I want to search for...
Permit #2017080659
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00030-0030 |
| CONDITIONED SPACE: 2688 sqft |
| GARAGE: 698 sqft |
| OPENED PORCH (WITH ROOF) : 66 sqft |
| OPENED PORCH (WITH ROOF) : 195 sqft |
| Total Square Footage: 3647 sqft |
| Block: 00030 |
| Subdivision: 2108 - Hidden Lakes- Phase II-Toscana |
| Job Phone: 863-420-2100 |
| Location Address: 4 NEW OAK LEAF DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/06/2017 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| GAS FINAL | 07/17/2018 | APPROVED | CMINI |
| BLD - BUILDING FINAL | 07/17/2018 | FINAL APPROVED | CMINI |
| GAS FINAL | 07/16/2018 | Disapproved - NO FEE | WMILLER |
| Note: TEST PRESSURE NEEDED ON PIPE FBC.G2417, RE-TAG FOR PRESSURE APPLIED AFTER PRESSURE IS APPLIED | |||
| BLD - BUILDING FINAL | 07/16/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: VENT STACKS/PIPES FBC, R, P3103.1 MUST TERMINATE NOT LESS THAN 6 INCHES ABOVE THE ROOF ALSO MUST PASS GAS ROUGH PRIOR | |||
| GAS FINAL | 07/13/2018 | CANCELLED BY APPLICANT | WMILLER |
| Note: cancelled per Mason Moore waiting on Plumbing revision | |||
| BLD - BUILDING FINAL | 07/13/2018 | CANCELLED BY APPLICANT | WMILLER |
| Note: cancelled per Mason Moore waiting on Plumbing revision | |||
| GAS FINAL | 07/06/2018 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NO GAS TANK ON SITE, NO GAS TIED TO HOUSE | |||
| U-CROSS CONNECTION | 06/28/2018 | APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 06/28/2018 | APPROVED | KHOWELL |
| ROW - FINAL INSPECTION | 06/28/2018 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 06/28/2018 | FINAL APPROVED | LFITZGERALD |
| FINAL SURVEY (OFFICE USE ONLY) | 06/25/2018 | APPROVED | DREWIS |
| ELECTRIC - EARLY POWER | 06/18/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 2:50 | |||
| ROW- PRE-APRON (PRE-POUR) | 06/13/2018 | APPROVED | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 06/08/2018 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR CONCRETE APRON AND SIDEWALK POUR ONLY. PAVER DRIVEWAY | |||
| TUB SET | 05/29/2018 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 05/02/2018 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 05/02/2018 | APPROVED | LFITZGERALD |
| INSULATION | 04/18/2018 | APPROVED | CMINI |
| LATH/BRICK/ WATER BARRIER | 04/18/2018 | APPROVED | CMINI |
| ELECTRIC-TUG | 04/16/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: spoke to fpl released tug 3:10 | |||
| GAS ROUGH | 04/16/2018 | APPROVED - AS NOTED | JGIBSON |
| Note: need to list all sub-contractors for permit | |||
| GAS ROUGH | 04/13/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: missing gas riser diagrahm. FBC 105.1 | |||
| ELECTRIC-TUG | 04/13/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: tug outlet not GFCI protected/ not complete | |||
| ALL ROUGH | 04/13/2018 | APPROVED - AS NOTED | CMINI |
| Note: fireblocking missing, check all. also fireblock needs to be 3/4" thick. FBC 302electric boxes not complete in garage. check on insulation | |||
| ROOF VALLEY & METAL | 04/12/2018 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/11/2018 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/09/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: mid mitered wall truss straps in wrong location, master bd.rm. exterior top wall plate missing straps | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/06/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: missing straps on wood midwall all trusses. missing straps at top of stud walls in master bath and bed rooms. check all post missing straps at top to girders | |||
| GAS ROUGH | 04/06/2018 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: need riser non on site | |||
| ROOF SHEATHING | 01/29/2018 | APPROVED | CMINI |
| TIE BEAM / LINTEL | 12/27/2017 | APPROVED | WMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 12/22/2017 | APPROVED | JHINDMAN |
| MONOLITHIC SLAB | 12/14/2017 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 12/12/2017 | CANCELLED BY APPLICANT | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/06/2017 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED TO LIST ALL SUB-CONTRACTORS OF RECORD FOR PERMIT BEFORE MONOLITHIC SLAB INSPECTION | |||
| FOOTER | 10/18/2017 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| FOOTER | 10/17/2017 | Disapproved -FEE REQUIRED | CMINI |
| Note: need to clean out footings, lots of cave ins | |||
