Permit #2017050121
Permit Details
Status: COED
| Parcel Id: 07-11-31-7031-00130-0080 |
| CONDITIONED SPACE: 2700 sqft |
| OPENED PORCH (WITH ROOF) : 293 sqft |
| GARAGE: 594 sqft |
| OPENED PORCH (WITH ROOF) : 47 sqft |
| Total Square Footage: 3634 sqft |
| Block: 00130 |
| Subdivision: 2166 - SECTION 31-ROYAL PALMS |
| Job Phone: (386)931-1917 |
| Location Address: 39 RIDDLE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/20/2017 |
| NOC: RECORDED |
| Applicant name: BRAD MICHAEL THOMAS |
| Owner: PATEL, BHARAT |
|
Address 9 RED BARN DR PALM COAST, FL 32164 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤325,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
AUBURN HOMES INC.
| Status | Location Address | State License Number | Phone |
| HOLD |
1 HARGROVE GRADE STE 1E PALM COAST, FL 32137 |
CGC1506292 (Exp: 08/31/2020) | (386)931-1917 |
Sub Contractors
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1351 HAZELNUT ST BUNNELL, FL 32110 |
CFC1427527 (Exp: 08/31/2026) | 386-445-2532 | 386-445-5575 |
YORDANIS GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
33 RICKENBACKER DRIVE PALM COAST, FL 32164 |
CCC1328730 (Exp: 08/31/2026) | 386-804-4109 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/14/2018 | FINAL APPROVED | DROCKWELL |
| BLD - BUILDING FINAL | 03/13/2018 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Egress exits must be illuminated (porch lights)/Remove plastic cover from alarms as so they can be tested/Anchor laundry tub in garage | |||
| ROW - FINAL INSPECTION | 02/22/2018 | APPROVED | CTROHA |
| U -UTILITY RESIDENTIAL FINAL | 02/22/2018 | FINAL APPROVED | LFITZGERALD |
| U -UTILITY RESIDENTIAL FINAL | 02/21/2018 | Disapproved - NO FEE | LFITZGERALD |
| Note: pep panel with no power-please have power on during final(courtsey call made to Brad-Auburn homes) | |||
| ROW - FINAL INSPECTION | 02/21/2018 | Disapproved -FEE REQUIRED | RGROSS |
| Note: REMOVE TRASH AND DEBRIS FROM VACANT LOT | |||
| ROW - FINAL APRON (AFTER POUR) | 02/21/2018 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 02/21/2018 | APPROVED | FREODICA |
| Note: Previously approved by D. Rewis 2-19-19 | |||
| ELECTRIC - EARLY POWER | 02/16/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 10:20 | |||
| ROW- PRE-APRON (PRE-POUR) | 01/16/2018 | APPROVED - AS NOTED | CTROHA |
| Note: FOOTPRINT OF DRIVEWAY DOESN'T MATCH PROPOSED YOU NEED TO GET A REVISION i SPOKE TO BRAD ABOUT THIS AT TIME OF INSPECTION READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| GRAVITY SEWER TEST | 01/09/2018 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 01/08/2018 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: P-2503.4 BUILGING SEWER TESTING NO WATER IN STAND PIPE | |||
| U - SEWER TIE IN | 01/08/2018 | APPROVED | LFITZGERALD |
| LATH/BRICK/ WATER BARRIER | 12/05/2017 | APPROVED | DROCKWELL |
| INSULATION | 11/20/2017 | APPROVED | DROCKWELL |
| ALL ROUGH | 11/14/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 11/13/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Tap-con straps at block wall/Fireblocking at drop ceilings/Notch gas line into wall/at top/Tighten all rods/Frame electric panel | |||
| ROOF VALLEY & METAL | 10/11/2017 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/05/2017 | APPROVED | DROCKWELL |
| ELECTRIC TEMP POLE | 09/28/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TEMP POLE 12:00 | |||
| TIE BEAM / LINTEL | 09/06/2017 | APPROVED | WMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 09/05/2017 | APPROVED | FREODICA |
| MONOLITHIC SLAB | 08/11/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 08/10/2017 | CANCELLED BY APPLICANT | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/04/2017 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 02/19/2018 | 02/19/2018 |
| Note: Released By: DREWIS Released By: DREWIS final s. | |||
| SW1 | COMPLETE | 02/16/2018 | 02/19/2018 |
| Note: Released By: DREWIS Complete for revision to driveway. Still need second copy for final survey from 15FEB. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 02/15/2018 | 02/19/2018 |
| Note: Released By: TBAKER | |||
| SW1 | HOLD | 02/15/2018 | 02/16/2018 |
| Note: Held By: DREWIS Please provide a second signed and sealed copy of the final survey. Daniel Rewis 986-4736 | |||
| ZON | COMPLETE | 02/15/2018 | 02/15/2018 |
| Note: Released By: AMOBLEY | |||
| SW1 | COMPLETE | 09/05/2017 | 09/05/2017 |
| Note: Released By: FREODICA foundation | |||
| ZON | COMPLETE | 06/16/2017 | 06/16/2017 |
| ELEC | COMPLETE | 06/16/2017 | 06/19/2017 |
| BLD | COMPLETE | 05/03/2017 | 05/04/2017 |
| ELEC | HOLD | 05/03/2017 | 05/04/2017 |
| Note: 1. Provide a smoke detector inside master bedroom per 5th ed. FBC R 314. J. Hindman 986-3784. | |||
| ENGIN1 | COMPLETE | 05/03/2017 | 05/08/2017 |
| MECH | COMPLETE | 05/03/2017 | 05/04/2017 |
| PLUM | COMPLETE | 05/03/2017 | 05/04/2017 |
| SW1 | COMPLETE | 05/03/2017 | 05/04/2017 |
| UD1 | COMPLETE | 05/03/2017 | 05/04/2017 |
| ZON | HOLD | 05/03/2017 | 05/04/2017 |
| Note: House does not meet the minimum front setback of 25' |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/14/2018 |
| REINSPECTION FEE | ¤40.00 | 03/14/2018 |
| REINSPECTION FEE | ¤40.00 | 03/14/2018 |
| REINSPECTION FEE | ¤40.00 | 03/14/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤214.29 | 03/14/2018 |
| IMPACT FEE PARKS | ¤849.24 | 03/14/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 03/14/2018 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 03/14/2018 |
| MECHANICAL FEE | ¤262.80 | 06/20/2017 |
| PLAN CHECK FEE | ¤135.20 | 06/20/2017 |
| PLUMBING FEE | ¤262.80 | 06/20/2017 |
| ADMIN FEE | ¤20.00 | 06/20/2017 |
| ELECTRIC FEE | ¤262.80 | 06/20/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤676.00 | 06/20/2017 |
| SITE PLAN 20 | ¤20.00 | 06/20/2017 |
| SURCHARGE FS 533.721 | ¤24.59 | 06/20/2017 |
| SURCHARGE - FS 468.631 | ¤24.59 | 06/20/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 06/20/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,716.98 |