I want to search for...

Permit #2017031324

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00050-0250
CONDITIONED SPACE: 548 sqft
CONDITIONED SPACE: 3168 sqft
GARAGE: 693 sqft
OPENED PORCH (WITH ROOF) : 301 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
Total Square Footage: 4820 sqft
Block: 00050
Subdivision: 2108 - Hidden Lakes- Phase II-Toscana
Job Phone: 863-420-2100
Location Address: 15 NEW OAK LEAF DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 05/01/2017
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0250
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone Fax
CANCEL

531 CODISCO WAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2018) (407)333-2665 (407)585-1002
TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 04/03/2018 FINAL APPROVED KHOWELL
Note: THIS IS A REINSPECTION
ROW - FINAL INSPECTION 04/02/2018 Disapproved -FEE REQUIRED KHOWELL
Note: REPAIR CURB AND GUTTER THAT IS MARKED AND REPAIR RUTTS THAT WAS DISCUSSED
ROW - FINAL APRON (AFTER POUR) 04/02/2018 APPROVED KHOWELL
BLD - BUILDING FINAL 04/02/2018 FINAL APPROVED CMINI
FINAL SURVEY (OFFICE USE ONLY) 03/29/2018 APPROVED DREWIS
ROW - FINAL APRON (AFTER POUR) 03/29/2018 CANCELLED BY APPLICANT KHOWELL
ROW - FINAL INSPECTION 03/29/2018 CANCELLED BY APPLICANT KHOWELL
ROW - FINAL INSPECTION 03/26/2018 CANCELLED BY APPLICANT RGROSS
Note: PROBLEMS CLEARING THE FINAL SURVEY
ROW - FINAL APRON (AFTER POUR) 03/26/2018 CANCELLED BY APPLICANT RGROSS
U-CROSS CONNECTION 03/22/2018 APPROVED LFITZGERALD
TUB SET 03/22/2018 APPROVED - AS NOTED JGIBSON
Note: per contractor CHECK FOR ACCESS AT FINAL FOR PUMP
U -UTILITY RESIDENTIAL FINAL 03/22/2018 FINAL APPROVED LFITZGERALD
ELECTRIC - EARLY POWER 03/12/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED EARLY POWER 3:50
ROW- PRE-APRON (PRE-POUR) 03/01/2018 APPROVED - AS NOTED KHOWELL
Note: THIS IS A REINSPECTION CONTRACTOR RESPONSIBLE FOR REPAIRING R.O.W. ACROSS THE ROAD WHERE PAVER BASE WAS DUMPED
ROW- PRE-APRON (PRE-POUR) 02/26/2018 PARTIALLY APPROVED KHOWELL
Note: SIDEWALK AND APRON ONLY, CONTRACTOR TO VERIFY SIDEWALK CROSS SLOPE DOES NOT EXCEED 2% PRIOR TO POURING
GRAVITY SEWER TEST 02/16/2018 APPROVED JGIBSON
U - SEWER TIE IN 02/16/2018 APPROVED JNICHOLS
ELECTRIC-TUG 02/15/2018 APPROVED - AS NOTED CMINI
Note: called Susan to release power
LATH/BRICK/ WATER BARRIER 01/23/2018 APPROVED CMINI
Note: THIS IS A REINSPECTION
LATH/BRICK/ WATER BARRIER 01/16/2018 CANCELLED BY APPLICANT DROCKWELL
Note: THIS IS A REINSPECTION
INSULATION 01/08/2018 APPROVED CMINI
Note: THIS IS A REINSPECTION
INSULATION 01/04/2018 Disapproved -FEE REQUIRED CMINI
Note: . arch framing over windows not insulated, top plate penetrations not fire sealed under stairs and 2nd fl. floor needs to be sealed from any holes,(under tub) ect. elec. panel not sealed. FBC 302
