Permit #2017080147
Permit Details
Status: COED
| Parcel Id: 20-12-31-2950-00000-0110 |
| CONDITIONED SPACE: 3078 sqft |
| GARAGE: 1142 sqft |
| OPENED PORCH (WITH ROOF) : 319 sqft |
| OPENED PORCH (WITH ROOF) : 76 sqft |
| Total Square Footage: 4615 sqft |
| Block: 00000 |
| Subdivision: 2133 - GRAND LANDINGS - PHASE 1 |
| Job Phone: 386-931-2568 |
| Location Address: 107 VIREO DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/25/2017 |
| NOC: RECORDED |
| Applicant name: PETER JOSEPH LYDEN |
| Owner: MCGLASEN, MICHAEL & LONNIE |
|
Address 18 PRINCESS KATHLEEN LANE PALM COAST, FL 32164 |
| Lot: 0110 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DEL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1009 BUNNELL, FL 32110 |
CBC1253392 (Exp: 08/31/2024) | 386-931-2568 |
Sub Contractors
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
JOHN ROBERT BLEVINS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
17 PORWYN LANE PALM COAST, FL 32164 |
CAC1816125 (Exp: 08/31/2026) | 386-585-8283 | 386-263-2096 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1009 BUNNELL, FL 32110 |
CBC1253392 (Exp: 08/31/2024) | 386-931-2568 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/20/2018 | FINAL APPROVED | CMINI |
| ROW - FINAL INSPECTION | 06/20/2018 | FINAL APPROVED | CTROHA |
| Note: WORK COMPLETED | |||
| U -UTILITY RESIDENTIAL FINAL | 06/18/2018 | FINAL APPROVED | MBACON |
| Note: Please contact me regarding curb markings for utilitites. Curb markings are missing in areas where miami gutter was repaired/replaced. | |||
| ROW - FINAL INSPECTION | 06/18/2018 | Disapproved -FEE REQUIRED | CTROHA |
| Note: REPAIR THE EROSION FROM THE HOUSE TO THE BORROW PIT ESPECIALLY WHERE THS GUTTER DOWNSPOUTS ARE LOCATED REMOVE AND REPLACE BROKE MIAMI CURB TO THE LEFT OF THE DRIVEWAY | |||
| U-CROSS CONNECTION | 06/18/2018 | APPROVED | MBACON |
| ROW - FINAL APRON (AFTER POUR) | 06/18/2018 | APPROVED | CTROHA |
| FINAL SURVEY (OFFICE USE ONLY) | 06/14/2018 | APPROVED | JHINDMAN |
| GRAVITY SEWER TEST | 05/31/2018 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS CALLED IN UNDER A SEWER SERVCE INSPECTION ON 3/23/18 AND APPROVED BY J GIBSON | |||
| PROJECT STATUS (OFFICE USE) | 05/24/2018 | CANCELLED BY INSPECTOR | CTROHA |
| ROW- PAVER RESTRAINTS | 05/24/2018 | APPROVED | CTROHA |
| ROW - FINAL INSPECTION | 05/21/2018 | Disapproved -FEE REQUIRED | CTROHA |
| Note: YOU NEED TO HAVE AN APPROVED FINAL SURVEY ON SITE AND 100% JOB COMPLETTION FOR THIS INSPECTION PROPRTY NOT SODDED | |||
| ROW - FINAL APRON (AFTER POUR) | 05/16/2018 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC - EARLY POWER | 05/16/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 11:15 | |||
| ROW- PAVER RESTRAINTS | 05/11/2018 | APPROVED - AS NOTED | KHOWELL |
| Note: EDGE RESTRAINTS ALL DUG OUT, RAIN FORCASTED STARTING SUNDAY THRU ALL NEXT WEEK | |||
| ROW - FINAL APRON (AFTER POUR) | 05/10/2018 | CANCELLED BY APPLICANT | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 05/02/2018 | APPROVED - AS NOTED | CTROHA |
| Note: I RECCOMMEND THE MIAMI CURBING BE REPLACED BEFORE PAVERS ARE PLACED THEN READY FOR PAVERS | |||
| ROW- PROJECT STATUS | 05/02/2018 | CANCELLED BY INSPECTOR | CTROHA |
| Note: WRONG INSPECTION CALLED IN THIS IS FOR CITY PERSONEL USE ONLY | |||
| ROW- PRE-APRON (PRE-POUR) | 04/18/2018 | PARTIALLY APPROVED | CTROHA |
| Note: READY FOR BASE SEE PHOTOS OF MIAMI CURB I RECCOMMEND YOU REPAIR THIS SECTION BEFORE LAYING PAVERS ALSO SEE MARKING PAINT ON SITE | |||
| U - SEWER TIE IN | 04/06/2018 | APPROVED | MBACON |
| Note: THIS IS A REINSPECTION | |||
| U - SEWER TIE IN | 03/23/2018 | CANCELLED BY APPLICANT | MBACON |
| Note: Hole is wet and sewer tie in is not visible spoke to RJ carter plumbing they will meet me on monday to expose. | |||
| U-GRAVITY SEWER INSTALL/TESTING | 03/23/2018 | APPROVED | MBACON |
| Note: N/A | |||
| SEWER SERVICE | 03/23/2018 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 02/07/2018 | APPROVED | DROCKWELL |
| INSULATION | 01/29/2018 | APPROVED | DROCKWELL |
| PLUMBING 2ND ROUGH | 01/22/2018 | CANCELLED BY INSPECTOR | JGIBSON |
| Note: THIS INSPECTION IS PART OF THE ALL-ROUGH | |||
| ALL ROUGH | 01/22/2018 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/22/2018 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ELECTRIC-TUG | 01/16/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: THIS IS A REINSPECTION SPOKE TO SUSAN FPL RELEASED TUG 11:30 | |||
| ROOF VALLEY & METAL | 01/03/2018 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/20/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Structural connections not completed.OK to dry-in only | |||
| ELECTRIC-TUG | 12/14/2017 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: APPROVED ELECTRIC RISER DIAGRAM DOES NOT MATCH SERVICE INSTALLED, NEED REVISION ON THE UPGRADED SERVICE | |||
