I want to search for...

Permit #2017080659

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00030-0030
CONDITIONED SPACE: 2688 sqft
GARAGE: 698 sqft
OPENED PORCH (WITH ROOF) : 66 sqft
OPENED PORCH (WITH ROOF) : 195 sqft
Total Square Footage: 3647 sqft
Block: 00030
Subdivision: 2108 - Hidden Lakes- Phase II-Toscana
Job Phone: 863-420-2100
Location Address: 4 NEW OAK LEAF DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/06/2017
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0030
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113

Inspection History

Type Request Date Result Inspector
GAS FINAL 07/17/2018 APPROVED CMINI
BLD - BUILDING FINAL 07/17/2018 FINAL APPROVED CMINI
GAS FINAL 07/16/2018 Disapproved - NO FEE WMILLER
Note: TEST PRESSURE NEEDED ON PIPE FBC.G2417, RE-TAG FOR PRESSURE APPLIED AFTER PRESSURE IS APPLIED
BLD - BUILDING FINAL 07/16/2018 Disapproved -FEE REQUIRED WMILLER
Note: VENT STACKS/PIPES FBC, R, P3103.1 MUST TERMINATE NOT LESS THAN 6 INCHES ABOVE THE ROOF ALSO MUST PASS GAS ROUGH PRIOR
GAS FINAL 07/13/2018 CANCELLED BY APPLICANT WMILLER
Note: cancelled per Mason Moore waiting on Plumbing revision
BLD - BUILDING FINAL 07/13/2018 CANCELLED BY APPLICANT WMILLER
Note: cancelled per Mason Moore waiting on Plumbing revision
GAS FINAL 07/06/2018 Disapproved -FEE REQUIRED JGIBSON
Note: NO GAS TANK ON SITE, NO GAS TIED TO HOUSE
U-CROSS CONNECTION 06/28/2018 APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 06/28/2018 APPROVED KHOWELL
ROW - FINAL INSPECTION 06/28/2018 FINAL APPROVED KHOWELL
U -UTILITY RESIDENTIAL FINAL 06/28/2018 FINAL APPROVED LFITZGERALD
FINAL SURVEY (OFFICE USE ONLY) 06/25/2018 APPROVED DREWIS
ELECTRIC - EARLY POWER 06/18/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 2:50
ROW- PRE-APRON (PRE-POUR) 06/13/2018 APPROVED KHOWELL
ROW- PRE-APRON (PRE-POUR) 06/08/2018 PARTIALLY APPROVED RGROSS
Note: APPROVED FOR CONCRETE APRON AND SIDEWALK POUR ONLY. PAVER DRIVEWAY
TUB SET 05/29/2018 APPROVED JGIBSON
GRAVITY SEWER TEST 05/02/2018 APPROVED JGIBSON
U - SEWER TIE IN 05/02/2018 APPROVED LFITZGERALD
INSULATION 04/18/2018 APPROVED CMINI
LATH/BRICK/ WATER BARRIER 04/18/2018 APPROVED CMINI
ELECTRIC-TUG 04/16/2018 APPROVED - AS NOTED RMARTIN
Note: spoke to fpl released tug 3:10
GAS ROUGH 04/16/2018 APPROVED - AS NOTED JGIBSON
Note: need to list all sub-contractors for permit
GAS ROUGH 04/13/2018 Disapproved -FEE REQUIRED CMINI
Note: missing gas riser diagrahm. FBC 105.1
ELECTRIC-TUG 04/13/2018 Disapproved -FEE REQUIRED CMINI
Note: tug outlet not GFCI protected/ not complete
ALL ROUGH 04/13/2018 APPROVED - AS NOTED CMINI
Note: fireblocking missing, check all. also fireblock needs to be 3/4" thick. FBC 302electric boxes not complete in garage. check on insulation
ROOF VALLEY & METAL 04/12/2018 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/11/2018 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/09/2018 Disapproved -FEE REQUIRED CMINI
Note: mid mitered wall truss straps in wrong location, master bd.rm. exterior top wall plate missing straps
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/06/2018 Disapproved -FEE REQUIRED CMINI
Note: missing straps on wood midwall all trusses. missing straps at top of stud walls in master bath and bed rooms. check all post missing straps at top to girders
GAS ROUGH 04/06/2018 Disapproved -FEE REQUIRED JGIBSON
Note: need riser non on site
ROOF SHEATHING 01/29/2018 APPROVED CMINI
TIE BEAM / LINTEL 12/27/2017 APPROVED WMILLER
FOUND SURVEY APPROVED (OFFICE) 12/22/2017 APPROVED JHINDMAN
MONOLITHIC SLAB 12/14/2017 APPROVED CMINI
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 12/12/2017 CANCELLED BY APPLICANT CMINI
PLUMBING 1ST ROUGH UNDERGROUND 12/06/2017 APPROVED - AS NOTED JGIBSON
Note: NEED TO LIST ALL SUB-CONTRACTORS OF RECORD FOR PERMIT BEFORE MONOLITHIC SLAB INSPECTION
FOOTER 10/18/2017 APPROVED CMINI
Note: THIS IS A REINSPECTION
FOOTER 10/17/2017 Disapproved -FEE REQUIRED CMINI
Note: need to clean out footings, lots of cave ins
FOOTER 10/16/2017 CANCELLED BY APPLICANT AIRS WEB

