Permit #2017070503

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7029-00430-0070
Block: 00430
Subdivision: 2209 - SECTION 29-ROYAL PALMS
Job Phone: 386-931-1905
Location Address: 91 RYBERRY DR
Type: BA - BUILDING ADDITION
Issue Date: 09/01/2017
NOC: RECORDED
Applicant name: RICHARD JAMES SMITH
Owner: BIONDO JAMES & COLLEEN BRADLEY JTWROS

Address

91 RYBERRY DRIVE

PALM COAST, FL 32164

Lot: 0070
Contracted Stated Job Value: ¤298,000.00
Job Description: GARAGE ADDITION AND INTERIOR ADDITION, REPLACE EXISTING HVAC UNITS, 3.5 TONS, 15 SEER.
Type: CN

Contractor

HAMMOCK COMMUNITIES INC
Status Location Address State License Number Phone
ACTIVE

725 NORTH OCEANSHORE BLVD

FLAGLER BEACH, FL 32136

CGC1516033 (Exp: 08/31/2026) 386-693-4947

Sub Contractors

THEODORE BARRON JOHNSON
Status Location Address State License Number Phone
ACTIVE

PO BOX 479

Flagler Beach, FL 32136

CAC057081 (Exp: 08/31/2026) 386-333-1672
ARTHUR J PASCOE
Status Location Address State License Number Phone
ACTIVE

PO BOX 730007

ORMOND BEACH, FL 32174

EC13007168 (Exp: 08/31/2026) 386-547-6439
DAVID L MILLER
Status Location Address State License Number Phone
CANCEL

170 OLD MOODY BLVD

BUNNELL, FL 32110

CFC1425948 (Exp: 08/31/2022) (386) 439-2169
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
STEVEN S JONES JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1561

