Permit #2017060137

Permit Details

Status: COED

Parcel Id: 15-11-31-2970-00000-0590
CONDITIONED SPACE: 2741 sqft
GARAGE: 755 sqft
OPENED PORCH (WITH ROOF) : 400 sqft
OPENED PORCH (WITH ROOF) : 71 sqft
Total Square Footage: 3967 sqft
Block: 00000
Subdivision: 2070 - Grand Haven North Phase 1 @ Grand Haven
Job Phone: 386-947-4481
Location Address: 54 WATERVIEW DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/12/2017
NOC: RECORDED
Applicant name: ERIC CHRISTOPHER OLSEN
Owner: TERRY GRAMELSPACHER HABIG AS TRUSTEE

Address

OF THE TERRY GRAMELSPACHER HABIG LIVING

PALM COAST, FL 32164

Address

54 N WATERVIEW DR

PALM COAST, FL 32164

Lot: 0590
Contracted Stated Job Value: ¤350,000.00
Job Description: New Construction - Single Family Residence
Type: CN

Contractor

OLSEN CUSTOM HOMES AND CONSULTING INC
Status Location Address State License Number Phone Fax
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

CGC1508852 (Exp: 08/31/2026) 386-947-4481 (386)947-4484

Sub Contractors

GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone Fax
CANCEL

2 HARGROVE GRADE

PALM COAST, FL 32136

CAC048127 (Exp: 08/31/2018) 386-445-5023 386-446-4614
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
MARK A RUGGIERO
Status Location Address State License Number Phone
INACTIVE

411 6TH STREET

HOLLY HILL , FL 32117

01612 (Exp: 07/23/2023) 386-252-5555
BERT S MCLAUGHLIN
Status Location Address State License Number Phone
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13006455 (Exp: 08/31/2026) 386-265-2687
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
ROW- PROJECT STATUS 02/01/2018 APPROVED - AS NOTED RGROSS
Note: STORM DRAIN DETERIORATION WAS PRE EXISTING TO CONSTRUCTION.
ROW - FINAL APRON (AFTER POUR) 01/31/2018 APPROVED RGROSS
BLD - BUILDING FINAL 01/30/2018 FINAL APPROVED CMINI
U -UTILITY RESIDENTIAL FINAL 01/29/2018 FINAL APPROVED LFITZGERALD
Note: please remove excessive soils in water meter svc. pit
FINAL SURVEY (OFFICE USE ONLY) 01/29/2018 APPROVED DREWIS
FINAL APRON (AFTER POUR/DRIVEWAY) 01/26/2018 APPROVED - AS NOTED RGROSS
Note: THIS IS A REINSPECTION. PLEASE USE THE 9000 CODES NOT THE 7000.
ROW - FINAL INSPECTION 01/26/2018 CANCELLED BY INSPECTOR RGROSS
Note: 7000 CODE USED BY BUILDER.
FINAL APRON (AFTER POUR/DRIVEWAY) 01/17/2018 Disapproved -FEE REQUIRED RGROSS
Note: DRIVEWAY APRON FLARES MUST BE A MINIMUM OF 36 INCHES.
ROW- PRE-APRON (PRE-POUR) 12/22/2017 APPROVED CTROHA
Note: READY FOR PAVERS It is the BUILDER'S RESPONSIBILITY: to form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast.
U - SEWER TIE IN 12/20/2017 APPROVED LFITZGERALD
GRAVITY SEWER TEST 12/20/2017 APPROVED JGIBSON
ELECTRIC - EARLY POWER 12/08/2017 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTIONcalled fpl to release power at 230pm, spoke to Dell
LATH/BRICK/ WATER BARRIER 10/30/2017 APPROVED CMINI
INSULATION 10/30/2017 APPROVED CMINI
Note: THIS IS A REINSPECTION
INSULATION 10/26/2017 Disapproved -FEE REQUIRED WMILLER
Note: BAFFLES REQUIRED 26 IN ACCORDANCE WITH FBC ENERGY CONSERVATION R303.2.1 AND MANUFACTURER SPECS. (at changes in ceiling heights) minimum thickness of fire blocking not met FIREBLOCKING R302.11 1-6
ALL ROUGH 10/23/2017 APPROVED CMINI
Note: THIS IS A REINSPECTION
ALL ROUGH 10/19/2017 CANCELLED BY APPLICANT CMINI
ELECTRIC - EARLY POWER 10/19/2017 Disapproved - NO FEE RMARTIN
Note: NOT READY FOR EARLY POWER, TUG PASSED ON 10/18, APPROVED PLAN CALLS FOR 4/0 TO PANELS, NEED REVISION BY EARLY POWER ON 2/0 INSTALLED
ELECTRIC-TUG 10/18/2017 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED TUG 1:00
ROOF VALLEY & METAL 09/26/2017 APPROVED CMINI
ROOF SHEATHING 09/06/2017 APPROVED CMINI
TIE BEAM / LINTEL 08/25/2017 APPROVED DROCKWELL
ELEV CERT-FOUNDATION APPROVAL 08/25/2017 APPROVED DBEVAN
FOUND SURVEY APPROVED (OFFICE) 08/17/2017 APPROVED FREODICA
MONOLITHIC SLAB 07/31/2017 APPROVED - AS NOTED CMINI
Note: 2 uprights missing circled on plans, check on lintel
PLUMBING 1ST ROUGH UNDERGROUND 07/24/2017 APPROVED - AS NOTED JGIBSON
Note: NEED TO LIST RIGHT PLUMBING SUB-COTRACTOR '' MARK PEARSON'' PERSON PLUMBING BEFORE NEXT INSPECTION

