Permit #2017080941
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00540-0220 |
| CONDITIONED SPACE: 1596 sqft |
| GARAGE: 411 sqft |
| OPENED PORCH (WITH ROOF) : 20 sqft |
| OPENED PORCH (WITH ROOF) : 154 sqft |
| Total Square Footage: 2181 sqft |
| Block: 00540 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: 386-236-4133 |
| Location Address: 165 RYAN DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/06/2017 |
| NOC: RECORDED |
| Applicant name: LEONARDO CIRO SANCLEMENTE |
| Owner: BEAL, STEVEN & BEVERLY |
|
Address 71 PHEASANT DR PALM COAST, FL 32164 |
| Lot: 0220 |
| Contracted Stated Job Value: ¤200,628.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INTERVEST CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone |
| CANCEL |
2379 BEVILLE RD DAYTONA BEACH, FL 32119 |
CBC1261237 (Exp: 08/31/2020) | 386-236-4133 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
ROBERT CRAIG KULP
| Status | Location Address | State License Number | Phone |
| CANCEL |
5401 ENERGY AIR CT ORLANDO, FL 32810 |
CAC1816317 (Exp: 08/31/2022) | 407-886-3729 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
BARRY D MARTIN
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
1650 N STATE STREET Bunnell, FL 32110 |
CCC033728 (Exp: 08/31/2020) | (386) 437-7700 | (386)437-7701 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 03/16/2018 | FINAL APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL INSPECTION | 03/15/2018 | APPROVED - AS NOTED | KHOWELL |
| Note: THIS IS A REINSPECTION CONTRACTOR IS LAYING SOD TODAY IN THE DISTURBED AREAS. WILL REINSPECT DURING THE FINAL APRON | |||
| ROW - FINAL INSPECTION | 03/14/2018 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: THIS IS A REINSPECTION CLEAN THE CONCRETE REMANTS OUT OF THE R.O.W. AND FINISH SODDING R.O.W. BOTH SIDE OF ROAD THAT WAS DISTURBED PER PALM COAST FL. CODE OF ORDINANCES SEC. 42-52 C. SEED AND STRAW NOT ALLOWED IN THE R.O.W. SOD ONLY IN KIND. ALSO SWALE PLAN NEEDS TO BE ON SITE | |||
| U -UTILITY RESIDENTIAL FINAL | 03/14/2018 | FINAL APPROVED | LFITZGERALD |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 03/06/2018 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: Pep tank clean out cap required to be flush with sod grade,not at a 45 angle | |||
| ROW - FINAL APRON (AFTER POUR) | 03/06/2018 | Disapproved - NO FEE | KHOWELL |
| Note: CHECK TO MAKE SURE THERE IS NO CONCRETE IN CULVERT PIPE, SEE NOTES IN THE R.O.W. FINAL ALSO. | |||
| ROW - FINAL INSPECTION | 03/06/2018 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: CLEAN TRASH OUT OF ADJOINING VACANT LOTS, SEED AND STRAW DISTURBED AREA AT REAR OF PROPERTY AND ADJACENT LOT, SOD ANY DISTURBED R.O.W. IN KIND AND ACROSS THE ROAD CUT IN TO MATCH EXISTING GRADE. REMOVE EXPANSION JOINT MATERIAL ALONG APRON AND REPAIR DAMAGED ASPHALT PAVEMENT WITH PERMINANT PAVEMENT | |||
| BLD - BUILDING FINAL | 03/06/2018 | FINAL APPROVED | DROCKWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 03/05/2018 | APPROVED | JHINDMAN |
| ROW - FINAL APRON (AFTER POUR) | 02/26/2018 | Disapproved - NO FEE | CTROHA |
| Note: NEED FINAL SURVEY APPROVED FOR THIS INSPECTION | |||
| GRAVITY SEWER TEST | 02/09/2018 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 02/09/2018 | APPROVED | MBACON |
| ELECTRIC - EARLY POWER | 02/07/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 3:45 | |||
| ROW- PRE-APRON (PRE-POUR) | 02/07/2018 | APPROVED - AS NOTED | CTROHA |
| Note: FORMS AT THE ROAD EDGE NEED CORRECTED. END OF DRIVEWAY NEEDS TO BE NO MORE THAN 2" AWAY FROM ROAD EDGE READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. | |||
| INSULATION | 12/27/2017 | CANCELLED BY APPLICANT | AIRS WEB |
| INSULATION | 12/27/2017 | APPROVED | WMILLER |
| LATH/BRICK/ WATER BARRIER | 12/27/2017 | APPROVED | WMILLER |
| ALL ROUGH | 12/15/2017 | APPROVED - AS NOTED | DROCKWELL |
