Permit #2017030187
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7034-01000-0010 |
| CONDITIONED SPACE: 479 sqft |
| Total Square Footage: 479 sqft |
| Block: 01000 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-585-0958 |
| Location Address: 10 EVANS PARK PL |
| Type: BA - BUILDING ADDITION |
| Issue Date: 03/27/2017 |
| NOC: RECORDED |
| Applicant name: JEFFREY G SPRAGUE |
| Owner: HENRIQUES, DONALD & ANNA ANDREWS |
|
Address 10 EVANS PARK PLACE PALM COAST, FL 32164 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤49,651.00 |
| Job Description: ADDITION |
| Type: CN |
Contractor
JGS DESIGN ASSOCIATES, LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
8 INDIAN MOUND CT FLAGLER BEACH, FL 32136 |
CBC1260630 (Exp: 08/31/2026) | 386-585-0958 |
Sub Contractors
JOHN FREDERICK WANERKA JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
P.O. BOX 350214 BUNNELL, FL 32110 |
EC13003318 (Exp: 08/31/2022) | (386)446-9626 | (386)445-3131 |
DAVID L MILLER
| Status | Location Address | State License Number | Phone |
| CANCEL |
170 OLD MOODY BLVD BUNNELL, FL 32110 |
CFC1425948 (Exp: 08/31/2022) | (386) 439-2169 |
BARRY D MARTIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1650 N STATE STREET Bunnell, FL 32110 |
CCC033728 (Exp: 08/31/2020) | (386) 437-7700 | (386)437-7701 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/27/2017 | FINAL APPROVED | DROCKWELL |
| Note: per contractor | |||
| U -UTILITY RESIDENTIAL FINAL | 09/25/2017 | FINAL APPROVED | MBACON |
| FINAL SURVEY (OFFICE USE ONLY) | 09/20/2017 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/23/2017 | Disapproved - NO FEE | WMILLER |
| Note: Submit proper final survey. Foundation surveys do not qualify as, and are not accepted as final surveys. | |||
| INSULATION | 07/26/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 07/25/2017 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: 1. provide r38 minimum per plans. 2. seal all firestops 5th ed. fbcr302.1 | |||
| ALL ROUGH | 07/24/2017 | APPROVED | JHINDMAN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/17/2017 | APPROVED | DROCKWELL |
| Note: PER CONTRACTOR | |||
| TIE BEAM / LINTEL | 07/07/2017 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 07/06/2017 | APPROVED | JHINDMAN |
| LATH/BRICK/ WATER BARRIER | 07/05/2017 | CANCELLED BY APPLICANT | DROCKWELL |
| Note: Wrong inspection called in.Call in lintel inspection for tomorrow.Inspection was completed and is ok. do not pour until it is resulted in computer | |||
| MONOLITHIC SLAB | 06/21/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 04/07/2017 | Disapproved - NO FEE | DROCKWELL |
| Note: Do not pour slab.building official has concerns with the grade. See Mr. Rick Lee with a plan to solve grading issues. | |||
| ELECTRIC 2ND ROUGH | 04/06/2017 | APPROVED | DROCKWELL |
| MONOLITHIC SLAB | 04/06/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Rain damaged footer.Clean out to meet minimum clearance requirements |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 09/18/2017 | 09/20/2017 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 09/05/2017 | 09/05/2017 |
| Note: Held By: WMILLER Third Request to: Submit proper Final Survey. Should by listed: As Built or Final Survey Final location Surveys do not qualify as, and are not accepted as final survey! Documents submitted show proposed elevations. Please submit Final survey / as built with exact hieghts at building corners, drainage swale, and at all proposed elevation locations requried by engineer to prove compliance of engineered drainage plan. | |||
| SW1 | HOLD | 08/29/2017 | 08/29/2017 |
| Note: Held By: WMILLER Second Request to: Submit proper Final Survey. Should by listed: as built or final Final location Surveys do not qualify as, and are not accepted as final survey! Documents submitted show proposed elevations. Please submit Final survey / as built with exact hieghts at building corners, drainage swale, and at all proposed elevation locations requried by engineer to prove compliance of engineered drainage plan. | |||
| SW1 | HOLD | 08/28/2017 | 08/29/2017 |
| Note: Held By: WMILLER Second Request to s | |||
| SW1 | HOLD | 08/22/2017 | 08/23/2017 |
| Note: Held By: WMILLER final s Submit proper Final Survey. Foundation Surveys do not qualify as, and are not accepted as final survey! | |||
| SW1 | COMPLETE | 06/30/2017 | 07/06/2017 |
| Note: Released By: JHINDMAN foundation | |||
| SW1 | COMPLETE | 06/09/2017 | 06/13/2017 |
| Note: Released By: JHINDMAN | |||
| MECH | COMPLETE | 03/23/2017 | 03/24/2017 |
| SW1 | COMPLETE | 03/17/2017 | 03/20/2017 |
| ZON | COMPLETE | 03/17/2017 | 03/17/2017 |
| MECH | HOLD | 03/17/2017 | 03/21/2017 |
| Note: 1. Energy performace level (EPL) display card shall be signed by the builder per FBCEC 5th ed. R401.3. 2. Hvac plan shall have signature and license number of hvac contractor per FBC 5th ed. 105.3.1.2. F.Reodica - 386-986-4734. | |||
| BLD | COMPLETE | 03/17/2017 | 03/20/2017 |
| MECH | HOLD | 03/08/2017 | 03/08/2017 |
| Note: Provide eneregy calculations and hvac plan either prepared by design professional or hvac contractor with signature and license number per FBC 5th ed. 105.3.1.2. F.Reodica -386-986-4734. | |||
| BLD | COMPLETE | 03/07/2017 | 03/08/2017 |
| SW1 | HOLD | 03/07/2017 | 03/07/2017 |
| Note: 1. Provide a proposed lot drainage plan that includes the addition. per uldc Tech manual ch5 300. J. Hindman 986-3784. | |||
| ZON | HOLD | 03/07/2017 | 03/08/2017 |
| Note: Must show dimensions and setbacks for proposed addition on the 8 1/2 x 11 Site plan | |||
| ELEC | COMPLETE | 03/07/2017 | 03/09/2017 |
| PLUM | COMPLETE | 03/07/2017 | 03/08/2017 |
| Note: Not applicable |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/22/2017 |
| REINSPECTION FEE | ¤40.00 | 09/22/2017 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 03/27/2017 |
| SITE PLAN 20 | ¤20.00 | 03/27/2017 |
| SURCHARGE FS 533.721 | ¤5.93 | 03/27/2017 |
| SURCHARGE - FS 468.631 | ¤5.93 | 03/27/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 03/27/2017 |
| ADMIN FEE | ¤20.00 | 03/27/2017 |
| ELECTRIC FEE | ¤91.80 | 03/27/2017 |
| MECHANICAL FEE | ¤91.80 | 03/27/2017 |
| PLAN CHECK FEE | ¤40.00 | 03/27/2017 |
| PLUMBING FEE | ¤91.80 | 03/27/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤567.26 |