Permit #2017070254
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7034-00020-0040 |
| Block: 00020 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-566-6533 |
| Location Address: 88 EMERSON DR |
| Type: DR - DRIVEWAY |
| Issue Date: 11/21/2017 |
| NOC: Unknown |
| Applicant name: MARCOS SANTOS |
| Owner: WILTFONG, KRISTOPHER L & MEGAN L |
|
Address 88 EMERSON DRIVE PALM COAST, FL 32164 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤2,250.00 |
| Job Description: CIRCULAR DRIVEWAY |
| Type: CN |
Contractor
MARCOS CONCRETE DESIGN, INC
| Status | Location Address | Phone |
| INACTIVE |
5948 BROKEN BOW LANE PORT ORANGE, FL 32127 |
386-566-6533 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 05/10/2018 | FINAL APPROVED | MBACON |
| ROW - FINAL INSPECTION | 05/09/2018 | FINAL APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 05/09/2018 | APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL APRON (AFTER POUR) | 05/08/2018 | CANCELLED BY APPLICANT | KHOWELL |
| Note: THIS IS A REINSPECTION MARCOS CALLED AND CANCELLED | |||
| ROW - FINAL INSPECTION | 05/08/2018 | CANCELLED BY APPLICANT | KHOWELL |
| Note: THIS IS A REINSPECTION MARCOS CALLED AND CANCELLED | |||
| ROW - FINAL INSPECTION | 04/19/2018 | Disapproved - NO FEE | KHOWELL |
| Note: SEE NOTES IN THE APRON AFTER POUR, SITE PLAN DOES NOT MATCH WHAT WAS DONE | |||
| ROW - FINAL APRON (AFTER POUR) | 04/19/2018 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: REMOVE CONCRETE OVER POUR PAST THE END OF THE MITERS IN THE SWALE. CONCRETE INTO THE ROADWAY, HAS TO HAVE A ASPHALT HOT PATCH | |||
| ROW- PRE-APRON (PRE-POUR) | 12/11/2017 | APPROVED | RGROSS |
| Note: READY TO POUR |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 08/24/2017 | 08/24/2017 |
| Note: Released By: TAWILLIAMS | |||
| ENGIN1 | COMPLETE | 07/10/2017 | 07/18/2017 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 07/10/2017 | 07/11/2017 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 07/10/2017 | 07/13/2017 |
| Note: Released By: MBACON All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA clear zone for a hydrant is 3 feet from both sides and 3 feet behind the hydrant. Front of hydrant shall remain completely clear. | |||
| ZON | HOLD | 07/10/2017 | 07/11/2017 |
| Note: Held By: TAWILLIAMS Please show the right setback to the property line. Need to show a minimum of 5' setback from property line to the arch. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/07/2018 |
| SITE PLAN 20 | ¤20.00 | 11/21/2017 |
| SURCHARGE - FS 468.631 | ¤2.00 | 11/21/2017 |
| STORM WATER PERMIT FEES | ¤40.00 | 11/21/2017 |
| ADMIN FEE | ¤20.00 | 11/21/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤122.00 |