Permit #2017031230

Permit Details

Status: COED

Parcel Id: 07-11-31-7001-000B0-0020
Total Square Footage: 6572 sqft
Block: 000B0
Subdivision: 1238 - PALM HARBOR CENTER REPLAT
Job Phone: 954-825-8369
Location Address: 24 OLD KINGS RD N
Type: CIA - COMMERCIAL INTERIOR EXTERIOR ALTERATION
Issue Date: 12/18/2017
NOC: Unknown
Applicant name: THOMAS M SCAGLIONE
Owner: MANDEVILLE MANOR HEALTH SYSTEMS INC

Address

40 PONCE DELEON DRIVE

PALM COAST, FL 32164

Lot: 0020
Contracted Stated Job Value: ¤17,000.00
Job Description: UNIT A & B- "MANORVILLE MANOR HEALTH SYSTEM"ADULT DAYCARE
Type: CN

Contractor

T-CON GROUP, INC.
Status Location Address State License Number Phone
CANCEL

3246 NORTH POWERLINE ROAD

POMPANO BEACH, FL 33069

CBC1251999 (Exp: 08/31/2020) 954-825-8369

Sub Contractors

JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
JAMES KUYKENDALL
Status Location Address State License Number Phone Fax
CANCEL

2550 US 1 NORTH SUITE 3

BUNNELL, FL 32110

CAC1815546 (Exp: 08/31/2022) (386)437-2929 (386)437-2942
JAMES KUYKENDALL
Status Location Address State License Number Phone Fax
CANCEL

2550 US 1 NORTH SUITE 3

BUNNELL, FL 32110

CAC1815546 (Exp: 08/31/2022) (386)437-2929 (386)437-2942

Inspection History

Type Request Date Result Inspector
HVAC FINAL 01/15/2019 APPROVED JHINDMAN
ELECTRIC FINAL 01/15/2019 APPROVED RMARTIN
BUILDING FINAL 01/15/2019 APPROVED JHINDMAN
FIRE FINAL 01/15/2019 APPROVED JHINDMAN
U - UTILITY COMMERCIAL FINAL 01/15/2019 FINAL APPROVED JNICHOLS
HVAC ROUGH 12/11/2018 APPROVED JHINDMAN
ABOVE CEILING 12/11/2018 APPROVED JHINDMAN
PLUMBING FINAL 12/07/2018 APPROVED JGIBSON
Note: THIS IS A REINSPECTION GREASE INTERCEPTOR IN PLACE
PLUMBING FINAL 10/18/2018 Disapproved - NO FEE JGIBSON
Note: PER REVISION UNDER ADDED 3 COMPARTMENT SINK GREASE INTERCEPTOR NOT IN AND NEED HI-LOW DRINKING FOUTAIN
MONOLITHIC SLAB 08/23/2018 APPROVED JHINDMAN
Note: THIS IS A REINSPECTION
ELECTRIC 2ND ROUGH 08/07/2018 APPROVED RMARTIN
PLUMBING 2ND ROUGH 07/25/2018 APPROVED JGIBSON
PLUMBING 2ND ROUGH 07/24/2018 Disapproved -FEE REQUIRED JGIBSON
Note: DOOR LOCKED UNABLE TO GAIN ACCESS 10:47 AM
PLUMBING 2ND ROUGH 07/20/2018 Disapproved - NO FEE JGIBSON
Note: TEST NOT HOLDING ON SECOND ROUGH TEST BALL ON SEWER IN REAR
ELECTRIC 1ST ROUGH 07/20/2018 APPROVED - AS NOTED RMARTIN
Note: NO UNDERGROUND NEEDED, NEED TO CALL IN 2ND ROUGH WHEN APPROVED DRAWING IS ON SITE FOR WORK BEING DONE
FRAMING 06/21/2018 APPROVED JHINDMAN
MONOLITHIC SLAB 06/12/2018 Disapproved -FEE REQUIRED JHINDMAN
Note: no access building locked 6th ed. fbc 110.5
PLUMBING 1ST ROUGH 05/23/2018 APPROVED - AS NOTED JGIBSON
Note: NEED A REVISION TO SHOW CHANGE OF WATER PIPE used, cpvc speced ON PLANS UPANAR USED

