Permit #2017060873

Permit Details

Status: COED

Parcel Id: 22-11-31-5725-00000-0100
CONDITIONED SPACE: 2120 sqft
GARAGE: 668 sqft
OPENED PORCH (WITH ROOF) : 25 sqft
OPENED PORCH (WITH ROOF) : 147 sqft
Total Square Footage: 2960 sqft
Block: 00000
Subdivision: 2071 - South Park Village at Grand Haven
Job Phone: 386-236-4133
Location Address: 37 RIVERBEND DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/10/2017
NOC: RECORDED
Applicant name: LEONARDO CIRO SANCLEMENTE
Owner: MANFRED GRUENER

Address

44 FREY ROAD

NEW HARTFORD, CT 06057

Lot: 0100
Contracted Stated Job Value: ¤269,145.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INTERVEST CONSTRUCTION, INC.
Status Location Address State License Number Phone
CANCEL

2379 BEVILLE RD

DAYTONA BEACH, FL 32119

CBC1261237 (Exp: 08/31/2020) 386-236-4133

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
ROBERT CRAIG KULP
Status Location Address State License Number Phone
CANCEL

5401 ENERGY AIR CT

ORLANDO, FL 32810

CAC1816317 (Exp: 08/31/2022) 407-886-3729
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443
BARRY D MARTIN
Status Location Address State License Number Phone Fax
CANCEL

1650 N STATE STREET

Bunnell, FL 32110

CCC033728 (Exp: 08/31/2020) (386) 437-7700 (386)437-7701

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/27/2017 FINAL APPROVED WMILLER
ROW - FINAL INSPECTION 12/21/2017 APPROVED CTROHA
Note: THIS IS A REINSPECTION
ROW - FINAL INSPECTION 12/20/2017 Disapproved -FEE REQUIRED CTROHA
Note: REMOVE BLOCK FROM ADJACENT PROPERTY
FINAL SURVEY (OFFICE USE ONLY) 12/19/2017 APPROVED DREWIS
U -UTILITY RESIDENTIAL FINAL 12/15/2017 FINAL APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION
U -UTILITY RESIDENTIAL FINAL 12/12/2017 CANCELLED BY APPLICANT LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 12/12/2017 APPROVED CTROHA
Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION
ELECTRIC - EARLY POWER 12/08/2017 APPROVED - AS NOTED CMINI
Note: called fpl to release power at 230pm, spoke to Dell
ROW- PRE-APRON (PRE-POUR) 11/22/2017 APPROVED RGROSS
Note: THIS IS A REINSPECTION.
LATH/BRICK/ WATER BARRIER 11/16/2017 APPROVED WMILLER
Note: THIS IS A REINSPECTION
LATH/BRICK/ WATER BARRIER 11/15/2017 Disapproved -FEE REQUIRED WMILLER
Note: NOT READY STILL WORKING
ROW- PRE-APRON (PRE-POUR) 11/14/2017 PARTIALLY APPROVED RGROSS
Note: APPROVED FOR CONCRETE APRON POUR ONLY. PAVER DRIVEWAY
U - SEWER TIE IN 11/08/2017 APPROVED LFITZGERALD
GRAVITY SEWER TEST 11/08/2017 APPROVED JGIBSON
INSULATION 11/03/2017 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
INSULATION 11/02/2017 Disapproved -FEE REQUIRED CMINI
Note: not ready
ALL ROUGH 10/30/2017 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/11/2017 APPROVED WMILLER
ROOF VALLEY & METAL 10/11/2017 APPROVED WMILLER
EXTERIOR STRAP/CLIP 10/11/2017 APPROVED WMILLER
ELECTRIC-TUG 10/03/2017 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED POWER 2:50
ELEV CERT-FOUNDATION APPROVAL 09/28/2017 APPROVED DRAMIREZ
Note: Approved per my conversation with DENISE.
TIE BEAM / LINTEL 09/28/2017 APPROVED CMINI
FOUND SURVEY APPROVED (OFFICE) 09/26/2017 APPROVED DREWIS
MONOLITHIC SLAB 09/01/2017 APPROVED CMINI
FOOTER 09/01/2017 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 08/30/2017 APPROVED JGIBSON

