I want to search for...
Permit #2017060726
Permit Details
Status: FINAL
| Parcel Id: 05-11-31-5918-00000-0290 |
| Block: 00000 |
| Subdivision: 2244 - VILLAGE AT PALM COAST PH 1 |
| Job Phone: (386)586-6363 |
| Location Address: 111 LONGVIEW WAY N |
| Type: DK - DOCK |
| Issue Date: 07/26/2017 |
| NOC: RECORDED |
| Applicant name: CRAIG PECK |
| Owner: PRETTYMAN, RONALD M |
|
Address 4228 SYCAMORE LANE RED LION, PA 17356 |
| Lot: 0290 |
| Contracted Stated Job Value: ¤30,000.00 |
| Job Description: BOAT DOCK |
| Type: CN |
Contractor
SEAPECK SALES & SERVICE INC
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3271 NORTH OLD DIXIE HIGHWAY BUNNELL, FL 32110 |
CRC1329041 (Exp: 08/31/2026) | (386)586-6363 | (386)586-6363 |
Sub Contractors
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL - BUILDING MISC | 08/30/2018 | FINAL APPROVED | WMILLER |
| Note: FINAL APPROVED |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 07/05/2017 | 07/06/2017 |
| Note: Released By: JGONZALEZ | |||
| PLENV | COMPLETE | 07/05/2017 | 07/10/2017 |
| Note: Released By: DBEVAN | |||
| PLENV | HOLD | 06/20/2017 | 06/28/2017 |
| Note: Held By: DBEVAN 1. Provide a copy of the executed HOA access easement agreement for the proposed structure. 2. Provide updated survey results from a City of Palm Coast Qualified Environmental Professional (QEP) for listed species prior to construction activities. Gopher tortoise are known to inhabit the area. 3. A permanent sign measuring at least 8-1/2" by 11" will be placed in a visible location at the entrance of each dock from land which reads Caution: Manatee Area in block print. Typical signs will include a small picture of a manatee but is not required. Provide a design sample of the permanent sign to be installed. The following actions shall be taken during construction. • All projects must use Florida Fish and Wildlife Conservation Commission (FFWCC) approved screens or barriers to prevent manatees from entering the construction zone. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement. • All projects shall implement a manatee observer with after action reporting. At least one person shall be designated as a manatee observer when in-water work is being performed. That person shall have experience in manatee observation and equipped with polarized sunglasses to aid in observation. The manatee observer must be on site during all in-water construction activities and will advise personnel to cease operation upon sighting a manatee within 50 feet of any in-water construction activity. • Movement of a work barge, other associated vessels, or any in-water work shall not be performed after sunset, or before sunrise when the possibility of spotting manatees is negligible. • All vessels associated with the construction project shall operate at idle Speed/No Wake” at all times while in the immediate area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible. • Any collision with or injury to a manatee shall be reported immediately to the FWC Hotline at 1-888-404-FWCC. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772-562-3909) for south Florida. • Temporary signs concerning manatees shall be posted prior to and during all in-water project activities. All signs are to be removed by the permittee upon completion of the project. Awareness signs that have already been approved for this use by the Florida Fish and Wildlife Conservation Commission (FWC) must be used. One sign measuring at least 3 ft. by 4 ft. which reads Caution: Manatee Area must be posted. A second sign measuring at least 8-1/2" by 11" explaining the requirements for “Idle Speed/No Wake” and the shutdown of in-water operations must be posted in a location prominently visible to all personnel engaged in water-related activities. • Construction staff shall undergo a pre-construction educational program to familiarize the staff with manatee regulations and proper in-water protocol to prevent harm to manatees. | |||
| BLD | COMPLETE | 06/20/2017 | 06/26/2017 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 06/20/2017 | 06/26/2017 |
| Note: Released By: JHINDMAN | |||
| ZON | HOLD | 06/20/2017 | 06/20/2017 |
| Note: Held By: TDOAK 1. Revise dock/walkway dimensions to match approved Master Plan. 2. Roof over dock is not allowed. Remove all reference to the roof. 3. Provide recorded Easement document with exhibits specific to this property as per Master Plan. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | (¤40.00) | 08/29/2018 |
| CONTRACTOR CHANGE | ¤40.00 | 08/29/2018 |
| CONTRACTOR CHANGE | ¤40.00 | 08/29/2018 |
| EXTENSION | ¤40.00 | 08/29/2018 |
| EXTENSION | (¤40.00) | 08/29/2018 |
| EXTENSION | ¤40.00 | 08/29/2018 |
| PLAN CHECK FEE | ¤40.00 | 07/26/2017 |
| REMODEL/ADDITION/ACCES INSPECT | ¤40.00 | 07/26/2017 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/26/2017 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/26/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 07/26/2017 |
| ADMIN FEE | ¤20.00 | 07/26/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤264.00 |