I want to search for...
Permit #2017041166
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00570-0110 |
| CONDITIONED SPACE: 1360 sqft |
| CONDITIONED SPACE: 1360 sqft |
| GARAGE: 469 sqft |
| GARAGE: 469 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| OPENED PORCH (WITH ROOF) : 48 sqft |
| OPENED PORCH (WITH ROOF) : 131 sqft |
| OPENED PORCH (WITH ROOF) : 131 sqft |
| Total Square Footage: 4016 sqft |
| Block: 00570 |
| Subdivision: 2123 - SECTION 57-ULYSSES TREES |
| Job Phone: 386-931-2568 |
| Location Address: 9 UNION RUN CT |
| Type: DU - DUPLEX |
| Issue Date: 05/30/2017 |
| NOC: RECORDED |
| Applicant name: PETER JOSEPH LYDEN |
| Owner: MONKEVITCH EUGENE & OLGA H&W |
|
Address 46 NORTH PARK CIRCLE PALM COAST, FL 32137 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤100,000.00 |
| Job Description: DUPLEX NEW CONSTRUCTION |
| Type: CN |
Contractor
DEL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1009 BUNNELL, FL 32110 |
CBC1253392 (Exp: 08/31/2024) | 386-931-2568 |
Sub Contractors
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1009 BUNNELL, FL 32110 |
CBC1253392 (Exp: 08/31/2024) | 386-931-2568 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/14/2018 | FINAL APPROVED | DROCKWELL |
| BLD - BUILDING FINAL | 09/04/2018 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Display house numbers/Provide final survey on site/Garage receptical right side showing open neutral | |||
| U -UTILITY RESIDENTIAL FINAL | 08/28/2018 | FINAL APPROVED | MBACON |
| ROW - FINAL APRON (AFTER POUR) | 08/17/2018 | APPROVED - AS NOTED | CTROHA |
| Note: THIS IS A REINSPECTION MEETS THE MINIMUM REQUIREMENTS AT TIME OF THE INSPECTION | |||
| ROW - FINAL INSPECTION | 08/17/2018 | FINAL APPROVED | CTROHA |
| Note: MEETS THE MINIMUM REQUIREMENTS AT TIME OF THE INSPECTION | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/16/2018 | APPROVED | DREWIS |
| ROW - FINAL APRON (AFTER POUR) | 08/09/2018 | Disapproved -FEE REQUIRED | CTROHA |
| Note: SEE PREVIOUS INSPECTION NOTES | |||
| ROW - FINAL APRON (AFTER POUR) | 08/01/2018 | Disapproved - NO FEE | CTROHA |
| Note: APPROVED FINAL SURVEY IS REQUIRED TO BE ON SITE FOR THIS INSPECTION | |||
| ELECTRIC - EARLY POWER | 07/13/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 3:20 | |||
| ELECTRIC - EARLY POWER | 07/12/2018 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: ALL DOORS LOCKED, NEED ACCESS FOR INSPECTION | |||
| U - SEWER TIE IN | 06/22/2018 | APPROVED | MBACON |
| ROW - FINAL APRON (AFTER POUR) | 03/29/2018 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: ASPHALT PATCH HAS TO BE DONE, CLEAN THE CONCRETE OUT OF THE CULVERT PIPES AND REMOVE EXCESS OVER POUR FROM ALL OF THE MITERED END SECTIONS | |||
| ROW- PRE-APRON (PRE-POUR) | 03/15/2018 | APPROVED - AS NOTED | KHOWELL |
| Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. COMPACT PRIOR TO POURING AND VERIFY THE DOWN STREAM PIPE IS NOT SET HIGHER THAN UP STREAM PIPE PRIOR TO POURING CONCRETE. ABJUST MITERED END SECTION AS NEEDED TO MEET THE REQUIREMENTS OF THE CITY STANDARD DETAIL UPPER TO BE 18" | |||
| LATH/BRICK/ WATER BARRIER | 02/23/2018 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 02/05/2018 | Disapproved - NO FEE | DROCKWELL |
| Note: Not ready for inspection | |||
| INSULATION | 01/30/2018 | APPROVED | DROCKWELL |
| FIREWALL | 01/24/2018 | APPROVED | DROCKWELL |
| ALL ROUGH | 01/24/2018 | APPROVED | DROCKWELL |
| ROOF VALLEY & METAL | 12/08/2017 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/01/2017 | APPROVED - AS NOTED | DROCKWELL |
| Note: Provide solid blocking between trusses top and bottom at entry as so edge nailing requirements for sheathing can be met. | |||
| TIE BEAM / LINTEL | 10/06/2017 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 10/05/2017 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 08/03/2017 | APPROVED | DROCKWELL |
| GRAVITY SEWER TEST | 07/25/2017 | APPROVED | JGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/21/2017 | APPROVED - AS NOTED | JGIBSON |
| Note: FIRST ROUGH AND GRAVITY SEWER APPROVED |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 08/15/2018 | 08/16/2018 |
| Note: Released By: DREWIS final s | |||
| SW1 | COMPLETE | 10/04/2017 | 10/05/2017 |
| Note: Released By: DREWIS foundation s | |||
| PLUM | COMPLETE | 05/16/2017 | 05/23/2017 |
| BLD | COMPLETE | 05/16/2017 | 05/23/2017 |
| ELEC | COMPLETE | 05/16/2017 | 05/23/2017 |
| BLD | HOLD | 05/01/2017 | 05/02/2017 |
| Note: 1. Sheet 4: Foudation detail designations do not match with those shown on foundation plan. Coordinate per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| ELEC | HOLD | 05/01/2017 | 05/04/2017 |
| Note: 1. Electrical plan must be signed by the electrician with their license number on it. 5th ed. FBC 107.1. J. Hindman 986-3784. | |||
| ENGIN1 | COMPLETE | 05/01/2017 | 05/05/2017 |
| MECH | COMPLETE | 05/01/2017 | 05/02/2017 |
| PLUM | HOLD | 05/01/2017 | 05/02/2017 |
| Note: Provide sanitary riser diagram to each unit to match with floor plan per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| SW1 | COMPLETE | 05/01/2017 | 05/04/2017 |
| UD1 | COMPLETE | 05/01/2017 | 05/02/2017 |
| Note: This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 05/01/2017 | 05/01/2017 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/26/2018 |
| REINSPECTION FEE | ¤40.00 | 09/26/2018 |
| REINSPECTION FEE | ¤40.00 | 09/26/2018 |
| REINSPECTION FEE | ¤40.00 | 09/26/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤710.00 | 05/30/2017 |
| SITE PLAN 20 | ¤20.00 | 05/30/2017 |
| SURCHARGE FS 533.721 | ¤25.67 | 05/30/2017 |
| SURCHARGE - FS 468.631 | ¤25.67 | 05/30/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 05/30/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤187.48) | 05/30/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤187.48) | 05/30/2017 |
| ADMIN FEE | ¤20.00 | 05/30/2017 |
| ELECTRIC FEE | ¤273.00 | 05/30/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤12.86) | 05/30/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤12.86) | 05/30/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤428.58 | 05/30/2017 |
| IMPACT FEE PARKS | ¤1,698.48 | 05/30/2017 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 05/30/2017 |
| IMPACT FEE TRANSPORTATION | ¤6,249.34 | 05/30/2017 |
| MECHANICAL FEE | ¤273.00 | 05/30/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤50.95) | 05/30/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤50.95) | 05/30/2017 |
| PLAN CHECK FEE | ¤142.00 | 05/30/2017 |
| PLUMBING FEE | ¤273.00 | 05/30/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,076.16 |