Review History

Department Status Date In Date Out
PLUM COMPLETE 07/12/2018 07/13/2018
Note: Released By: JHINDMAN
PLUM HOLD 07/09/2018 07/12/2018
Note: Held By: JHINDMAN 1. The proposed underground tank must be a minimum of 10 feet away from the house and 10 feet from the property line per nfpa58. J. Hindman 986-3784. Also need to address if previous revision was cancelled. J. Hindman 986-3784.
SW1 COMPLETE 06/22/2018 06/25/2018
Note: Released By: DREWIS final s
PLUM HOLD 04/09/2018 04/11/2018
Note: Held By: FREODICA Submitted gas riser diagram as revision was the same as the original submittal. Clarify per FBC 6th ed. 107.2.1. F.Reodica -386-986-4734.
ZON COMPLETE 01/16/2018 01/17/2018
Note: Released By: TAWILLIAMS
SW1 COMPLETE 01/16/2018 01/17/2018
Note: Released By: DREWIS
ZON HOLD 01/08/2018 01/09/2018
Note: Held By: AMOBLEY Per the LDC all driveways must lead to a garage. Can not extend driveway past the garage entrance
SW1 HOLD 01/08/2018 01/11/2018
Note: Held By: DREWIS Revised site plan must depict survey elevation changes to be made. Daniel Rewis 986-4736
UD1 COMPLETE 01/08/2018 01/09/2018
Note: Released By: MBACON (ATTENTION PLEASE READ) All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA clear zone for a hydrant is 3 feet from both sides and 3 feet behind the hydrant. Front of hydrant shall remain completely clear.
SW1 COMPLETE 12/22/2017 12/22/2017
Note: Released By: JHINDMAN foundations
MECH COMPLETE 10/04/2017 10/05/2017
Note: Released By: FREODICA
MECH HOLD 09/20/2017 09/21/2017
Note: Held By: FREODICA Repeat comment for item 2 2. Provide signature of owner/agent on energy calculations per FBC 5th ed. 107.21. F.Reodica -386-986- 4734. Additional comment on 9-20-17 submittal: Provide new home address on energy performance level (EPL) display card per FBCEC 5th ed. R401.3.
ELEC COMPLETE 09/20/2017 09/20/2017
Note: Released By: JHINDMAN
BLD COMPLETE 08/17/2017 08/25/2017
Note: Released By: JHINDMAN
ELEC HOLD 08/17/2017 08/25/2017
Note: Held By: JHINDMAN 1. Provide an electrical plan and riser. 5th ed. FBC 107.3.5.
ENGIN1 COMPLETE 08/17/2017 08/21/2017
Note: Released By: TBAKER
MECH HOLD 08/17/2017 08/23/2017
Note: Held By: FREODICA 1. Provide balanced return air from study room per FBCR 5th ed. M1602.4. 2. Provide signature of owner/agent on energy calculations per FBC 5th ed. 107.21. F.Reodica -386-986- 4734.
PLUM COMPLETE 08/17/2017 08/23/2017
Note: Released By: FREODICA
SW1 COMPLETE 08/17/2017 08/24/2017
Note: Released By: JHINDMAN
UD1 COMPLETE 08/17/2017 08/18/2017
Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind.
ZON COMPLETE 08/17/2017 08/17/2017
Note: Released By: AMOBLEY
URB COMPLETE 08/17/2017 08/18/2017
Note: Released By: JBEAUDET

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/16/2018
REINSPECTION FEE ¤40.00 07/09/2018
REINSPECTION FEE ¤40.00 06/28/2018
REINSPECTION FEE ¤40.00 06/28/2018
REINSPECTION FEE ¤40.00 06/28/2018
REINSPECTION FEE ¤40.00 04/06/2018
REINSPECTION FEE ¤40.00 04/06/2018
REINSPECTION FEE ¤40.00 04/06/2018
REVISION ¤40.00 04/06/2018
SITE PLAN 20 ¤20.00 10/06/2017
SURCHARGE FS 533.721 ¤16.35 10/06/2017
SURCHARGE - FS 468.631 ¤24.53 10/06/2017
STORM WATER PERMIT FEES ¤80.00 10/06/2017
3% TRANS IMPACT FEE CREDIT (¤93.74) 10/06/2017
ADMIN FEE ¤20.00 10/06/2017
ELECTRIC FEE ¤262.20 10/06/2017
3% FIRE IMPACT FEE CREDIT (¤6.56) 10/06/2017
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 10/06/2017
IMPACT FEE PARKS ¤849.24 10/06/2017
IMPACT FEE SCHOOL ¤3,600.00 10/06/2017
IMPACT FEE TRANSPORTATION ¤3,124.67 10/06/2017
MECHANICAL FEE ¤262.20 10/06/2017
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/06/2017
PLAN CHECK FEE ¤134.80 10/06/2017
PLUMBING FEE ¤262.20 10/06/2017
NEW RESIDENTIAL INSPECTIONS ¤674.00 10/06/2017
Fees Total Due: ¤0.00 Total Paid: ¤9,783.20