I want to search for...
Permit #2017070463
Permit Details
Status: COED
| Parcel Id: 07-11-31-7004-00130-0160 |
| CONDITIONED SPACE: 2880 sqft |
| GARAGE: 507 sqft |
| OPENED PORCH (WITH ROOF) : 346 sqft |
| OPENED PORCH (WITH ROOF) : 37 sqft |
| Total Square Footage: 3770 sqft |
| Block: 00130 |
| Subdivision: 2203 - SECTION 4-COUNTRY CLUB COVE |
| Job Phone: (386)383-0376 |
| Location Address: 2 CRESCENT CT S |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/03/2017 |
| NOC: RECORDED |
| Applicant name: ANTHONY CRAIG GUCCIONE |
| Owner: MAGGIPINTO FRANK & NANCY H&W |
|
Address 318 EASYRESTOWN ROAD SOUTHHAMPTON, NJ 08088 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLD COAST HOME BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 354707 PALM COAST, FL 32137 |
CGC1507791 (Exp: 08/31/2026) | 386-313-6221 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32136 |
CAC048127 (Exp: 08/31/2018) | 386-445-5023 | 386-446-4614 |
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
WILLIAM D ALLEN
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
546 S. SHELL ROAD DEBARY, FL 32713 |
LQ27843 (Exp: 08/13/2024) | 386-668-9592 | (386)668-8577 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/12/2018 | FINAL APPROVED | CMINI |
| BLD - BUILDING FINAL | 04/09/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. WEATHER STRIPPING NEEDS TO BE INSTALLED R 612.1 FBC back bathroom 2. UNIT LABELING..FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER AND OR CONDENSOR UNIT WITH FACTORY APPLIED LABEL. 3. SHOWER ACCESS MINIMUM CLEAR OPEN WIDTH 26. 2708.1.1 OPENING SHALL HAVE A CLEAR AND UNOBSTRUCTED FINNESHEDD WIDTH ONOT LESS THAN 22 inches. 4. FALL PROTECTION HANDRAILS REQUIRED 26 R312.1, WALKING SURFACE MUST HAVE FALL PROTECTION WHERE THE DISTANCE MEASURED FROM THE WALKING SURFACE TO THE FLOOR OR GRADE BELOW IS 30 1D OR MORE. AT ANY POINT WITHIN 36 1D MEASURED VERTICALLY TO THE OPEN SIDE OF THE WALKING SURFACE | |||
| U -UTILITY RESIDENTIAL FINAL | 04/06/2018 | FINAL APPROVED | JNICHOLS |
| ROW - DRAINAGE | 04/05/2018 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL INSPECTION | 04/05/2018 | APPROVED | RGROSS |
| ROW - FINAL INSPECTION | 04/02/2018 | Disapproved -FEE REQUIRED | RGROSS |
| Note: BAHIA SOD NEEDED ALONG BANK ON THE RIGHT AND LEFT SIDE OF THE SEAWALL. POP UP IRRIGATION NEEDS MOVED A MINIMUM OF 5 FT FROM SEAWALL TO PREVENT WASHOUT AT THE SEAWALL. ON SITE WITH SUPER. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/02/2018 | APPROVED | RGROSS |
| FINAL SURVEY (OFFICE USE ONLY) | 03/28/2018 | APPROVED | DREWIS |
| GAS FINAL | 03/16/2018 | APPROVED | JGIBSON |
| GAS FINAL | 02/27/2018 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: GAS NOT TIED INTO TANK YET CAN NOT GIVE GAS FINAL UNTIL ALL GAS WORK COMPLETED | |||
| ELECTRIC - EARLY POWER | 02/02/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 3:25 | |||
| ROW- PRE-APRON (PRE-POUR) | 01/11/2018 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. READY FOR PAVERS. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/08/2018 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR CONCRETE APRON ONLY. PAVER DRIVEWAY. 2ND PART OF THE PRE-POUR WILL BE REQUIRED WHEN BASE IS IN PLACE AND COMPACTED AND PAVERS ON SITE. | |||
| INSULATION | 11/28/2017 | APPROVED | CMINI |
| LATH/BRICK/ WATER BARRIER | 11/28/2017 | APPROVED | CMINI |
| ALL ROUGH | 11/17/2017 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ALL ROUGH | 11/16/2017 | Disapproved -FEE REQUIRED | WMILLER |
| Note: too many deficient items to list all, contractor has list.... partial list follows... 1. NAIL PLATES ON ELECTRIC FBC E3802.1 2. NAIL PLATES FOR PLUMBING P2603.2.1 3. FIREBLOCKING R302.11 1-6 (missing and minimum thickness not met | |||
| GRAVITY SEWER TEST | 11/07/2017 | APPROVED | JGIBSON |
| GAS ROUGH | 11/07/2017 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 11/07/2017 | APPROVED | JNICHOLS |
| WALL SHEATHING | 11/03/2017 | APPROVED | CMINI |
| WALL SHEATHING | 11/02/2017 | CANCELLED BY APPLICANT | AIRS WEB |