ST AUGUSTINE, FL 32084

LQ29804 (Exp: 08/05/2028) 904-829-2709 904-829-3193

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/18/2019 FINAL APPROVED FWILLIS
U -UTILITY RESIDENTIAL FINAL 06/24/2019 FINAL APPROVED LFITZGERALD
TIE BEAM / LINTEL 06/20/2019 APPROVED - AS NOTED DROCKWELL
Note: This inspection was completed by me at an earlier date
ALL ROUGH 06/20/2019 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION/This inspection was completed by me at an earlier date
ELECTRIC FINAL 12/18/2018 APPROVED RMARTIN
FINAL SURVEY (OFFICE USE ONLY) 09/24/2018 APPROVED DREWIS
PLUMBING 2ND ROUGH 07/09/2018 APPROVED - AS NOTED JGIBSON
Note: THIS WAS A TEST FOR SHOWER PAN THAT WAS IN BATHROOM, CHANGED TUB TO A SHOWER
PLUMBING 1ST ROUGH UNDERGROUND 06/29/2018 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 06/25/2018 Disapproved - NO FEE JGIBSON
Note: P3005.2.11 PROHIBITED USE, OF CLEAN-OUT IN GARAGE, P3005.4 DRAIN PIPE SIZING,P2601.2 CONNECTION TO DRAINAGE SYSTEMS,P-3007.1
ALL ROUGH 06/22/2018 PARTIALLY APPROVED DROCKWELL
Note: Kitchen wiring only.Call in 1st rough plumbing for bath
ALL ROUGH 06/14/2018 Disapproved -FEE REQUIRED DROCKWELL
Note: Remove all wiring not being used-back to the panel/Mount all new boxes and prepare wiring/Call in a plumbing 1st rough for shower/Have plans on site at next inspection
ELECTRIC - EARLY POWER 03/07/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED EARLY POWER 10:50
ELECTRIC FINAL 03/05/2018 Disapproved - NO FEE RMARTIN
Note: NEED TO CALL IN AN EARLY POWER INSPECTION TO GET POWER ON TO TEST CKTS FOR FINAL,NEED TO ADD SMOKE DETECTORS IN HOUSE REMODEL, ALSO NEED TO CALL IN ALL ROUGH, STILL OPEN ON PERMIT
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/19/2018 APPROVED - AS NOTED DROCKWELL
Note: Walkway house to garage
ROOF VALLEY & METAL 02/19/2018 APPROVED DROCKWELL
ROW- PRE-APRON (PRE-POUR) 02/06/2018 APPROVED - AS NOTED CTROHA
Note: AS PER OUR DISCUSSION: THE CONRETE NEEDS TO BE ABOUT 3/4" TO 1" ABOVE THE EDGE OF THE ROAD AND CONRETE IS PROHIBITED FROM ENTERING THE ROADWAY
ROW- PRE-APRON (PRE-POUR) 02/02/2018 Disapproved -FEE REQUIRED CTROHA
Note: DRIVEWAY IS NOT FORMED CORRECTLY: FLARES MUST BE A MINIMUM OF 36" AT ROAD EDGE YOU MUST HAVE A 90 DEGREE ANGLE SEE MARKING PAINT CONCRETE IF PROHIBITED FROM ENTERING THE ROADWAY
FOOTER 02/02/2018 APPROVED - AS NOTED DROCKWELL
Note: Breezeway walikway and post footers
INSULATION 01/25/2018 APPROVED DROCKWELL
ALL ROUGH 01/17/2018 PARTIALLY APPROVED DROCKWELL
Note: THIS IS A REINSPECTION/Garage and addition only-existing home later
LATH/BRICK/ WATER BARRIER 12/19/2017 APPROVED - AS NOTED DROCKWELL
Note: THIS IS A REINSPECTION/Call in roof valley metal inspection before roofing
ALL ROUGH 12/18/2017 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION (NOT READY) NOTE: THIS WAS FOR THE NEWE ADDITION AND NEWE GARAGE ONLY, THE WORK INSIDE THE EXISTING HOME WILL NOT BE DONE UNTIL THESE AREAS ARE COMPLETE) NEED RIVISION FOR ADDED AND OMITTED ELECTRIC, AND LOCATION OF PANEL AND METER, PHASE OUT ELECTRIC IN PANEL ALSO MISSING SERVICE FEED FROM METER TO PANEL.. NEC.210.5(C), NAIL PLATES WATER DISTRIBUTION LINES... NAIL PLATES FBC R, P2603.2.1, FIRE PLACE VENT AND CHIMNEY NOT TERMINATED PROPERLY, MISSING SOLAR TUBE PER PLANS, WORKING SPACE FOR CONDENSOR BY DOOR AT ADDITION FBC 26 R, E3405.2, NEED TESTG ON DWV AND DISTRIBUTION PLUMBING 10ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1), AND PRESSURE TEST FOR SUPPLLY LINES P2503.7
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/18/2017 APPROVED WMILLER
Note: THIS IS A REINSPECTION
ALL ROUGH 12/15/2017 Disapproved - NO FEE WMILLER
Note: must pass roof sheathing braces ties downcells prior
WALL SHEATHING 12/15/2017 APPROVED WMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/15/2017 Disapproved -FEE REQUIRED WMILLER
Note: MISSING X-BRACING AS REQUIRED SEE PLANS
FOUND SURVEY APPROVED (OFFICE) 12/07/2017 APPROVED DREWIS
Note: THIS IS A REINSPECTION
FOUND SURVEY APPROVED (OFFICE) 12/01/2017 Disapproved - NO FEE DREWIS
Note: Pleae provide set back measurement from the property line at road. Daniel Rewis 986-4736
LATH/BRICK/ WATER BARRIER 11/01/2017 CANCELLED BY APPLICANT DROCKWELL
MONOLITHIC SLAB 10/18/2017 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 10/17/2017 Disapproved - NO FEE DROCKWELL
Note: THIS IS A REINSPECTION/UFER has been installed..However last nights rain damaged foundation. Do not pour until approved.
MONOLITHIC SLAB 10/16/2017 Disapproved -FEE REQUIRED DROCKWELL
Note: UFER ground to footing steel must be used if available
PLUMBING 1ST ROUGH UNDERGROUND 10/11/2017 APPROVED - AS NOTED JGIBSON
Note: THIS IS A REINSPECTION REVISION NEEDS TO BE SUBMITTED TO PLAN REVIEW FOR APPROVAL BEFORE MONOLITHIC SLAB INSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 10/05/2017 Disapproved -FEE REQUIRED JGIBSON
Note: NEED FILE REVISION TO SHOW RISER DIAGRAM FOR BOTH UTILITY SINKS, FOR WASTE AND VENT NEED TO UNCOVER PIPES P-2503.2, NEED TO HAVE 10' HEAD TEST 2503.5.1 TABLE 3005.1 SANITARY TEES IN WASTE LINES CAN NOT BE USED HORIZONTAL TO VERTICAL, P-2503.4 TESTING BUILDING SEWER NOT TESTED AFTER TIE IN TO EXISTING, AND THERE IS DISCREPANCIES AT CONNECTION OF EXISTING SEWER LINES WHERE FERNCO IS USED, P-2603.4 PIPES THROUGH FOUNDATION WALLS, NOT SLEEVED SHALL BE TWO PIPE SIZES GREATER THAN PIPE PASSING THROUGH, OVER BENDING OF 3'' SANITARY PIPE IN GARAGE AREA THE MAIN TRUNCK LINE