Review History

Department Status Date In Date Out
PLFM COMPLETE 01/29/2018 01/31/2018
Note: Released By: DBEVAN The provided elevation certificate at “Finished Construction” has been deemed sufficient.
SW1 COMPLETE 01/26/2018 01/29/2018
Note: Released By: DREWIS final s
PLFM COMPLETE 08/24/2017 08/24/2017
Note: Released By: DBEVAN The provided elevation certificate at “Building Under Construction” has been deemed sufficient. A “Finished Construction” elevation will be required prior to CO.
PLFM HOLD 08/18/2017 08/18/2017
Note: Held By: DBEVAN 1. For the proposed structure, no crawlspaces or enclosures are applicable for the house; section A8 a), b), c) is correct; however, Section A8 e) requires an election of “Yes” or “No”; check “No” based on the information provided. For Section A9, there is an attached garage and the fields are applicable. For Section A9 b) and A9 c) should be “0”. Section A9 d) requires an election of “Yes” or “No”; check “No” based on the information provided. 2. For Section C2 a) through h), all elevations should be to the tenth decimal place. The previously provided elevation certificate dated 08-14-17 reflected this standard. For example C2 a) was 12.4; the submitted certificate C2 a) is 12.38. Provide an updated elevation certificate. 3. The provided hard copy of the elevation certificate which was signed and sealed only included pages 1 and 2. At resubmittal, provide pages 1 through 4 as noted in Section D Comments #1. The City of Palm Coast is required to keep an original signed and sealed elevation certificate on file.
PLFM HOLD 08/15/2017 08/16/2017
Note: Held By: DBEVAN 1. For Section A4 of the elevation certificate, please provide a description. 2. For Section A5, a datum is not checked. 3. For Section A8d) and A9d), please check applicable reference. On the August 14, 2017 elevation certificate, “No” was checked. 4. The provided elevation certificate was not digitally signed. Provide a hard copy of the revised elevation certificate to the Building Division. Online submittal of the scanned copy or a digitally signed and sealed is permissible to expedite the review; however, the City of Palm Coast is required to keep an original signed and sealed elevation certificate on file. 5. For Section C2, staff is aware of the FEMA form glitch that only permits to two decimal places (hundreds). At final elevation certificate submittal, the calculation must be to the tenths. For example “12.4”.
SW1 COMPLETE 08/14/2017 08/17/2017
Note: Released By: FREODICA foundation survey
PLFM HOLD 08/14/2017 08/15/2017
