I want to search for...

Permit #2017080259

Permit Details

Status: COED

Parcel Id: 07-11-31-7023-00480-0120
CONDITIONED SPACE: 1959 sqft
GARAGE: 750 sqft
OPENED PORCH (WITH ROOF) : 470 sqft
OPENED PORCH (WITH ROOF) : 40 sqft
Total Square Footage: 3219 sqft
Block: 00480
Subdivision: 2191 - SECTION 23-WYNNFIELD
Job Phone: 386-931-1725
Location Address: 26 WHITE DOVE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/10/2017
NOC: RECORDED
Applicant name: JOSEPH ALEIXO PORTAL
Owner: CLARKE JOHN M & JOANNE H&W

Address

1220 W SORRENTO DRIVE

CITRUS SPRINGS, FL 34434

Lot: 0120
Contracted Stated Job Value: ¤140,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SWEETWATER CUSTOM HOMES INC.
Status Location Address State License Number Phone Fax
INACTIVE

1105 LAMBERT AVENUE

FLAGLER BEACH, FL 32136

CBC1252965 (Exp: 08/31/2024) 386-931-1725 386-439-4676

Sub Contractors

CHARLES K DAVIS
Status Location Address State License Number Phone
ACTIVE

3000 E MOODY BLVD BLDG 2

BUNNELL , FL 32110

EC13004270 (Exp: 08/31/2026) 386-931-6614
JOHN ROBERT BLEVINS JR
Status Location Address State License Number Phone Fax
ACTIVE

17 PORWYN LANE

PALM COAST, FL 32164

CAC1816125 (Exp: 08/31/2026) 386-585-8283 386-263-2096
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
JAMES ALLEN TAYLOR
Status Location Address State License Number Phone Fax
CANCEL