Review History

Department Status Date In Date Out
SW1 COMPLETE 09/24/2018 09/24/2018
Note: Released By: DREWIS FINAL S
ZON COMPLETE 08/06/2018 08/06/2018
Note: Released By: AMOBLEY No gas being installed
ZON HOLD 08/03/2018 08/06/2018
Note: Held By: TDOAK REPEAT COMMENT: Held By: AMOBLEY Please provide the approved site plan showing where tank will be installed with setbacks. Also provide the size of the tank (in gallons) and whether it is above ground or buried.
PLUM CANCEL 06/14/2018 06/20/2018
Note: Customer will use electric stove and not gas. See revision.
ZON HOLD 06/14/2018 06/14/2018
Note: Held By: AMOBLEY Please provide the approved site plan showing where tank will be installed with setbacks
ENGIN1 COMPLETE 01/19/2018 01/19/2018
Note: Released By: TBAKER
ELEC COMPLETE 01/16/2018 01/16/2018
Note: Released By: DREWIS
ELEC HOLD 01/11/2018 01/12/2018
Note: Held By: DREWIS Please depict the correct loacation of the meter and panel, plan shows two. Daniel Rewis 986-4736
SW1 COMPLETE 12/06/2017 12/07/2017
Note: Released By: DREWIS
SW1 HOLD 11/30/2017 12/01/2017
Note: Held By: DREWIS foundation Pleae provide set back measurement from the property line at road. Daniel Rewis 986-4736
BLD COMPLETE 11/17/2017 11/28/2017
Note: Released By: JHINDMAN
PLUM COMPLETE 10/11/2017 10/17/2017
Note: Released By: FREODICA Revision: Connected sanitary line of utility sink at game room to existing sanitary.
PLUM COMPLETE 08/25/2017 08/25/2017
Note: Released By: FREODICA
ZON COMPLETE 08/22/2017 08/23/2017
Note: Released By: TAWILLIAMS
MECH COMPLETE 08/22/2017 08/25/2017
Note: Released By: FREODICA
MECH HOLD 08/07/2017 08/18/2017
Note: Held By: FREODICA 1. Provide signature and license number of hvac contractor on hvac plan per FBC 5th ed. 105.3.1.2.. 2. Provide signature of builder on Energy Performace Level (EPL) display card per FBCEC 5th ed. R401.3. 3. Clarify if existing hvac units would be replaced per FBC 5th 3e. 107.2.1. F.Reodica -386-986-4734.
ZON HOLD 08/07/2017 08/07/2017
Note: Held By: AMOBLEY pending paperwork and the easement to be released before zoning can release the hold
ELEC COMPLETE 08/07/2017 08/17/2017
Note: Released By: JHINDMAN
BLD COMPLETE 07/26/2017 07/26/2017
Note: Released By: FREODICA
ELEC HOLD 07/24/2017 07/25/2017
Note: Held By: JHINDMAN 1. Provide electrical load calculations. 2011 nec art.220. 2. Identify if new service is to feed addition for the existing house or is it only for the garage. Where a building or structure is supplied by more than one service, or a combination of branch circuits, feeders, and services, a permanent plaque or directory must be installed at each service, feeder, or branch circuit disconnect location denoting all other services, feeders, and branch circuits supplying that building or structure and the area served by each. 2011 NEC 230.1e. 3.Provide disconnects at the Air Handlers 2011 NEC 422. J. Hindman 986-3784.
BLD HOLD 07/18/2017 07/25/2017
Note: Held By: FREODICA Apply two (2) separate permits . One(1) for garage and one(1) for building addition per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734.
SW1 COMPLETE 07/18/2017 07/24/2017
Note: Released By: JHINDMAN
ZON HOLD 07/18/2017 07/18/2017
Note: Held By: AMOBLEY Owners will have to sign a termination of easement agreement and get all required documents for approval

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤40.00 09/11/2019
REINSPECTION FEE ¤40.00 09/11/2019
REINSPECTION FEE ¤40.00 09/11/2019
REINSPECTION FEE ¤40.00 09/11/2019
REINSPECTION FEE ¤40.00 09/11/2019
REINSPECTION FEE ¤40.00 09/11/2019
REINSPECTION FEE ¤40.00 09/11/2019
REVISION ¤40.00 09/11/2019
REVISION ¤40.00 09/11/2019
REVISION ¤40.00 09/11/2019
SITE PLAN 20 ¤20.00 09/01/2017
SURCHARGE FS 533.721 ¤9.95 09/01/2017
SURCHARGE - FS 468.631 ¤14.92 09/01/2017
STORM WATER PERMIT FEES ¤80.00 09/01/2017
ADMIN FEE ¤20.00 09/01/2017
REMODEL/ADDITION/ACCES INSPECT ¤119.20 09/01/2017
ELECTRIC FEE ¤238.80 09/01/2017
RECORDING FEE REIMBURSE DOC ¤35.50 09/01/2017
MECHANICAL FEE ¤238.80 09/01/2017
PLAN CHECK FEE ¤119.20 09/01/2017
PLUMBING FEE ¤238.80 09/01/2017
Fees Total Due: ¤0.00 Total Paid: ¤1,535.17