Review History

Department Status Date In Date Out
FI1 COMPLETE 09/28/2018 09/28/2018
Note: Released By: LMUSGROVE j hindman
FI1 HOLD 09/20/2018 09/27/2018
Note: Held By: JHINDMAN
FI1 HOLD 09/12/2018 09/12/2018
Note: Held By: JHINDMAN 1. Provide a type 1 greese hood with a suppression system per nfpa96. J. hindman 986-3784.
BLD COMPLETE 08/29/2018 09/12/2018
Note: Released By: JHINDMAN
ELEC COMPLETE 07/31/2018 08/02/2018
Note: Released By: DREWIS
BLD COMPLETE 04/17/2018 04/18/2018
Note: Released By: JHINDMAN
PLUM COMPLETE 04/17/2018 04/20/2018
Note: Released By: FREODICA Revision: chnaged plumbing layout and riser due to relocation of bathroom.
MECH COMPLETE 04/17/2018 04/20/2018
Note: Released By: FREODICA Revision: changed hvac due to relocation of bathroom
BLD HOLD 02/26/2018 02/28/2018
Note: Held By: JHINDMAN 1. new restroom approach must have 12" minumum space on latch side for a push approach 6th ed. FBC A404.2. J. Hindman 986-3784.
MECH HOLD 02/26/2018 02/28/2018
Note: Held By: FREODICA Revision: Provide revised hvac plan signed and sealed by design professional per FBC 6th ed. 107.1. F.Reodica -386-986-4734.
PLUM HOLD 02/26/2018 02/28/2018
Note: Held By: FREODICA Revision: 1. Sanitary layout does not match with sanitary risser diagarm. Coordinate per FBC 6th ed. 107.2.1. 2. Identify all fixxture on sanitary layout and sanitary riser for clarity per FBC 6th ed. 107.2.1. 3. Provide venting system of plumbing fixtures to comply with FBCP 6th ed. 901.1. 4. Provide separate domestic water (hot and cold ) layout and riser per FBC 6th ed.107.3.5. F.Reodica -386-986-4734.
PLUM HOLD 02/16/2018 08/02/2017
Note: Repeat comments for items 2 and 3: 2. Due to increase of occupant load, the minimum required plumbing fixtures shall comply with FBCP 5th ed. 403. 3. Provide sanitary and domestic water (hot and cold) riser diagrams based on the increased occupant load as mentioned above (item2) either prepared by design professional or plumbing contractor per FBC 5th ed. 107.3.5. F.Reodica -386-986-4734. Notes: Comments based on correction submittal dated 5-7-17: Item 2 : Calculation for fixture requireremenrs shown on dwg A-3 shall be corrected. Additional (1) drinking fountain is required. Item 3 : Saitary riser diagram shall include (2) drinking fountains. Provide domestic water (hot and cold ) riser diagram.
BLD COMPLETE 12/11/2017 12/15/2017
ELEC COMPLETE 12/04/2017 12/06/2017
PLUM COMPLETE 12/04/2017 12/06/2017
Note: Released By: RLEE
MECH COMPLETE 12/04/2017 12/06/2017
Note: Released By: RLEE
BLD HOLD 12/04/2017 12/06/2017
Note: Held By: RLEE 5th Review, Still not met. 2. Provide door maneuvering clearances that meet the 5th ed. FBC Accessibility 404 for all doors including the restrooms. The door maneuvering clearances is mandatory Federal ADA code for all doors. The bathroom doors still does not meet the Federal ADA and Florida ADA requirements for door maneuvering clearances at door edge Please refer tro the FBC Accessiibility for clarification.,
PLUM HOLD 10/26/2017 11/01/2017
Note: 1. The new additional restrooms do not comply with the minimum number of required plumbing facilities for the total occupant load and occupancy classification per FBCP 5th ed. 403. 2. The door swing at the new unisex rest room shall not swing into the clear floor space or clearance required for any fixtures per FBC Accessibilty 5th ed. 603.2.3. 3. Revise the sanitary riser diagram to match with above comment 1 per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734.