LATH/BRICK/ WATER BARRIER 12/27/2017 Disapproved -FEE REQUIRED WMILLER
Note: EXPOSED WOOD AT WINDOW OVER GARAGE ROOF
ROOF VALLEY & METAL 12/13/2017 APPROVED CMINI
Note: THIS IS A REINSPECTION
ALL ROUGH 12/13/2017 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION.need to bond gas line back to service. need to strap wires within 12" of panel enclosure. missing 120 outlet at wall oven. missing outlet on 2' wall space in kitchen knook per NEC
ALL ROUGH 12/11/2017 Disapproved - NO FEE CMINI
Note: no plans on site
ROOF VALLEY & METAL 12/11/2017 Disapproved -FEE REQUIRED CMINI
Note: coopala not flashed
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/07/2017 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION.. need to add sp1s and 2s at knee wall to each stud per plan
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/05/2017 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION.. still missing blocking between trusses, missing engineering pack for inspection, need repair revision on cut trusses, missing correct tie downs and straps at front entry for continuous load path header, knee walls. ect.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/22/2017 Disapproved -FEE REQUIRED DROCKWELL
Note: THIS IS A REINSPECTION/Strap trusses at mid-point bearing walls where straps can be seen/Provide solid blocking top and bottom at exterior wall locations to meet nailing requirements for exterior sheathing (between trusses)
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/13/2017 CANCELLED BY APPLICANT AIRS WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/13/2017 Disapproved -FEE REQUIRED CMINI
Note: need approved plans on site for inspection
TIE BEAM / LINTEL 09/01/2017 APPROVED CMINI
Note: THIS IS A REINSPECTION
TIE BEAM / LINTEL 08/31/2017 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION. still missing one vent that is not extended thru, please check all.FBC chapter 31
TIE BEAM / LINTEL 08/30/2017 Disapproved -FEE REQUIRED CMINI
Note: plumbing vent pipes not exiting out of lintel. need to extend. FBC chapter 31
MONOLITHIC SLAB 08/07/2017 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 08/01/2017 APPROVED - AS NOTED JGIBSON
Note: NEED TO LIST CORRECT SUB-CONTRACTOR FOR PLUMBING, BEFORE NEXT INSPECTION AND ANY OTHER STARTS COMING UP BEFORE CALLING FOR INSPECTION
FOUND SURVEY APPROVED (OFFICE) 07/31/2017 APPROVED JHINDMAN
ELECTRIC TEMP POLE 06/28/2017 APPROVED - AS NOTED RMARTIN
Note: THIS IS A REINSPECTION SPOKE TO DELL FPL RELEASED EARLY POWER 3:00
ELECTRIC TEMP POLE 06/21/2017 Disapproved -FEE REQUIRED DROCKWELL
Note: Close opening in panel
FOOTER 06/20/2017 APPROVED CMINI
Note: THIS IS A REINSPECTION
FOOTER 06/08/2017 CANCELLED BY APPLICANT CMINI