Review History

Department Status Date In Date Out
PLFM COMPLETE 12/22/2017 12/22/2017
Note: Released By: KIANNOTTI Remarks addressed on revised final EC.
SW1 COMPLETE 12/18/2017 12/19/2017
Note: Released By: DREWIS final survey
PLFM HOLD 12/18/2017 12/20/2017
Note: Held By: DBEVAN For Sections A8 a), A8 b), and A8 c), there are no crawlspaces or enclosures are applicable. At the next submittal “Building Under Construction”, provide an updated elevation certificate with referenced section(s) updated to “N/A” instead of “0” for the referenced fields. Section A9 is correct. The above-referenced items are on the June 28, 2017 review as well.
PLFM COMPLETE 09/26/2017 09/27/2017
Note: Released By: DRAMIREZ The note in the surveyor comment section of the EC should have been removed because section C2.e is N/A. In the future both areas must be consistent with each other.
SW1 COMPLETE 09/25/2017 09/25/2017
Note: Released By: DREWIS foundation s
PLFM COMPLETE 08/08/2017 08/08/2017
Note: Released By: DRAMIREZ Elevation certificate decimal point issue must be updated prior to CO.
ZON COMPLETE 07/18/2017 07/18/2017
Note: Released By: AMOBLEY
PLUM COMPLETE 07/18/2017 07/26/2017
Note: Released By: FREODICA
ELEC COMPLETE 07/18/2017 07/19/2017
Note: Released By: JHINDMAN
PLFM HOLD 07/18/2017 07/20/2017
Note: Held By: DRAMIREZ Held By: DRAMIREZ 1. Correct Section 8, B-8 of the elevation certificate to list only one flood zone.The flood zone listed should be "AE" and not "X & AE". Portion of the structure as shown on the survey falls within the AE flood zone therefor establishing the structure to be in a flood zone. 2. Correct the survey to state the correct flood zone. Currently it is showing the property to be in an X zone.
PLFM HOLD 06/23/2017 06/28/2017
Note: Held By: DRAMIREZ Correct Section 8, B-8 to list only one flood zone. The flood zone listed should be "AE" and not "X & AE". Section A, A-8 should have the value listed as "0" and not N/A. A-8(a) - 0 A-8(b) - 0 A-8(c) - 0 A-9(c) - 0
BLD COMPLETE 06/22/2017 06/26/2017
Note: Released By: FREODICA
ELEC HOLD 06/22/2017 06/27/2017
Note: Held By: JHINDMAN 1. Provide electrical load calculations per 2011 NEC art 220. J. hindman 986-3784.
ENGIN1 COMPLETE 06/22/2017 06/27/2017
Note: Released By: TBAKER
MECH COMPLETE 06/22/2017 06/26/2017
Note: Released By: FREODICA
PLUM HOLD 06/22/2017 06/26/2017
Note: Held By: FREODICA 1. Provide signature of plumbing contractor of sanitary riser diagram per FBC 5th ed. 107.2.1. 2. Provide complete layout of sanitary riser diagram. The left side was partially omiited and and not legible to read per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734.
SW1 COMPLETE 06/22/2017 06/27/2017
Note: Released By: JHINDMAN
UD1 COMPLETE 06/22/2017 06/26/2017
Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON HOLD 06/22/2017 06/23/2017
Note: Held By: AMOBLEY 1. All windows and doors visible from right of way must be banded on all sides including garage doors 2. Per LDC 4.01.02 3. D:2. Walls shall be made of the following materials: Split-faced block or finished masonry walls where block seams are not visible. Finished masonry walls shall also include a tile,brick, or decorative trim at or near the top of the wall. Please provide the information,color and finish for the 4' masonry wall around house

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 12/22/2017
REINSPECTION FEE ¤40.00 12/22/2017
REINSPECTION FEE ¤40.00 12/22/2017
NEW RESIDENTIAL INSPECTIONS ¤540.00 08/10/2017
SITE PLAN 20 ¤20.00 08/10/2017
SURCHARGE FS 533.721 ¤20.31 08/10/2017
SURCHARGE - FS 468.631 ¤20.31 08/10/2017
STORM WATER PERMIT FEES ¤80.00 08/10/2017
3% TRANS IMPACT FEE CREDIT (¤93.74) 08/10/2017
ADMIN FEE ¤20.00 08/10/2017
ELECTRIC FEE ¤222.00 08/10/2017
3% FIRE IMPACT FEE CREDIT (¤6.56) 08/10/2017
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 08/10/2017
IMPACT FEE PARKS ¤849.24 08/10/2017
IMPACT FEE SCHOOL ¤3,600.00 08/10/2017
IMPACT FEE TRANSPORTATION ¤3,124.67 08/10/2017
MECHANICAL FEE ¤222.00 08/10/2017
3% PARKS IMPACT FEE CREDIT (¤25.48) 08/10/2017
PLAN CHECK FEE ¤108.00 08/10/2017
PLUMBING FEE ¤222.00 08/10/2017
Fees Total Due: ¤0.00 Total Paid: ¤9,261.54