Permit #2017020966
Permit Details
Status: COED
| Parcel Id: 07-11-31-7034-01010-0110 |
| CONDITIONED SPACE: 2357 sqft |
| GARAGE: 610 sqft |
| OPENED PORCH (WITH ROOF) : 96 sqft |
| OPENED PORCH (WITH ROOF) : 455 sqft |
| Total Square Footage: 3518 sqft |
| Block: 01010 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: (386) 672-8285 |
| Location Address: 103 EVANS DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 03/07/2017 |
| NOC: RECORDED |
| Applicant name: JOSEPH TODD VANACORE |
| Owner: LANOUE, SANDRA |
|
Address 72 FLEMING CT PALM COAST, FL 32137 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤262,400.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
VANACORE CONSTRUCTION INC.
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1451 N US HIGHWAY 1 Ormond Beach, FL 32174 |
SUITE 13 Ormond Beach, FL 32174 |
CBC058991 (Exp: 08/31/2024) | (386) 672-8285 |
Sub Contractors
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
GARY WAYNE EVERS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 740106 ORANGE CITY, FL 32763 |
CFC050566 (Exp: 08/31/2026) | 386-775-0909 | 386-775-0918 |
ALFRED N FYOCK JR
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
387 SAULS ORMOND BEACH, FL 32174 |
ST ORMOND BEACH, FL 32174 |
CCC1329075 (Exp: 08/31/2026) | 386-566-6112 | 386-673-4299 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/28/2017 | FINAL APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 11/27/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: House numbers not displayed | |||
| ROW - FINAL APRON (AFTER POUR) | 11/22/2017 | APPROVED | RGROSS |
| ROW - FINAL INSPECTION | 11/22/2017 | APPROVED | RGROSS |
| U -UTILITY RESIDENTIAL FINAL | 11/22/2017 | FINAL APPROVED | MBACON |
| FINAL SURVEY (OFFICE USE ONLY) | 11/21/2017 | APPROVED | DREWIS |
| ROW- PRE-APRON (PRE-POUR) | 09/26/2017 | APPROVED | CTROHA |
| Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| ROW- PRE-APRON (PRE-POUR) | 09/25/2017 | Disapproved -FEE REQUIRED | CTROHA |
| Note: CULVERT UNDER WATER NO COMPACTION AROUND CULVERT REPAIR WASH OUT AREAS | |||
| ELECTRIC - EARLY POWER | 09/07/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION spoke to susan fpl released early power 11:20 | |||
| ELECTRIC - EARLY POWER | 09/05/2017 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: JACUZZI OUTLET NOT SAFED OFF, ALL CONDUCTORS NEED TO BE SAFED OFF FOR THIS INSPECTION | |||
| U - SEWER TIE IN | 08/16/2017 | APPROVED | MBACON |
| LATH/BRICK/ WATER BARRIER | 07/26/2017 | APPROVED | DROCKWELL |
| INSULATION | 07/05/2017 | APPROVED | DROCKWELL |
| ALL ROUGH | 06/29/2017 | APPROVED - AS NOTED | DROCKWELL |
| Note: Need access to GFI outlet master tub/Fix nail plate pool bath.Will check next inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/13/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 06/13/2017 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/06/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: 2 trusses over slider not strapped/Provide x brace detail for gables | |||
| TIE BEAM / LINTEL | 05/08/2017 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 05/02/2017 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 04/26/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 04/25/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Slab not proper thickness at shower recess.This has been an ongoing issue | |||
| GRAVITY SEWER TEST | 04/21/2017 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 04/21/2017 | CANCELLED BY APPLICANT | AIRS WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/20/2017 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 11/21/2017 | 11/21/2017 |
| Note: Released By: DREWIS final s | |||
| SW1 | COMPLETE | 05/02/2017 | 05/02/2017 |
| Note: Released By: JHINDMAN foundation s | |||
| PLUM | COMPLETE | 03/03/2017 | 03/03/2017 |
| PLUM | HOLD | 03/01/2017 | 03/01/2017 |
| Note: Resubmitted sanitary riser diagram does not match with floor plan. Coordinate per FBC 5th ed. 107.2.1. | |||
| BLD | COMPLETE | 02/22/2017 | 02/23/2017 |
| ELEC | COMPLETE | 02/22/2017 | 02/23/2017 |
| ENGIN1 | COMPLETE | 02/22/2017 | 02/24/2017 |
| MECH | COMPLETE | 02/22/2017 | 02/23/2017 |
| PLUM | HOLD | 02/22/2017 | 02/23/2017 |
| Note: Provide sanitary riser diagram with sufficient clarity for review, construction and inspection per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| SW1 | COMPLETE | 02/22/2017 | 02/23/2017 |
| UD1 | COMPLETE | 02/22/2017 | 02/23/2017 |
| Note: located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves | |||
| ZON | COMPLETE | 02/22/2017 | 02/23/2017 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 11/29/2017 |
| REINSPECTION FEE | ¤40.00 | 11/29/2017 |
| REINSPECTION FEE | ¤40.00 | 11/29/2017 |
| REINSPECTION FEE | ¤40.00 | 11/29/2017 |
| REINSPECTION FEE | ¤40.00 | 11/29/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤618.00 | 03/07/2017 |
| SITE PLAN 20 | ¤20.00 | 03/07/2017 |
| SURCHARGE FS 533.721 | ¤22.77 | 03/07/2017 |
| SURCHARGE - FS 468.631 | ¤22.77 | 03/07/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/07/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 03/07/2017 |
| ADMIN FEE | ¤20.00 | 03/07/2017 |
| ELECTRIC FEE | ¤245.40 | 03/07/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.43) | 03/07/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤214.29 | 03/07/2017 |
| IMPACT FEE PARKS | ¤849.24 | 03/07/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/07/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 03/07/2017 |
| MECHANICAL FEE | ¤245.40 | 03/07/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 03/07/2017 |
| PLAN CHECK FEE | ¤123.60 | 03/07/2017 |
| PLUMBING FEE | ¤245.40 | 03/07/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,505.89 |