MECH HOLD 10/26/2017 11/01/2017
Note: Provide proposed hvac plan including outdoor air calculation signed and sealed by engineer or by an hvac contractor with signature and license number per FBC 5th ed. 105.3.1.2 as previously requested. F.Reodica -386-986-4734.
ELEC HOLD 10/26/2017 10/30/2017
Note: Held By: DREWIS Please provide a floor plan showing the electrical work to be done. D. Rewis 986-4736
BLD HOLD 10/26/2017 11/07/2017
Note: 1. Provide complete dimensions for all restrooms including clear floor spaces. 2. Provide door maneuvering clearances that meet the 5th ed. FBC Accessibility 404 for all doors including the restrooms. 3. Provide a clear width of 36" in the new womens restroom in the walkway between the stall and the mens restroom wall 5th ed. FBC 1018.1. J. Hindman 986-3784.
ELEC HOLD 07/26/2017 08/01/2017
Note: 1. Provide a complete electrical plan with panel schedules 5th ed. FBC 107.3.5. J. Hindman 986-3784. 3rd request. The provided panel schedules do not show the proposed circuits for the project.
BLD HOLD 07/26/2017 08/01/2017
Note: 1. Demonstrate what the smoke partition is constructed of, how it is constructed, and how is the continuity of the smoke partition obtained. This is done by a detail demonstrating the separation of the corridor, and complying with the 5th edition Florida Building Code 710.4 J. Hindman 986-3784.
MECH HOLD 07/26/2017 08/02/2017
Note: Repeat comment: Coorection submittal: Existing hvac plan was submitted with a note referring to a mechanical contractor's responsibilty for the porposed design and installation of hvac system and energy calculations. Calculation of outdoor air requirement shall be included per FBCM 5th ed. 403. F.Reodica -386-986-4734. New comments based on submital dated 7-28-17: Please note that only existing hvac plan was submitted. Proposed hvac plan is required including the distributed CFM's, duct sizes, capacities of hvac units, outdoor air reqiremets and heating/cooling load calculations as previously requested.
PLUM HOLD 07/26/2017 08/02/2017
Note: Repeat comments for items 2 and 3: 2. Due to increase of occupant load, the minimum required plumbing fixtures shall comply with FBCP 5th ed. 403. 3. Provide sanitary and domestic water (hot and cold) riser diagrams based on the increased occupant load as mentioned above (item2) either prepared by design professional or plumbing contractor per FBC 5th ed. 107.3.5. F.Reodica -386-986-4734. Notes: Comments based on correction submittal dated 5-7-17: Item 2 : Calculation for fixture requireremenrs shown on dwg A-3 shall be corrected. Additional (1) drinking fountain is required. Item 3 : Saitary riser diagram shall include (2) drinking fountains. Provide domestic water (hot and cold ) riser diagram.
BLD HOLD 05/07/2017 05/08/2017
Note: 1. The rated corridor cannot end at the rear hall by the restroom.1018.6 Corridor continuity. Fire-resistance-rated corridors shall be continuous from the point of entry to an exit, and shall not be interrupted by intervening rooms. J. Hindman 986-3784.
ELEC HOLD 05/07/2017 05/08/2017
Note: 1. Provide a complete electrical plan with panel schedules 5th ed. FBC 107.3.5. J. Hindman 986-3784. 2nd request.
FI1 COMPLETE 05/07/2017 05/08/2017
PLUM HOLD 05/07/2017 05/09/2017
