Permit #2017060873
Permit Details
Status: COED
| Parcel Id: 22-11-31-5725-00000-0100 |
| CONDITIONED SPACE: 2120 sqft |
| GARAGE: 668 sqft |
| OPENED PORCH (WITH ROOF) : 25 sqft |
| OPENED PORCH (WITH ROOF) : 147 sqft |
| Total Square Footage: 2960 sqft |
| Block: 00000 |
| Subdivision: 2071 - South Park Village at Grand Haven |
| Job Phone: 386-236-4133 |
| Location Address: 37 RIVERBEND DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/10/2017 |
| NOC: RECORDED |
| Applicant name: LEONARDO CIRO SANCLEMENTE |
| Owner: MANFRED GRUENER |
|
Address 44 FREY ROAD NEW HARTFORD, CT 06057 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤269,145.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INTERVEST CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone |
| CANCEL |
2379 BEVILLE RD DAYTONA BEACH, FL 32119 |
CBC1261237 (Exp: 08/31/2020) | 386-236-4133 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
ROBERT CRAIG KULP
| Status | Location Address | State License Number | Phone |
| CANCEL |
5401 ENERGY AIR CT ORLANDO, FL 32810 |
CAC1816317 (Exp: 08/31/2022) | 407-886-3729 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
BARRY D MARTIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1650 N STATE STREET Bunnell, FL 32110 |
CCC033728 (Exp: 08/31/2020) | (386) 437-7700 | (386)437-7701 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/27/2017 | FINAL APPROVED | WMILLER |
| ROW - FINAL INSPECTION | 12/21/2017 | APPROVED | CTROHA |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL INSPECTION | 12/20/2017 | Disapproved -FEE REQUIRED | CTROHA |
| Note: REMOVE BLOCK FROM ADJACENT PROPERTY | |||
| FINAL SURVEY (OFFICE USE ONLY) | 12/19/2017 | APPROVED | DREWIS |
| U -UTILITY RESIDENTIAL FINAL | 12/15/2017 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 12/12/2017 | CANCELLED BY APPLICANT | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 12/12/2017 | APPROVED | CTROHA |
| Note: MEETS REQUIREMENTS AT TIME OF THE INSPECTION | |||
| ELECTRIC - EARLY POWER | 12/08/2017 | APPROVED - AS NOTED | CMINI |
| Note: called fpl to release power at 230pm, spoke to Dell | |||
| ROW- PRE-APRON (PRE-POUR) | 11/22/2017 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. | |||
| LATH/BRICK/ WATER BARRIER | 11/16/2017 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 11/15/2017 | Disapproved -FEE REQUIRED | WMILLER |
| Note: NOT READY STILL WORKING | |||
| ROW- PRE-APRON (PRE-POUR) | 11/14/2017 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR CONCRETE APRON POUR ONLY. PAVER DRIVEWAY | |||
| U - SEWER TIE IN | 11/08/2017 | APPROVED | LFITZGERALD |
| GRAVITY SEWER TEST | 11/08/2017 | APPROVED | JGIBSON |
| INSULATION | 11/03/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 11/02/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: not ready | |||
| ALL ROUGH | 10/30/2017 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/11/2017 | APPROVED | WMILLER |
| ROOF VALLEY & METAL | 10/11/2017 | APPROVED | WMILLER |
| EXTERIOR STRAP/CLIP | 10/11/2017 | APPROVED | WMILLER |
| ELECTRIC-TUG | 10/03/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED POWER 2:50 | |||
| ELEV CERT-FOUNDATION APPROVAL | 09/28/2017 | APPROVED | DRAMIREZ |
| Note: Approved per my conversation with DENISE. | |||
| TIE BEAM / LINTEL | 09/28/2017 | APPROVED | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 09/26/2017 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 09/01/2017 | APPROVED | CMINI |
| FOOTER | 09/01/2017 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/30/2017 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 12/22/2017 | 12/22/2017 |
| Note: Released By: KIANNOTTI Remarks addressed on revised final EC. | |||
| SW1 | COMPLETE | 12/18/2017 | 12/19/2017 |
| Note: Released By: DREWIS final survey | |||
| PLFM | HOLD | 12/18/2017 | 12/20/2017 |
| Note: Held By: DBEVAN For Sections A8 a), A8 b), and A8 c), there are no crawlspaces or enclosures are applicable. At the next submittal “Building Under Construction”, provide an updated elevation certificate with referenced section(s) updated to “N/A” instead of “0” for the referenced fields. Section A9 is correct. The above-referenced items are on the June 28, 2017 review as well. | |||