| ROOF VALLEY & METAL | 10/24/2017 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/23/2017 | APPROVED | CMINI |
| ELECTRIC-TUG | 10/19/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED TUG 3:40 | |||
| TIE BEAM / LINTEL | 10/05/2017 | APPROVED | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 10/04/2017 | Disapproved - NO FEE | RMARTIN |
| Note: THIS IS NOT A CALL IN INSPECTION, NEED TO TURN IN TO OFFICE | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/04/2017 | APPROVED | DREWIS |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 09/22/2017 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/19/2017 | APPROVED | JGIBSON |
| RETAINING WALL | 09/05/2017 | APPROVED | DROCKWELL |
| RETAINING WALL FOUNDATION | 08/24/2017 | APPROVED | CMINI |
| RETAINING WALL FOUNDATION | 08/23/2017 | CANCELLED BY APPLICANT | AIRS WEB |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 03/27/2018 | 03/28/2018 |
| Note: Released By: DREWIS final s | |||
| PLUM | COMPLETE | 01/11/2018 | 01/18/2018 |
| Note: Released By: FREODICA Revision: Changed gas riser diagram. | |||
| PLUM | HOLD | 12/21/2017 | 12/27/2017 |
| Note: Held By: FREODICA The revised gas riser diagram shall have signature of gas contractor per FBC 5th ed 107.3.2. F.Reodica -386-986-4734.. | |||
| ZON | COMPLETE | 12/21/2017 | 12/21/2017 |
| Note: Released By: TAWILLIAMS upgraded from 120LP tank to 250 LP tank | |||
| ELEC | COMPLETE | 11/14/2017 | 11/16/2017 |
| Note: Released By: DREWIS | |||
| SW1 | COMPLETE | 10/04/2017 | 10/04/2017 |
| Note: Released By: DREWIS correction foundation | |||
| ZON | COMPLETE | 07/28/2017 | 07/28/2017 |
| Note: Released By: TDOAK | |||
| MECH | COMPLETE | 07/28/2017 | 08/02/2017 |
| Note: Released By: FREODICA | |||
| PLUM | COMPLETE | 07/28/2017 | 08/02/2017 |
| Note: Released By: FREODICA | |||
| BLD | COMPLETE | 07/17/2017 | 07/19/2017 |
| Note: Released By: FREODICA | |||
| ELEC | COMPLETE | 07/17/2017 | 07/19/2017 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 07/17/2017 | 07/27/2017 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 07/17/2017 | 07/19/2017 |
| Note: Held By: FREODICA Provide hvac plan with sufficient clarity and shall have signature and licence number of hvac contractor per FBC 5th ed. 107.2.1/105.3.1.2.. F.Reodica -386-986-4734. | |||
| PLUM | HOLD | 07/17/2017 | 07/19/2017 |
| Note: Held By: FREODICA Provide signature of gas contractor on gas riser diagram and indicate the gas tank location on site plan with dimensions per FBC 5th ed.107.2.1/2011 NFPA 58 Ses. 6.3.4.2.. Freodica - | |||
| SW1 | COMPLETE | 07/17/2017 | 07/19/2017 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 07/17/2017 | 07/19/2017 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind | |||
| ZON | HOLD | 07/17/2017 | 07/18/2017 |
| Note: Held By: TAWILLIAMS All windows and doors on rear elevation needs banding. Need right-of-way utilization agreement for paver driveway. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 04/12/2018 |
| REINSPECTION FEE | ¤40.00 | 04/12/2018 |
| REINSPECTION FEE | ¤40.00 | 04/12/2018 |
| REINSPECTION FEE | ¤40.00 | 04/12/2018 |
| REVISION | ¤40.00 | 04/12/2018 |
| SITE PLAN 20 | ¤20.00 | 08/03/2017 |
| SURCHARGE FS 533.721 | ¤17.15 | 08/03/2017 |
| SURCHARGE - FS 468.631 | ¤25.73 | 08/03/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/03/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 08/03/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤712.00 | 08/03/2017 |
| ADMIN FEE | ¤20.00 | 08/03/2017 |
| ELECTRIC FEE | ¤273.60 | 08/03/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 08/03/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 08/03/2017 |
| IMPACT FEE PARKS | ¤849.24 | 08/03/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/03/2017 |
| RECORDING FEE REIMBURSE DOC | ¤52.50 | 08/03/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 08/03/2017 |
| MECHANICAL FEE | ¤273.60 | 08/03/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/03/2017 |
| PLAN CHECK FEE | ¤142.40 | 08/03/2017 |
| PLUMBING FEE | ¤273.60 | 08/03/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,757.50 |