Note: Repeat comments for items 2 and 3: 2. Due to increase of occupant load, the minimum required plumbing fixtures shall comply with FBCP 5th ed. 403. 3. Provide sanitary and domestic water (hot and cold) riser diagrams based on the increased occupant load as mentioned above (item2) either prepared by design professional or plumbing contractor per FBC 5th ed. 107.3.5. F.Reodica -386-986-4734. Notes: Comments based on correction submittal dated 5-7-17: Item 2 : Calculation for fixture requireremenrs shown on dwg A-3 shall be corrected. Additional (1) drinking fountain is required. Item 3 : Saitary riser diagram shall include (2) drinking fountains. Provide domestic water (hot and cold ) riser diagram.
MECH HOLD 05/07/2017 05/08/2017
Note: Coorection submittal: Existing hvac plan was submitted with a note referring to a mechanical contractor's responsibilty for the porposed design and installation of hvac system and energy calculations. Calculation of outdoor air requirement shall be included per FBCM 5th ed. 403. F.Reodica -386-986-4734.
FI1 HOLD 04/03/2017 04/03/2017
Note: 1. Provide 1 hour rated corridors per 5th ed. Florida Fire Prevention code 101 16.3.6. J. Hindman 986-3784.
MECH HOLD 04/03/2017 04/03/2017
Note: 1. Provide exisiting and proposed hvac plan suitable for review, construction and inspection per FBC 5th ed. 107.2.1. 2. Proide heating and cooling load calculations due due change in occupancy classification and increase of occupant load per FBC existing building 5th ed. 809/FBCE 5th ed. C403.2.1. 3. Provide hvac contractor per FS 489.
PLUM HOLD 03/30/2017 04/03/2017
Note: 1. Provide existing and proposed plumbing plans suitable for review, construction and inspection per FBC 5th ed. 107.2.1 2. Due to increase of occupant load, the minimum required plumbing fixtures shall comply with FBCP 5th ed. 403. 3. Provide sanitary and domestic water (hot and cold) riser diagrams based on the increased occupant load as mentioned above (item2) either prepared by design professional or plumbing contractor per FBC 5th ed. 107.3.5. 4. Provide material specifications of DWV and domestic water (hot and cold) per FBCP 5th ed.605/702. F.Reodica -386-986-4734.
UD1 COMPLETE 03/30/2017 04/03/2017
ZON COMPLETE 03/30/2017 03/30/2017
BLD HOLD 03/30/2017 04/03/2017
Note: 1. Identify if side A and side B are to be two separate businesses. 2. Provide the correct occupancy I-4. (the group D occupancy no longer is in the current code. 5th ed. FBC 308.6. 3. Provide correct occupant loads for the business rooms 1/100. 5th ed. FBC 1004.1. 4. Provide an existing and new floorplans. 5th ed. FBC 107.2.1. J. Hindman 986-3784.
ELEC HOLD 03/30/2017 04/03/2017
Note: 1. Provide a complete electrical plan with panel schedules and load calculations 5th ed. FBC 107.3.5. J. Hindman 986-3784.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 01/11/2019
REINSPECTION FEE ¤40.00 01/11/2019
REVISION ¤40.00 01/11/2019
REVISION ¤40.00 04/20/2018
REVISION ¤40.00 04/20/2018
SITE PLAN 20 ¤20.00 12/18/2017
SURCHARGE FS 533.721 ¤4.81 12/18/2017
SURCHARGE - FS 468.631 ¤4.81 12/18/2017
ADMIN COMMERCIAL ¤60.00 12/18/2017
INSPECTION - COMMERCIAL ADD ¤119.00 12/18/2017
CONTRACTOR CHANGE ¤40.00 12/18/2017
CONTRACTOR CHANGE ¤40.00 12/18/2017
CONTRACTOR CHANGE ¤40.00 12/18/2017
ELECTRIC FEE ¤70.20 12/18/2017
PLAN CHECK FEE ¤100.00 12/18/2017
PLUMBING FEE ¤70.20 12/18/2017
Fees Total Due: ¤0.00 Total Paid: ¤769.02