| TIE BEAM / LINTEL | 11/20/2017 | APPROVED | DROCKWELL |
| FOUND SURVEY APPROVED (OFFICE) | 11/09/2017 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 10/12/2017 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/04/2017 | APPROVED | JGIBSON |
| ROW- PROJECT STATUS | 08/31/2017 | APPROVED | CTROHA |
| Note: I WAS CONTACTED WITH A COMPLAINT ABOUT THIS ADDRESS CLEARING INTO THE CONSERVATION AREA AT THE REAR OF THE PROPERTY. I MET THE CONTRACTOR ON SITE AND REVIEWED THE SITE PLANS WHICH SHOWED THE PROPERTY BOUNDRIES AND A PROPOSED BORROW PIT TO THE REAR OF THE PROPERTY. I CHECKED TO MAKE SURE THE PROPOSED SITE PLAN MATCHED THE ONE WE HAVE ON FILE. TO THE BEST OF MY KNOWLEDGE AFTER CHECKING THE PROPERTY STAKES THE CONTRACTOR IS CLEARING THE PROPERTY WITHIN THE PROPERTY BOUNDRIES |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 06/13/2018 | 06/14/2018 |
| Note: Released By: JHINDMAN final s | |||
| ZON | COMPLETE | 04/09/2018 | 04/09/2018 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 04/09/2018 | 04/16/2018 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 04/09/2018 | 04/09/2018 |
| Note: Released By: AMOBLEY | |||
| UTL | COMPLETE | 04/09/2018 | 04/10/2018 |
| Note: Released By: MBACON | |||
| ZON | HOLD | 04/02/2018 | 04/03/2018 |
| Note: Held By: AMOBLEY Please provide a copy of the approval letter from the ARB | |||
| ZON | HOLD | 03/23/2018 | 03/23/2018 |
| Note: Held By: AMOBLEY Revised driveway exceeds what the city would allow please provide a copy of the ARB approval for this change | |||
| UD1 | COMPLETE | 03/23/2018 | 03/26/2018 |
| Note: Released By: MBACON All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA clear zone for a hydrant is 3 feet from both sides and 3 feet behind the hydrant. Front of hydrant shall remain completely clear. | |||
| ENGIN1 | COMPLETE | 03/23/2018 | 03/26/2018 |
| Note: Released By: TBAKER | |||
| BLD | COMPLETE | 01/08/2018 | 01/08/2018 |
| Note: Released By: RLEE | |||
| ELEC | COMPLETE | 01/08/2018 | 01/10/2018 |
| Note: Released By: DREWIS | |||
| SW1 | COMPLETE | 11/07/2017 | 11/09/2017 |
| Note: Released By: DREWIS foundation s | |||
| MECH | COMPLETE | 08/24/2017 | 08/24/2017 |
| Note: Released By: FREODICA | |||
| ZON | COMPLETE | 08/18/2017 | 08/18/2017 |
| Note: Released By: AMOBLEY | |||
| MECH | HOLD | 08/18/2017 | 08/23/2017 |
| Note: Held By: FREODICA Provide revised complete package of energy calculations which includes heating /cooling loads and hvac plan same as the original submittal per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| URB | COMPLETE | 08/07/2017 | 08/09/2017 |
| Note: Released By: JBEAUDET | |||
| BLD | COMPLETE | 08/04/2017 | 08/17/2017 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 08/04/2017 | 08/16/2017 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 08/04/2017 | 08/04/2017 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 08/04/2017 | 08/17/2017 |
| Note: Held By: FREODICA The insulation R-value for exterior wood frame wall shown on energy calcualations (item 9b) shall comply with FBCEC 5th ed. Table R402.1.1.. | |||
| PLUM | COMPLETE | 08/04/2017 | 08/16/2017 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 08/04/2017 | 08/16/2017 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 08/04/2017 | 08/08/2017 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| ZON | HOLD | 08/04/2017 | 08/07/2017 |
| Note: Held By: AMOBLEY Must have at least four shrubs along each side of house Please specify sod type and if irrigation will be installed |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 06/21/2018 |
| REINSPECTION FEE | ¤40.00 | 06/21/2018 |
| REINSPECTION FEE | ¤40.00 | 06/21/2018 |
| REINSPECTION FEE | ¤40.00 | 06/21/2018 |
| REVISION | ¤40.00 | 06/21/2018 |
| SITE PLAN 20 | ¤20.00 | 08/25/2017 |
| SURCHARGE FS 533.721 | ¤19.21 | 08/25/2017 |
| SURCHARGE - FS 468.631 | ¤28.82 | 08/25/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 08/25/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 08/25/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤810.00 | 08/25/2017 |
| ADMIN FEE | ¤20.00 | 08/25/2017 |
| ELECTRIC FEE | ¤303.00 | 08/25/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 08/25/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 08/25/2017 |
| IMPACT FEE PARKS | ¤849.24 | 08/25/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/25/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 08/25/2017 |
| MECHANICAL FEE | ¤303.00 | 08/25/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 08/25/2017 |
| PLAN CHECK FEE | ¤162.00 | 08/25/2017 |
| PLUMBING FEE | ¤303.00 | 08/25/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,915.95 |