Review History

Department Status Date In Date Out
SW1 COMPLETE 03/29/2018 04/02/2018
Note: Released By: DREWIS
SW1 HOLD 03/21/2018 03/22/2018
Note: Held By: DREWIS Back left side survey measurements do not provide flow. Please provide positive flow per requirements of Tech. Manual Sec. 5 Eng. Standard 300.01D. Daniel Rewis 986-4736
SW1 HOLD 03/13/2018 03/14/2018
Note: Held By: DREWIS final Front left side low area of 22.04' Positive flow of 1/10th decline for every 20' must be provided for for left side drainage and rear area drainage of lot, Tech. Manual Sec. 5 Eng. Standard 300.01D. Daniel Rewis 986-4736
SW1 COMPLETE 07/28/2017 07/31/2017
Note: Released By: JHINDMAN foundation s
BLD COMPLETE 06/06/2017 06/12/2017
Note: Released By: JHINDMAN
BLD COMPLETE 04/27/2017 05/01/2017
URB COMPLETE 04/18/2017 04/18/2017
PLUM COMPLETE 04/18/2017 04/21/2017
BLD HOLD 04/18/2017 04/21/2017
Note: 1. Previous items 2 and 3 have not been addressed. (2. Provide specific Florida product approval of single hung windows as the submitted number FL-17676-R2 can not be found on code version 2014. The latest revision for that number Is FL-17676 R4 which consists of several models and design pressures to meet the submitted plans per FBC 5th ed. 107.2.1. 3. Provide Florida product approval of roofing material. The submitted number FL 14317 R2 indicates roofing underlayment per code version 2014.). J. Hindman 986-3784.
URB HOLD 04/03/2017 04/05/2017
Note: per the approved street tree plan: Need to move the right front oak left front and add 2 Drake Elm trees right front and left front minimum of 50ft on center and Max. 12.6 from the ROW. min. 5ft from sidewalks . Need to wrap foundation shrubbery right rear.
BLD HOLD 03/31/2017 03/31/2017
Note: 1. Provide Florida product approval of garage doors per FS 553.842. 2. Provide specific Florida product approval of single hung windows as the submitted number FL-17676-R2 can not be found on code version 2014. The latest revision for that number Is FL-17676 R4 which consists of several models and design pressures to meet the submitted plans per FBC 5th ed. 107.2.1. 3. Provide Florida product approval of roofing material. The submitted number FL 14317 R2 indicates roofing underlayment per code version 2014. F.Reodica - 386-986-4734.
ELEC COMPLETE 03/31/2017 04/03/2017
ENGIN1 COMPLETE 03/31/2017 03/31/2017
MECH COMPLETE 03/31/2017 03/31/2017
PLUM HOLD 03/31/2017 03/31/2017
Note: Provide sanitary riser diagram either prepared by design professional or a plumbing contractor with signature and license number per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734.
SW1 COMPLETE 03/31/2017 04/03/2017
UD1 COMPLETE 03/31/2017 04/03/2017
ZON COMPLETE 03/31/2017 04/03/2017

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 04/02/2018
REINSPECTION FEE ¤40.00 03/22/2018
REINSPECTION FEE ¤40.00 12/28/2017
REINSPECTION FEE ¤40.00 12/28/2017
REINSPECTION FEE ¤40.00 12/28/2017
REINSPECTION FEE ¤40.00 12/28/2017
REINSPECTION FEE ¤40.00 11/13/2017
REINSPECTION FEE ¤40.00 10/17/2017
REINSPECTION FEE ¤40.00 10/17/2017
REINSPECTION FEE ¤40.00 10/17/2017
ADDITIONAL FEE ¤40.00 10/17/2017
REVISION ¤40.00 10/17/2017
SITE PLAN 20 ¤20.00 05/01/2017
SURCHARGE FS 533.721 ¤32.09 05/01/2017
SURCHARGE - FS 468.631 ¤32.09 05/01/2017
STORM WATER PERMIT FEES ¤80.00 05/01/2017
3% TRANS IMPACT FEE CREDIT (¤93.74) 05/01/2017
NEW RESIDENTIAL INSPECTIONS ¤914.00 05/01/2017
ADMIN FEE ¤20.00 05/01/2017
ELECTRIC FEE ¤334.20 05/01/2017
3% FIRE IMPACT FEE CREDIT (¤6.43) 05/01/2017
IMPACT FEE FIRE NONRESIDENTIAL ¤214.29 05/01/2017
IMPACT FEE PARKS ¤849.24 05/01/2017
IMPACT FEE SCHOOL ¤3,600.00 05/01/2017
IMPACT FEE TRANSPORTATION ¤3,124.67 05/01/2017
MECHANICAL FEE ¤334.20 05/01/2017
3% PARKS IMPACT FEE CREDIT (¤25.48) 05/01/2017
PLAN CHECK FEE ¤182.80 05/01/2017
PLUMBING FEE ¤334.20 05/01/2017
Fees Total Due: ¤0.00 Total Paid: ¤10,426.13