| FOOTER | 10/16/2017 | CANCELLED BY APPLICANT | AIRS WEB |
Review History
| Department | Status | Date In | Date Out |
| PLUM | COMPLETE | 07/12/2018 | 07/13/2018 |
| Note: Released By: JHINDMAN | |||
| PLUM | HOLD | 07/09/2018 | 07/12/2018 |
| Note: Held By: JHINDMAN 1. The proposed underground tank must be a minimum of 10 feet away from the house and 10 feet from the property line per nfpa58. J. Hindman 986-3784. Also need to address if previous revision was cancelled. J. Hindman 986-3784. | |||
| SW1 | COMPLETE | 06/22/2018 | 06/25/2018 |
| Note: Released By: DREWIS final s | |||
| PLUM | HOLD | 04/09/2018 | 04/11/2018 |
| Note: Held By: FREODICA Submitted gas riser diagram as revision was the same as the original submittal. Clarify per FBC 6th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| ZON | COMPLETE | 01/16/2018 | 01/17/2018 |
| Note: Released By: TAWILLIAMS | |||
| SW1 | COMPLETE | 01/16/2018 | 01/17/2018 |
| Note: Released By: DREWIS | |||
| ZON | HOLD | 01/08/2018 | 01/09/2018 |
| Note: Held By: AMOBLEY Per the LDC all driveways must lead to a garage. Can not extend driveway past the garage entrance | |||
| SW1 | HOLD | 01/08/2018 | 01/11/2018 |
| Note: Held By: DREWIS Revised site plan must depict survey elevation changes to be made. Daniel Rewis 986-4736 | |||
| UD1 | COMPLETE | 01/08/2018 | 01/09/2018 |
| Note: Released By: MBACON (ATTENTION PLEASE READ) All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA clear zone for a hydrant is 3 feet from both sides and 3 feet behind the hydrant. Front of hydrant shall remain completely clear. | |||
| SW1 | COMPLETE | 12/22/2017 | 12/22/2017 |
| Note: Released By: JHINDMAN foundations | |||
| MECH | COMPLETE | 10/04/2017 | 10/05/2017 |
| Note: Released By: FREODICA | |||
| MECH | HOLD | 09/20/2017 | 09/21/2017 |
| Note: Held By: FREODICA Repeat comment for item 2 2. Provide signature of owner/agent on energy calculations per FBC 5th ed. 107.21. F.Reodica -386-986- 4734. Additional comment on 9-20-17 submittal: Provide new home address on energy performance level (EPL) display card per FBCEC 5th ed. R401.3. | |||
| ELEC | COMPLETE | 09/20/2017 | 09/20/2017 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 08/17/2017 | 08/25/2017 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 08/17/2017 | 08/25/2017 |
| Note: Held By: JHINDMAN 1. Provide an electrical plan and riser. 5th ed. FBC 107.3.5. | |||
| ENGIN1 | COMPLETE | 08/17/2017 | 08/21/2017 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 08/17/2017 | 08/23/2017 |
| Note: Held By: FREODICA 1. Provide balanced return air from study room per FBCR 5th ed. M1602.4. 2. Provide signature of owner/agent on energy calculations per FBC 5th ed. 107.21. F.Reodica -386-986- 4734. | |||
| PLUM | COMPLETE | 08/17/2017 | 08/23/2017 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 08/17/2017 | 08/24/2017 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 08/17/2017 | 08/18/2017 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind. | |||
| ZON | COMPLETE | 08/17/2017 | 08/17/2017 |
| Note: Released By: AMOBLEY | |||
| URB | COMPLETE | 08/17/2017 | 08/18/2017 |
| Note: Released By: JBEAUDET |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/16/2018 |
| REINSPECTION FEE | ¤40.00 | 07/09/2018 |
| REINSPECTION FEE | ¤40.00 | 06/28/2018 |
| REINSPECTION FEE | ¤40.00 | 06/28/2018 |
| REINSPECTION FEE | ¤40.00 | 06/28/2018 |
| REINSPECTION FEE | ¤40.00 | 04/06/2018 |
| REINSPECTION FEE | ¤40.00 | 04/06/2018 |
| REINSPECTION FEE | ¤40.00 | 04/06/2018 |
| REVISION | ¤40.00 | 04/06/2018 |
| SITE PLAN 20 | ¤20.00 | 10/06/2017 |
| SURCHARGE FS 533.721 | ¤16.35 | 10/06/2017 |
| SURCHARGE - FS 468.631 | ¤24.53 | 10/06/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/06/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 10/06/2017 |
| ADMIN FEE | ¤20.00 | 10/06/2017 |
| ELECTRIC FEE | ¤262.20 | 10/06/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 10/06/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 10/06/2017 |
| IMPACT FEE PARKS | ¤849.24 | 10/06/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/06/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 10/06/2017 |
| MECHANICAL FEE | ¤262.20 | 10/06/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/06/2017 |
| PLAN CHECK FEE | ¤134.80 | 10/06/2017 |
| PLUMBING FEE | ¤262.20 | 10/06/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤674.00 | 10/06/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,783.20 |