Permit #2017041144
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00570-0100 |
| CONDITIONED SPACE: 1360 sqft |
| CONDITIONED SPACE: 1360 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| GARAGE: 469 sqft |
| GARAGE: 469 sqft |
| OPENED PORCH (WITH ROOF) : 131 sqft |
| OPENED PORCH (WITH ROOF) : 131 sqft |
| Total Square Footage: 4016 sqft |
| Block: 00570 |
| Subdivision: 2123 - SECTION 57-ULYSSES TREES |
| Job Phone: 386-931-2568 |
| Location Address: 5 UNION RUN CT |
| Type: DU - DUPLEX |
| Issue Date: 06/09/2017 |
| NOC: RECORDED |
| Applicant name: PETER JOSEPH LYDEN |
| Owner: MONKEVITCH, EUGENE & OLGA |
|
Address 46 NORTH PARK CIRCLE PALM COAST, FL 32137 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤100,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
DEL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1009 BUNNELL, FL 32110 |
CBC1253392 (Exp: 08/31/2024) | 386-931-2568 |
Sub Contractors
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1009 BUNNELL, FL 32110 |
CBC1253392 (Exp: 08/31/2024) | 386-931-2568 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/18/2018 | FINAL APPROVED | DROCKWELL |
| BLD - BUILDING FINAL | 09/14/2018 | Disapproved - NO FEE | DROCKWELL |
| Note: Receptical left side sink and under bar top not working | |||
| U -UTILITY RESIDENTIAL FINAL | 08/28/2018 | FINAL APPROVED | MBACON |
| ROW - FINAL APRON (AFTER POUR) | 08/17/2018 | APPROVED | CTROHA |
| Note: THIS IS A REINSPECTION MEETS THE MINIMUM REQUIREMENTS AT TIME OF THE INSPECTION | |||
| ROW - FINAL INSPECTION | 08/17/2018 | FINAL APPROVED | CTROHA |
| Note: MEETS THE MINIMUM REQUIREMENTS AT TIME OF THE INSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/16/2018 | APPROVED | DREWIS |
| ROW - FINAL APRON (AFTER POUR) | 08/09/2018 | Disapproved - NO FEE | CTROHA |
| Note: SEE PREVIOUS NOTES FOR THIS INSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 08/01/2018 | Disapproved -FEE REQUIRED | CTROHA |
| Note: APPROVED FINAL SURVEY IS REQUIRED TO BE ON SITE FOR THIS INSPECTION | |||
| ELECTRIC - EARLY POWER | 07/13/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 3:20 | |||
| ELECTRIC - EARLY POWER | 07/12/2018 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: ALL DOORS LOCKED, NEED ACCESS FOR INSPECTION | |||
| U - SEWER TIE IN | 06/22/2018 | APPROVED | MBACON |
| ROW - FINAL APRON (AFTER POUR) | 03/29/2018 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: ASPHALT PATCH HAS TO BE DONE, CLEAN THE CONCRETE OUT OF THE CULVERT PIPES AND REMOVE EXCESS OVER POUR FROM ALL OF THE MITERED END SECTIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 03/15/2018 | APPROVED - AS NOTED | KHOWELL |
| Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. COMPACT PRIOR TO POURING AND VERIFY THE DOWN STREAM PIPE IS NOT SET HIGHER THAN UP STREAM PIPE PRIOR TO POURING CONCRETE | |||
| LATH/BRICK/ WATER BARRIER | 02/23/2018 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 02/05/2018 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Not ready for inspection | |||
| ELECTRIC TEMP POLE | 01/23/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TEMP POLE 3:40 | |||
| FIREWALL | 01/12/2018 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| FIREWALL | 01/10/2018 | Disapproved - NO FEE | DROCKWELL |
| Note: THIS IS A REINSPECTION/ See results last inspection. Drywall and compound must extend all the way to sub-facia | |||
| INSULATION | 01/10/2018 | APPROVED | DROCKWELL |
| FIREWALL | 01/08/2018 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Firewall must extend all the way to sub-facia front and back. | |||