265 TYMBER CREEK ROAD

ORMOND BEACH, FL 32174

CCC1326819 (Exp: 08/31/2022) (386)290-0281 (386)673-5216

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/29/2018 APPROVED MWILLIAMS
U -UTILITY RESIDENTIAL FINAL 11/29/2018 FINAL APPROVED LFITZGERALD
ROW - FINAL INSPECTION 11/27/2018 FINAL APPROVED KHOWELL
ROW - FINAL APRON (AFTER POUR) 11/27/2018 APPROVED KHOWELL
ROW - FINAL APRON (AFTER POUR) 11/14/2018 Disapproved -FEE REQUIRED KHOWELL
Note: THERE ARE NO FOTTERS POURED AT THE ENDS OF THE MITERED END SECTIONS, A PRE-POUR INSPECTION WILL BE ADDED BACK TO INSPECTION DOC'S
FINAL SURVEY (OFFICE USE ONLY) 11/05/2018 APPROVED DREWIS
ROW - DRAINAGE 10/17/2018 APPROVED CTROHA
Note: I DID A FIELD INSPECTION OF THE SWALE AND I MET WITH PHIL ON SITE I DROPPED THE ELEVATION ON THE RIGHT SIDE PROPERTY LINE TO 25.90
ROW- PRE-APRON (PRE-POUR) 08/22/2018 APPROVED RGROSS
Note: READY TO POUR
ELECTRIC - EARLY POWER 08/22/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 11:00
ROW- PRE-APRON (PRE-POUR) 08/10/2018 Disapproved -FEE REQUIRED CTROHA
Note: 27' PROPOSED DRIVEWAY ACTUAL IS 28' NEED TO REVISE SITE PLAN OR BUILD TO PROPOSED
ROW- PRE-APRON (PRE-POUR) 08/09/2018 Disapproved -FEE REQUIRED KHOWELL
Note: 1. STRAIGHTEN OUT THE PIPE MITERS 2. MITERED END SETIONS NOT FORMED PER CITY STANDARD DETAIL 3. COMPACT PAD AREA 4. SITE PLAN CALLS OUT 27' DRIVEWAY IT IS FORMED AT 28'-6" 5. NEED A MINIMUM OF 6" FROM THE EDGE OF DRIVEWAY TO THE CULVERT OPENING 6. CONCRETE IS NOT ALLOWED TO BE POURED PAST THE END OF FORM BOARDS ON END OF CULVERT INTO THE SWALE AREA
U - SEWER TIE IN 07/25/2018 APPROVED LFITZGERALD
GRAVITY SEWER TEST 07/25/2018 APPROVED JGIBSON
LATH/BRICK/ WATER BARRIER 05/18/2018 APPROVED WMILLER
INSULATION 05/09/2018 APPROVED WMILLER
Note: DEFICIENCIES NOTED PRIOR BY INSPECTOR JC RESOLVED
INSULATION 05/08/2018 Disapproved -FEE REQUIRED JCOLASANTI
Note: THE water supply system or a section of it, the system or portion completed shall be tested and proved tight under a water pressure of not less 50psi for not less than 15min.FBC2503.7
ROOF VALLEY & METAL 04/25/2018 APPROVED JCOLASANTI
ALL ROUGH 04/24/2018 APPROVED - AS NOTED JCOLASANTI
Note: need presure on water line.....seal HVAC chase (check at insulation
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/18/2018 APPROVED WMILLER
ALL ROUGH 04/03/2018 Disapproved - NO FEE WMILLER
Note: must pass roof sheathing braces ties downcells prior
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/03/2018 Disapproved -FEE REQUIRED WMILLER
Note: 1. POST TO BEAM ON BACK PORCH CALLS FOR 2 SIMPSON 42 2. LOOSE SHEATHING A9SEE HIGHLIGHTED ON ENGENEERING TRUSS LAYOUT) 3. TRUSS BLOCKING REQUIRED WHERE SHEATHING SPANS MORE THAN 24 inches. (PER MANUFACTURER SPECS ON ENGINEERED SHEATHING) (OR SUPPLY MANUFACTURER SPECS FOR APPLICATION USED) 4. CONTINUOUS LOAD PATH 26 R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH 5. ADDITIONAL STRAPPING AS REQUIRED FOR MULTI MEMBER GIRDERS 6. STRAPS AS REQUIRED PER BEARING WALL DETAIL
TIE BEAM / LINTEL 01/17/2018 APPROVED JCOLASANTI
FOUND SURVEY APPROVED (OFFICE) 01/16/2018 APPROVED DREWIS
MONOLITHIC SLAB 12/12/2017 APPROVED JCOLASANTI
Note: per contractor
PRE-POUR 12/11/2017 CANCELLED BY INSPECTOR CMINI
Note: this is not a required inspection, need to call what was issued.
PLUMBING 1ST ROUGH UNDERGROUND 12/05/2017 APPROVED JGIBSON

