I want to search for...
Permit #2017070666
Permit Details
Status: FINAL
| Parcel Id: 02-11-30-0000-01010-0032 |
| Block: 01010 |
| Subdivision: 2193 - SECTION 11-BELLE TERRE |
| Job Phone: 402-934-7911 |
| Location Address: 5435 BELLE TERRE PKWY |
| Type: CGA - COMMERCIAL GAS |
| Issue Date: 01/18/2018 |
| NOC: Unknown |
| Applicant name: DOUG YOUMANS |
| Owner: PALM COAST BAPTIST CHURCH INC |
|
Address P O BOX 352415 PALM COAST, FL 32135 |
| Lot: 0032 |
| Contracted Stated Job Value: ¤650.00 |
| Job Description: RUN PIPE TO 90,000 BTU COOKTOP AND 200,000 BTU TA |
| Type: CN |
Contractor
FERRELL GAS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
6300 EDGEWATER DRIVE , |
0601 (Exp: 07/17/2022) | 402-934-7911 |
Inspection History
| Type | Request Date | Result | Inspector |
| LDSC- LANDSCAPE FINAL | 10/22/2019 | APPROVED | BDAWSON |
| Note: THIS IS A REINSPECTION | |||
| GAS FINAL | 04/24/2019 | APPROVED - AS NOTED | JGIBSON |
| Note: ALREADY APPROVED ON 7/10/18 LANDSCAPE FINAL WAS ONLY NEEDED | |||
| LDSC- LANDSCAPE FINAL | 04/24/2019 | Disapproved - NO FEE | BDAWSON |
| Note: Remove excess materials sitting on tree rootball. Remove piles of excess dirt and provide 2-4" layer of mulch over disturbed areas. | |||
| GAS FINAL | 07/10/2018 | APPROVED - AS NOTED | JGIBSON |
| Note: STILL NEED LANDSCAPE FINAL | |||
| GAS ROUGH | 07/03/2018 | APPROVED | JGIBSON |
| Note: | |||
| GAS ROUGH | 06/27/2018 | CANCELLED BY APPLICANT | JGIBSON |
| Note: SPOKE WITH TONYA AT FERELL GAS TO RESCHEDUAL HAS FAILED 3 TIMES FOR NO ACCESS AND NO PERMIT OR PAPER WORK | |||
| GAS ROUGH | 04/26/2018 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NO PERMIT OR RISER FOR INSPECTION | |||
| GAS ROUGH | 02/22/2018 | Disapproved - NO FEE | JGIBSON |
| Note: THIS IS A REINSPECTION DOOR LOCKED SITE MARKERS NOT IN FOR CHECKING DEEPTH | |||
| GAS ROUGH | 01/26/2018 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NO PLANS PERMIT OR RISER FOR GAS INSTALLATION |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 01/08/2018 | 01/09/2018 |
| Note: Released By: JGONZALEZ | |||
| PLLA | COMPLETE | 10/27/2017 | 11/06/2017 |
| Note: Released By: WBUTLER | |||
| ZON | HOLD | 10/27/2017 | 10/27/2017 |
| Note: Held By: JGONZALEZ Provide information regarding fencing shown around ag tank. Show Height, type and color. | |||
| PLLA | HOLD | 07/28/2017 | 07/31/2017 |
| Note: Held By: WBUTLER 7/31/17 WMB 1) Is tank to be buried or is it above ground? If above ground it requires screening with shrubs a minimum of 30" tall at time of planting and 7-gallon container spaced at 4' on center minimum. 2) Cannot place this tank in the required vehicular use area island. Need to find another location for the tank. 3) Specify on the plans that all disturbed areas must be restored to their original condition or better. | |||
| ENGIN1 | CANCEL | 07/28/2017 | 08/24/2017 |
| ZON | HOLD | 07/27/2017 | 07/28/2017 |
| Note: Held By: JGONZALEZ Revise a site plan to show the location of the tank in reference to parking lot and which landscaping island is the tank being placed include the setbacks and dimensions of tank. Emailed a copy of site plan to SAMANTHACHORON@FERRELLGAS.COM and left voice mail message regarding hold. 7/28/17jg Provide information regarding screening of purposed aboved tank. | |||
| PLUM | COMPLETE | 07/27/2017 | 08/10/2017 |
| Note: Released By: RLEE | |||
| ZON | HOLD | 07/20/2017 | 07/20/2017 |
| Note: Held By: JGONZALEZ Revise a site plan to show the location of the tank in reference to parking lot and which landscaping island is the tank being placed include the setbacks and dimensions of tank. Contact zoning department 386-986-3751 for site plan. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EXTENSION | ¤40.00 | 04/23/2019 |
| REINSPECTION FEE | ¤40.00 | 05/17/2018 |
| REINSPECTION FEE | ¤40.00 | 02/22/2018 |
| SITE PLAN 20 | ¤20.00 | 01/18/2018 |
| SURCHARGE FS 533.721 | ¤2.40 | 01/18/2018 |
| SURCHARGE - FS 468.631 | ¤3.61 | 01/18/2018 |
| GAS PIPING | ¤40.00 | 01/18/2018 |
| PLAN CHECK FEE | ¤100.00 | 01/18/2018 |
| ADMIN COMMERCIAL | ¤60.00 | 01/18/2018 |
| ELECTRIC FEE | ¤60.39 | 01/18/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤406.40 |