| Note: Nail plate for sink drain bottom plate hallway entry | |||
| ROOF VALLEY & METAL | 12/13/2017 | FINAL APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/06/2017 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/01/2017 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Not ready for inspection.Structural work not completed | |||
| TIE BEAM / LINTEL | 11/17/2017 | APPROVED | WMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 11/16/2017 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 11/08/2017 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/03/2017 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED REVISION FOR USE OF''AAV'' IN MASTER BATH LAV. AREA RISER SHOWS ''VTR''. HAVE ON SITE BEFORE LINTEL INSPECTION |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 03/01/2018 | 03/05/2018 |
| Note: Released By: JHINDMAN final s | |||
| SW1 | COMPLETE | 11/16/2017 | 11/16/2017 |
| Note: Released By: DREWIS found survey | |||
| PLUM | COMPLETE | 11/03/2017 | 11/09/2017 |
| Note: Released By: FREODICA Revision: changed sanitary riser diagram | |||
| ZON | COMPLETE | 09/27/2017 | 09/28/2017 |
| Note: Released By: TAWILLIAMS | |||
| UD1 | COMPLETE | 09/27/2017 | 09/29/2017 |
| Note: Released By: MBACON This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| MECH | COMPLETE | 09/27/2017 | 09/29/2017 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 09/27/2017 | 10/02/2017 |
| Note: Released By: DREWIS | |||
| BLD | COMPLETE | 08/24/2017 | 08/28/2017 |
| Note: Released By: FREODICA | |||
| ELEC | COMPLETE | 08/24/2017 | 09/01/2017 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 08/24/2017 | 09/07/2017 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 08/24/2017 | 08/28/2017 |
| Note: Held By: FREODICA Provide signature and license number of hvac contractor on hvac plan per FBC 5th ed. 105.3.1.2. F.Reodica-386-986-4734. | |||
| PLUM | COMPLETE | 08/24/2017 | 08/28/2017 |
| Note: Released By: FREODICA | |||
| SW1 | HOLD | 08/24/2017 | 09/01/2017 |
| Note: Held By: JHINDMAN 1.Provide a proposed drainage plan that includes the following. The elevations on all adjacent properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. The elevations at 20 foot intervals along all property lines. The interior elevations at no greater than a 20 foot grid. per ch.5 ULDC Technical manual. 2. the grade at the house shall fall 6" within the first 10 ft. 5th edition FBC Residential 401.3. | |||
| UD1 | HOLD | 08/24/2017 | 08/25/2017 |
| Note: Held By: MBACON PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan. | |||
| ZON | HOLD | 08/24/2017 | 08/24/2017 |
| Note: Held By: AMOBLEY Per the LDC there shall be one tree for each 2500 square feet. Pine trees are not considered a credited tree |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 03/15/2018 |
| REINSPECTION FEE | ¤40.00 | 03/15/2018 |
| REINSPECTION FEE | ¤40.00 | 03/15/2018 |
| REINSPECTION FEE | ¤40.00 | 03/15/2018 |
| REVISION | ¤40.00 | 03/15/2018 |
| SITE PLAN 20 | ¤20.00 | 10/06/2017 |
| SURCHARGE FS 533.721 | ¤10.63 | 10/06/2017 |
| SURCHARGE - FS 468.631 | ¤15.94 | 10/06/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/06/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 10/06/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤401.26 | 10/06/2017 |
| ADMIN FEE | ¤20.00 | 10/06/2017 |
| ELECTRIC FEE | ¤180.38 | 10/06/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 10/06/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 10/06/2017 |
| IMPACT FEE PARKS | ¤849.24 | 10/06/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/06/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 10/06/2017 |
| MECHANICAL FEE | ¤180.38 | 10/06/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/06/2017 |
| PLAN CHECK FEE | ¤80.25 | 10/06/2017 |
| PLUMBING FEE | ¤180.38 | 10/06/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,036.14 |