| ALL ROUGH | 12/14/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 12/08/2017 | Disapproved - NO FEE | DROCKWELL |
| Note: No pressure on supply side/No test on sanitary limes.Right side | |||
| ROOF VALLEY & METAL | 12/01/2017 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/09/2017 | APPROVED | DROCKWELL |
| TIE BEAM / LINTEL | 10/06/2017 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 10/05/2017 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 08/01/2017 | APPROVED | DROCKWELL |
| GRAVITY SEWER TEST | 07/25/2017 | APPROVED | JGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/21/2017 | APPROVED - AS NOTED | JGIBSON |
| Note: FIRST ROUGH AND GRAVITY SEWER INSPECTED AND APPROVED |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 08/15/2018 | 08/16/2018 |
| Note: Released By: DREWIS final s | |||
| SW1 | COMPLETE | 10/04/2017 | 10/05/2017 |
| Note: Released By: DREWIS Released By: DREWIS foundation s | |||
| BLD | COMPLETE | 06/06/2017 | 06/07/2017 |
| PLUM | COMPLETE | 05/16/2017 | 05/23/2017 |
| BLD | HOLD | 05/16/2017 | 05/23/2017 |
| Note: 1. Sheet 5: Provide legible plan with sufficient clarity. FBC 5th ed. 107.2.1. 2nd request J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 05/16/2017 | 05/23/2017 |
| BLD | HOLD | 04/28/2017 | 05/02/2017 |
| Note: 1. Sheet 5: Provide ligible plan with sufficient clarity. FBC 5th ed. 107.2.1. 2. Sheet 4: Foudation detail designations do not match with those shown on foundation plan. Coordinate per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| ELEC | HOLD | 04/28/2017 | 05/02/2017 |
| Note: 1. The electric plan must be signed and sealed or signed by the electrical contractor with their license number on it. J. Hindman 986-3784. | |||
| ENGIN1 | COMPLETE | 04/28/2017 | 05/02/2017 |
| MECH | COMPLETE | 04/28/2017 | 05/02/2017 |
| PLUM | HOLD | 04/28/2017 | 05/02/2017 |
| Note: Sanitray riser diagram does not match with floor plan. Coordinate for clarity per FBC 5th ed. 107.2.1. F.Reodica - 386-986-4734. | |||
| SW1 | COMPLETE | 04/28/2017 | 05/02/2017 |
| UD1 | COMPLETE | 04/28/2017 | 05/02/2017 |
| ZON | COMPLETE | 04/28/2017 | 04/28/2017 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/26/2018 |
| REINSPECTION FEE | ¤40.00 | 09/26/2018 |
| REINSPECTION FEE | ¤40.00 | 09/26/2018 |
| REINSPECTION FEE | ¤40.00 | 09/26/2018 |
| REINSPECTION FEE | ¤40.00 | 01/09/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤710.00 | 06/09/2017 |
| SITE PLAN 20 | ¤20.00 | 06/09/2017 |
| SURCHARGE FS 533.721 | ¤25.67 | 06/09/2017 |
| SURCHARGE - FS 468.631 | ¤25.67 | 06/09/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/09/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤187.48) | 06/09/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤187.48) | 06/09/2017 |
| ADMIN FEE | ¤20.00 | 06/09/2017 |
| ELECTRIC FEE | ¤273.00 | 06/09/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤12.86) | 06/09/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤12.86) | 06/09/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤428.58 | 06/09/2017 |
| IMPACT FEE PARKS | ¤1,698.48 | 06/09/2017 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 06/09/2017 |
| IMPACT FEE TRANSPORTATION | ¤6,249.34 | 06/09/2017 |
| MECHANICAL FEE | ¤273.00 | 06/09/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤50.95) | 06/09/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤50.95) | 06/09/2017 |
| PLAN CHECK FEE | ¤142.00 | 06/09/2017 |
| PLUMBING FEE | ¤273.00 | 06/09/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,116.16 |