Note: Held By: DBEVAN 1. Staff recently received updated guidance and now aware that FEMA has released an updated form for completing elevation certificates. The new form permits “N/A” entries for Section A8 a), A8 b), and A8 c). For the proposed structure, no crawlspaces or enclosures are applicable. Provide an updated elevation certificate utilizing “N/A” instead of “0” for the referenced fields. 2. Section B10 notes that “Other/Source” was utilized to establish B9; however, there is a reference to the FIRM. Clarify the interpolation of the FIRM and why the check box for “FIRM” is not the appropriate option. Informational: On final survey, elevations shall be provided for FFE, garage and lowest servicing machinery (a/c pad according to current survey notes).
PLFM COMPLETE 06/22/2017 06/23/2017
Note: Released By: DRAMIREZ
ELEC COMPLETE 06/22/2017 06/27/2017
Note: Released By: JHINDMAN
URB COMPLETE 06/06/2017 06/08/2017
Note: Released By: JBEAUDET
PLFM HOLD 06/06/2017 06/09/2017
Note: Held By: DBEVAN Verify if a propane tank installation is part of this application. If yes, note location on proposed site plan which depicts the floodplain designation, X or AE. If located in AE, the following information will be required. The tank shall be installed 1-foot above base flood elevation [10.02.06, LDC] and anchored to ensure that the tank will not be displaced due to buoyancy forces and result in flood hazards. If the applicant proposes to bury the tank, provide calculations and detail of how the tank will be anchored to minimize threat of buoyancy hazards. Address the following for the provided elevation certificate. • In Section A2 for Zip Code, amend the Zip Code field to reflect 32137. Note the same for the subsequent page. • For Section B9, utilize a measurement to one decimal place. For example, 6.0’ would be sufficient.
BLD COMPLETE 06/05/2017 06/09/2017
Note: Released By: FREODICA
ELEC HOLD 06/05/2017 06/12/2017
Note: Held By: JHINDMAN 1. Provide electrical load calculations per 2011 NEC art 220.
ENGIN1 COMPLETE 06/05/2017 06/08/2017
Note: Released By: TBAKER
MECH COMPLETE 06/05/2017 06/09/2017
Note: Released By: FREODICA
PLUM COMPLETE 06/05/2017 06/09/2017
Note: Released By: FREODICA
SW1 COMPLETE 06/05/2017 06/12/2017
Note: Released By: JHINDMAN
UD1 COMPLETE 06/05/2017 06/06/2017
Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON COMPLETE 06/05/2017 06/06/2017
Note: Released By: TDOAK

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 01/30/2018
REINSPECTION FEE ¤40.00 01/30/2018
REINSPECTION FEE ¤40.00 01/30/2018
NEW RESIDENTIAL INSPECTIONS ¤708.00 07/12/2017
SITE PLAN 20 ¤20.00 07/12/2017
SURCHARGE FS 533.721 ¤51.20 07/12/2017
SURCHARGE - FS 468.631 ¤51.20 07/12/2017
STORM WATER PERMIT FEES ¤80.00 07/12/2017
3% TRANS IMPACT FEE CREDIT (¤93.74) 07/12/2017
WORK WITHOUT PERMIT ¤1,706.80 07/12/2017
ELECTRIC FEE ¤272.40 07/12/2017
3% FIRE IMPACT FEE CREDIT (¤6.56) 07/12/2017
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 07/12/2017
IMPACT FEE PARKS ¤849.24 07/12/2017
IMPACT FEE SCHOOL ¤3,600.00 07/12/2017
IMPACT FEE TRANSPORTATION ¤3,124.67 07/12/2017
MECHANICAL FEE ¤272.40 07/12/2017
3% PARKS IMPACT FEE CREDIT (¤25.48) 07/12/2017
PLAN CHECK FEE ¤141.60 07/12/2017
PLUMBING FEE ¤272.40 07/12/2017
ADMIN FEE ¤20.00 07/12/2017
Fees Total Due: ¤0.00 Total Paid: ¤11,382.92