I want to search for...

Permit #2017031026

Permit Details

Status: COED

Parcel Id: 22-11-31-5903-00000-0100
CONDITIONED SPACE: 2610 sqft
GARAGE: 481 sqft
OPENED PORCH (WITH ROOF) : 300 sqft
OPENED PORCH (WITH ROOF) : 32 sqft
Total Square Footage: 3423 sqft
Block: 00000
Subdivision: 1208 - VILLAGE I-1 AT GRAND HAVEN
Job Phone: 386-236-4133
Location Address: 9 SAND PINE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/06/2017
NOC: RECORDED
Applicant name: LEONARDO CIRO SANCLEMENTE
Owner: INTERVEST CONSTRUCTION INC

Address

2379 BEVILLE RD

DAYTONA BEACH, FL 32119

Lot: 0100
Contracted Stated Job Value: ¤322,052.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INTERVEST CONSTRUCTION, INC.
Status Location Address State License Number Phone
CANCEL

2379 BEVILLE RD

DAYTONA BEACH, FL 32119

CBC1261237 (Exp: 08/31/2020) 386-236-4133

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
CHARLES H KULP
Status Location Address State License Number Phone Fax
CANCEL

5401 ENERGY AIR CT

ORLANDO, FL 32810

CAC018270 (Exp: 08/31/2022) 407-886-3729 407-886-7580
BARRY D MARTIN
Status Location Address State License Number Phone Fax
CANCEL

1650 N STATE STREET

Bunnell, FL 32110

CCC033728 (Exp: 08/31/2020) (386) 437-7700 (386)437-7701
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/31/2017 FINAL APPROVED CMINI
U -UTILITY RESIDENTIAL FINAL 10/30/2017 FINAL APPROVED LFITZGERALD
ROW - FINAL INSPECTION 10/27/2017 APPROVED RGROSS
ROW - FINAL APRON (AFTER POUR) 10/27/2017 APPROVED RGROSS
Note: THIS IS A REINSPECTION.NOTE THAT 2ND PART OF THE PRE POUR WAS INSPECTED BY ROBERT.
FINAL SURVEY (OFFICE USE ONLY) 10/26/2017 Disapproved - NO FEE DREWIS
Note: THIS IS A REINSPECTION Measurements on left side back corner and right side front corner do not meet FBC R401.3 requirement. Also measurements for flow of 15.37 & 15.31 on left side back corner and measurements for flow on right side do not meet postitive flow requirement of 1/10 decline every 20', Tech. Manual Sec. 5 Eng. Standard 300.01D D. Rewis 986-4736
FINAL SURVEY (OFFICE USE ONLY) 10/26/2017 APPROVED DREWIS
Note: THIS IS A REINSPECTION
ROW - FINAL APRON (AFTER POUR) 10/24/2017 Disapproved -FEE REQUIRED RGROSS
Note: THIS IS A REINSPECTION. EDGE RESTRAINT NEEDED IN THE ROW. PAVERS COLLAPSING ON THE LEFT SIDE. REPAIR COLLAPSED PAVERS AND ADD A RESTRAINT.
FINAL SURVEY (OFFICE USE ONLY) 10/20/2017 Disapproved - NO FEE DREWIS
Note: Please provide surevey measurements grade at the foundation and 10' away from foundation wall per Florida Building Code R 401.3. Also, the stormwater flow being depicted on the south side is too flat in one portion and does not match proposed site plan flow. D. Rewis 986-4736
ROW - FINAL APRON (AFTER POUR) 09/19/2017 Disapproved - NO FEE RGROSS
Note: NOT READY FOR A FINAL APRON.
ELECTRIC - EARLY POWER 09/15/2017 APPROVED - AS NOTED WMILLER
Note: FPL OFFICE IS CLOSED DUE TO STORM REPAIRS AND RESTORATION, LEFT MESSAGE WITH THEM TO RELEASE POWER FOR EARLY POWER
ALL ROUGH 09/01/2017 CANCELLED BY APPLICANT AIRS WEB
ROW- PRE-APRON (PRE-POUR) 08/24/2017 PARTIALLY APPROVED CTROHA
Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. SUB APRON ONLY
LATH/BRICK/ WATER BARRIER 08/03/2017 APPROVED DROCKWELL
INSULATION 07/28/2017 APPROVED CMINI
Note: THIS IS A REINSPECTION
INSULATION 07/27/2017 Disapproved -FEE REQUIRED DROCKWELL
Note: Insulation not completed-work on going
ALL ROUGH 07/21/2017 APPROVED CMINI
Note: THIS IS A REINSPECTION
ALL ROUGH 07/20/2017 CANCELLED BY APPLICANT JHINDMAN
WALL SHEATHING 07/07/2017 APPROVED LMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/29/2017 APPROVED CMINI
ROOF VALLEY & METAL 06/29/2017 APPROVED CMINI
ELECTRIC-TUG 05/19/2017 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL TUG POWER 3:40
TIE BEAM / LINTEL 05/18/2017 APPROVED CMINI
FOUND SURVEY APPROVED (OFFICE) 05/17/2017 APPROVED JHINDMAN
U - SEWER TIE IN 05/17/2017 APPROVED LFITZGERALD
GRAVITY SEWER TEST 05/04/2017 APPROVED JGIBSON
MONOLITHIC SLAB 05/04/2017 APPROVED LMILLER
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 05/03/2017 Disapproved -FEE REQUIRED LMILLER
Note: CLEARANCE ON REBAR FROM EARTH 3 1D FBC R404.1.2.3.7.4
PLUMBING 1ST ROUGH UNDERGROUND 04/27/2017 APPROVED - AS NOTED JGIBSON

