 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION. SEE NOTES ON LAST INSPECTION. ALL DRIVEWAY REPLACEMENT CONTRACTORS ARE REQUIRED TO REMOVE AND REPLACE 1 FT BY THE LENGTH OF THE DRIVEWAY. SEE PAINT MARKS.
U -UTILITY RESIDENTIAL FINAL 05/01/2017 FINAL APPROVED JNICHOLS
Note: no inspection card on site to sign.
ROW - FINAL APRON (AFTER POUR) 05/01/2017 APPROVED RGROSS
Note: APPROVED
ROW - FINAL INSPECTION 05/01/2017 Disapproved -FEE REQUIRED RGROSS
Note: REMOVE AND REPLACE 1 FT BY THE LENGTH OF THE DRIVEWAY WITH HOT PATCH ASPHALT. PHOTO'S ATTACHED.
ROW- PRE-APRON (PRE-POUR) 03/08/2017 APPROVED GLALIMA

Review History

Department Status Date In Date Out
ZON COMPLETE 02/22/2017 02/24/2017
ENGIN1 COMPLETE 02/10/2017 02/20/2017
SW1 COMPLETE 02/10/2017 02/10/2017
UD1 COMPLETE 02/10/2017 02/14/2017
Note: All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON HOLD 02/10/2017 02/13/2017
Note: Need a Right-Of-Way Utilization Agreement for the proposed paver driveway T Williams 386.986.2655

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/18/2017
REINSPECTION FEE ¤40.00 05/26/2017
ADMIN FEE ¤20.00 02/24/2017
RECORDING FEE REIMBURSE DOC ¤52.50 02/24/2017
SITE PLAN 20 ¤20.00 02/24/2017
SURCHARGE FS 533.721 ¤2.00 02/24/2017
SURCHARGE - FS 468.631 ¤2.00 02/24/2017
STORM WATER PERMIT FEES ¤40.00 02/24/2017
Fees Total Due: ¤0.00 Total Paid: ¤216.50