Review History

Department Status Date In Date Out
SW1 COMPLETE 11/01/2018 11/05/2018
Note: Released By: DREWIS Final S
ENGIN1 COMPLETE 08/13/2018 08/14/2018
Note: Released By: TBAKER
SW1 COMPLETE 08/13/2018 08/13/2018
Note: Released By: DREWIS
UD1 COMPLETE 08/10/2018 08/17/2018
Note: Released By: MBACON
ZON COMPLETE 08/10/2018 08/13/2018
Note: Released By: AMOBLEY
BLD COMPLETE 08/03/2018 08/07/2018
Note: Released By: JHINDMAN
ZON COMPLETE 08/03/2018 08/06/2018
Note: Released By: AMOBLEY
SW1 COMPLETE 06/27/2018 07/02/2018
Note: Released By: DREWIS
ELEC COMPLETE 03/28/2018 03/28/2018
Note: Released By: DREWIS
SW1 COMPLETE 01/12/2018 01/16/2018
Note: Released By: DREWIS foundation s
BLD COMPLETE 12/04/2017 12/08/2017
Note: Released By: JHINDMAN
ELEC COMPLETE 12/04/2017 12/08/2017
Note: Released By: DREWIS
ZON COMPLETE 10/06/2017 10/09/2017
Note: Released By: TAWILLIAMS
UD1 COMPLETE 10/04/2017 10/09/2017
Note: Released By: MBACON This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON HOLD 10/04/2017 10/05/2017
Note: Held By: TAWILLIAMS 1) Landscaping plan needs to show existing trees on natural area (please make sure it states type of trees) 2) Need termination of easement packet
MECH COMPLETE 10/04/2017 10/09/2017
Note: Released By: FREODICA
BLD COMPLETE 10/04/2017 10/04/2017
Note: Released By: JHINDMAN
ZON HOLD 09/27/2017 09/29/2017
Note: Held By: TAWILLIAMS Repeat Comments 1. Floor plan calculation table should show entry square footage and the total 2. Right side of house should have banding around windows...It will be highly visible from road 3. Please provide a new survey with all easements including the easement they are terminating with the proposed structure 4. Permit will be pending until all paperwork is done and easement is released
UD1 HOLD 09/27/2017 09/29/2017
Note: Held By: MBACON PEP Panel is not shown on the same side as the tank in the electrical plan as the utility marked site plans. Submit a new electrical plan showing PEP Panel on the same side of the building as indicated in the Utility marked site plan.
ELEC COMPLETE 09/27/2017 09/28/2017
Note: Released By: DREWIS Informational note: Please provide panel riser diagram for future permits.
MECH HOLD 09/27/2017 09/29/2017
Note: Held By: FREODICA Repeat comment on item 1: 1. Total cooling capacity of selected hvac units shall not be less than the calculated total cooling load per FBCEC 5th ed. R403.6.1.1. Note: Calculated cooling load = 37,601 Btu/hr Capacity of hvac unit = 35,615 Btu/hr,
BLD COMPLETE 08/08/2017 08/17/2017
Note: Released By: RLEE
ELEC HOLD 08/08/2017 08/17/2017
Note: Held By: RLEE Released By: RLEE Provide calculations that pertain to the house. Wrong calculations provided. Contractor signing calcualtions is not contractor provided for work. Must be same.
ENGIN1 COMPLETE 08/08/2017 08/22/2017
Note: Released By: TBAKER
MECH HOLD 08/08/2017 08/17/2017
Note: Held By: FREODICA 1. Total cooling capacity of selected hvac units shall not be less than the calculated total cooling load per FBCEC 5th ed. R403.6.1.1. 2. Energy calculations page i of 6 shall be signed by owner/agent per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734.
PLUM COMPLETE 08/08/2017 08/17/2017
Note: Released By: FREODICA
SW1 COMPLETE 08/08/2017 08/17/2017
Note: Released By: RLEE
UD1 HOLD 08/08/2017 08/14/2017
Note: Held By: MBACON PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
ZON HOLD 08/08/2017 08/08/2017
Note: Held By: AMOBLEY 1. Must have at least four shrubs along each side of house 2. Floor plan calculation table should show entry square footage and the total 3. Right side of house should have banding around windows...It will be highly visible from road 4. Please provide a color swatch of exterior house color 5. Please provide a new survey with all easements including the easement they are terminating with the proposed structure 6. Permit will be pending until all paperwork is done and easement is released

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
RECORDING FEE REIMBURSE DOC ¤35.50 11/30/2018
REVISION ¤40.00 11/30/2018
REVISION ¤40.00 11/30/2018
REVISION ¤40.00 11/30/2018
REVISION ¤40.00 11/30/2018
REINSPECTION FEE ¤40.00 11/30/2018
REINSPECTION FEE ¤40.00 11/30/2018
REINSPECTION FEE ¤40.00 11/30/2018
REINSPECTION FEE ¤40.00 11/30/2018
REINSPECTION FEE ¤40.00 11/30/2018
NEW RESIDENTIAL INSPECTIONS ¤540.00 10/10/2017
SITE PLAN 20 ¤20.00 10/10/2017
SURCHARGE FS 533.721 ¤13.54 10/10/2017
SURCHARGE - FS 468.631 ¤20.31 10/10/2017
STORM WATER PERMIT FEES ¤80.00 10/10/2017
IMPACT FEE TRANSPORTATION ¤3,124.67 10/10/2017
MECHANICAL FEE ¤222.00 10/10/2017
PLAN CHECK FEE ¤108.00 10/10/2017
PLUMBING FEE ¤222.00 10/10/2017
ADMIN FEE ¤20.00 10/10/2017
ELECTRIC FEE ¤222.00 10/10/2017
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 10/10/2017
IMPACT FEE PARKS ¤849.24 10/10/2017
IMPACT FEE SCHOOL ¤3,600.00 10/10/2017
Fees Total Due: ¤0.00 Total Paid: ¤9,656.05