| PLFM | COMPLETE | 09/26/2017 | 09/27/2017 |
| Note: Released By: DRAMIREZ The note in the surveyor comment section of the EC should have been removed because section C2.e is N/A. In the future both areas must be consistent with each other. | |||
| SW1 | COMPLETE | 09/25/2017 | 09/25/2017 |
| Note: Released By: DREWIS foundation s | |||
| PLFM | COMPLETE | 08/08/2017 | 08/08/2017 |
| Note: Released By: DRAMIREZ Elevation certificate decimal point issue must be updated prior to CO. | |||
| ZON | COMPLETE | 07/18/2017 | 07/18/2017 |
| Note: Released By: AMOBLEY | |||
| PLUM | COMPLETE | 07/18/2017 | 07/26/2017 |
| Note: Released By: FREODICA | |||
| ELEC | COMPLETE | 07/18/2017 | 07/19/2017 |
| Note: Released By: JHINDMAN | |||
| PLFM | HOLD | 07/18/2017 | 07/20/2017 |
| Note: Held By: DRAMIREZ Held By: DRAMIREZ 1. Correct Section 8, B-8 of the elevation certificate to list only one flood zone.The flood zone listed should be "AE" and not "X & AE". Portion of the structure as shown on the survey falls within the AE flood zone therefor establishing the structure to be in a flood zone. 2. Correct the survey to state the correct flood zone. Currently it is showing the property to be in an X zone. | |||
| PLFM | HOLD | 06/23/2017 | 06/28/2017 |
| Note: Held By: DRAMIREZ Correct Section 8, B-8 to list only one flood zone. The flood zone listed should be "AE" and not "X & AE". Section A, A-8 should have the value listed as "0" and not N/A. A-8(a) - 0 A-8(b) - 0 A-8(c) - 0 A-9(c) - 0 | |||
| BLD | COMPLETE | 06/22/2017 | 06/26/2017 |
| Note: Released By: FREODICA | |||
| ELEC | HOLD | 06/22/2017 | 06/27/2017 |
| Note: Held By: JHINDMAN 1. Provide electrical load calculations per 2011 NEC art 220. J. hindman 986-3784. | |||
| ENGIN1 | COMPLETE | 06/22/2017 | 06/27/2017 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 06/22/2017 | 06/26/2017 |
| Note: Released By: FREODICA | |||
| PLUM | HOLD | 06/22/2017 | 06/26/2017 |
| Note: Held By: FREODICA 1. Provide signature of plumbing contractor of sanitary riser diagram per FBC 5th ed. 107.2.1. 2. Provide complete layout of sanitary riser diagram. The left side was partially omiited and and not legible to read per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| SW1 | COMPLETE | 06/22/2017 | 06/27/2017 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 06/22/2017 | 06/26/2017 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 06/22/2017 | 06/23/2017 |
| Note: Held By: AMOBLEY 1. All windows and doors visible from right of way must be banded on all sides including garage doors 2. Per LDC 4.01.02 3. D:2. Walls shall be made of the following materials: Split-faced block or finished masonry walls where block seams are not visible. Finished masonry walls shall also include a tile,brick, or decorative trim at or near the top of the wall. Please provide the information,color and finish for the 4' masonry wall around house |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 12/22/2017 |
| REINSPECTION FEE | ¤40.00 | 12/22/2017 |
| REINSPECTION FEE | ¤40.00 | 12/22/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤540.00 | 08/10/2017 |
| SITE PLAN 20 | ¤20.00 | 08/10/2017 |
| SURCHARGE FS 533.721 | ¤20.31 | 08/10/2017 |
| SURCHARGE - FS 468.631 | ¤20.31 | 08/10/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/10/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 08/10/2017 |
| ADMIN FEE | ¤20.00 | 08/10/2017 |
| ELECTRIC FEE | ¤222.00 | 08/10/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 08/10/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 08/10/2017 |
| IMPACT FEE PARKS | ¤849.24 | 08/10/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/10/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 08/10/2017 |
| MECHANICAL FEE | ¤222.00 | 08/10/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/10/2017 |
| PLAN CHECK FEE | ¤108.00 | 08/10/2017 |
| PLUMBING FEE | ¤222.00 | 08/10/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,261.54 |