Review History

Department Status Date In Date Out
SW1 COMPLETE 10/26/2017 10/26/2017
Note: Released By: DREWIS
SW1 HOLD 10/24/2017 10/25/2017
Note: Held By: DREWIS Measurements on left side back corner and right side front corner do not meet FBC R401.3 requirement. Also measurements for flow of 15.37 & 15.31 on left side back corner and measurements for flow on right side do not meet postitive flow requirement of 1/10 decline every 20', Tech. Manual Sec. 5 Eng. Standard 300.01D D. Rewis 986-4736
SW1 HOLD 10/18/2017 10/19/2017
Note: Held By: DREWIS final s Please provide surevey measurements grade at the foundation and 10' away from foundation wall per Florida Building Code R 401.3. Also, the stormwater flow being depicted on the south side is too flat in one portion and does not match proposed site plan flow. D. Rewis 986-4736
SW1 COMPLETE 05/16/2017 05/17/2017
Note: Released By: JHINDMAN FOUNDATION S
BLD COMPLETE 04/12/2017 04/13/2017
ZON COMPLETE 04/03/2017 04/03/2017
PLUM COMPLETE 04/03/2017 04/03/2017
BLD COMPLETE 03/24/2017 03/27/2017
ELEC COMPLETE 03/24/2017 03/24/2017
ENGIN1 COMPLETE 03/24/2017 03/24/2017
MECH COMPLETE 03/24/2017 03/27/2017
PLUM HOLD 03/24/2017 03/27/2017
Note: Sanitary riser diagram does not match with floor plan. Coordinate per FBC 5th ed. 107.2.1. F.Reodica - 386-986-4734.
SW1 COMPLETE 03/24/2017 03/24/2017
UD1 COMPLETE 03/24/2017 03/27/2017
ZON HOLD 03/24/2017 03/27/2017
Note: Banding required on highly visible walls

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 10/31/2017
REINSPECTION FEE ¤40.00 10/31/2017
REINSPECTION FEE ¤40.00 10/18/2017
REINSPECTION FEE ¤40.00 10/18/2017
REVISION ¤40.00 10/18/2017
SITE PLAN 20 ¤20.00 04/06/2017
SURCHARGE FS 533.721 ¤23.65 04/06/2017
SURCHARGE - FS 468.631 ¤23.65 04/06/2017
STORM WATER PERMIT FEES ¤80.00 04/06/2017
3% TRANS IMPACT FEE CREDIT (¤93.74) 04/06/2017
NEW RESIDENTIAL INSPECTIONS ¤646.00 04/06/2017
ADMIN FEE ¤20.00 04/06/2017
ELECTRIC FEE ¤253.80 04/06/2017
3% FIRE IMPACT FEE CREDIT (¤6.43) 04/06/2017
IMPACT FEE FIRE NONRESIDENTIAL ¤214.29 04/06/2017
IMPACT FEE PARKS ¤849.24 04/06/2017
IMPACT FEE SCHOOL ¤3,600.00 04/06/2017
IMPACT FEE TRANSPORTATION ¤3,124.67 04/06/2017
MECHANICAL FEE ¤253.80 04/06/2017
3% PARKS IMPACT FEE CREDIT (¤25.48) 04/06/2017
PLAN CHECK FEE ¤129.20 04/06/2017
PLUMBING FEE ¤253.80 04/06/2017
Fees Total Due: ¤0.00 Total Paid: ¤9,566.45