I want to search for...
Permit #2017081007
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00030-0040 |
| CONDITIONED SPACE: 2443 sqft |
| CONDITIONED SPACE: 269 sqft |
| GARAGE: 764 sqft |
| OPENED PORCH (WITH ROOF) : 442 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| Total Square Footage: 4009 sqft |
| Block: 00030 |
| Subdivision: 2108 - Hidden Lakes- Phase II-Toscana |
| Job Phone: 863-420-2100 |
| Location Address: 6 NEW OAK LEAF DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/12/2017 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/05/2018 | FINAL APPROVED | CMINI |
| U-CROSS CONNECTION | 09/04/2018 | APPROVED | LFITZGERALD |
| BLD - BUILDING FINAL | 09/04/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: CONDENSATE LINES SHALL DISCHARGE AT LEAST 1 FOOT AWAY FROM STRUCTURE SIDEWALL FBC R318.5 A/C condensor pad needs to have min 3" clearance from earth.M1305.1.4.1 Ground clearance. missing part of soffit in rear. missing disposal switch | |||
| ROW - FINAL APRON (AFTER POUR) | 09/04/2018 | APPROVED | KHOWELL |
| ROW - FINAL INSPECTION | 09/04/2018 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 09/04/2018 | FINAL APPROVED | LFITZGERALD |
| Note: As discussed and agreed by Mason, re-use meter pit will be brought up to finish grade,(as much as possible by adjusting grades around) and will add some soils to north side of water meter pit so as to flush with sorrounding grades. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/30/2018 | APPROVED | JHINDMAN |
| TIE BEAM / LINTEL | 08/22/2018 | APPROVED - AS NOTED | CMINI |
| Note: pool wall complete | |||
| TUB SET | 08/08/2018 | APPROVED | JGIBSON |
| ELECTRIC - EARLY POWER | 07/27/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 3:50 | |||
| ELECTRIC - EARLY POWER | 07/25/2018 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: EXTERIOR OUTLETS NEED TO BE INSTALLED, NEED TO BE SAFED OFF FOR INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 07/25/2018 | APPROVED | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 07/18/2018 | PARTIALLY APPROVED | KHOWELL |
| Note: APRON AND SIDEWALK ONLY PAVER DRIVEWAY | |||
| U - SEWER TIE IN | 06/08/2018 | APPROVED | LFITZGERALD |
| GRAVITY SEWER TEST | 06/08/2018 | APPROVED | CMINI |
| INSULATION | 05/21/2018 | APPROVED | CMINI |
| LATH/BRICK/ WATER BARRIER | 04/26/2018 | APPROVED | CMINI |
| INSULATION | 04/18/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: insulation does not match approved energy calculations, needs to be a vented attic. | |||
| ALL ROUGH | 04/11/2018 | APPROVED - AS NOTED | CMINI |
| Note: phase out hot white conductors in panel, nail plates needed on electric and plumbing in kitchen area. need to anchor arch windows | |||
| ELECTRIC-TUG | 03/16/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TUG 3:30 | |||
| ROOF VALLEY & METAL | 02/09/2018 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/08/2018 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/07/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: missing tapcons on straps at front entry, missing nails in sp4s on bearing wall, missing 1 bolt in 4 ply truss | |||
| ROOF SHEATHING | 01/23/2018 | APPROVED | CMINI |
| TIE BEAM / LINTEL | 01/03/2018 | APPROVED | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 12/22/2017 | APPROVED | JHINDMAN |
| ELECTRIC TEMP POLE | 12/14/2017 | APPROVED - AS NOTED | RMARTIN |
| Note: spoke to dell fpl released temp pole 3:00 | |||
| MONOLITHIC SLAB | 12/14/2017 | APPROVED | CMINI |
| ELECTRIC TEMP POLE | 12/08/2017 | APPROVED - AS NOTED | CMINI |
| Note: called fpl to release power at 230pm, spoke to Dell | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/07/2017 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED REVISION TO SHOW PLUMBING RISER COMING OUT OF BUILDING TWICE INSTEAD OF ONCE | |||
| FOOTER | 11/07/2017 | APPROVED | CMINI |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 08/29/2018 | 08/30/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 08/24/2018 | 08/29/2018 |
| Note: Held By: JHINDMAN FINAL Survey .does not show minimum fall on right side of house 1.Lots shall be graded to drain surface water away from foundation walls. The grade shall fall a minimum of 6 inches (152 mm) within the first 10 feet per 6th ed. Florida Building Code 401.3. | |||
| MECH | COMPLETE | 05/18/2018 | 05/18/2018 |
| Note: Released By: FREODICA Correction to revision: changed energy calculations. | |||
| MECH | HOLD | 05/15/2018 | 05/17/2018 |
| Note: Held By: FREODICA Revision correction to energy calculations 1. Provide signature of owner/agent on energy code compliance certification per FBCEC 5th ed. R405.3. 2. Provide signature of builder on energy performance level (EPL) display card per FBCEC 5th ed. R405.4.3. F.Reodica -386-986-4734. | |||
| MECH | HOLD | 05/04/2018 | 05/08/2018 |
| Note: Held By: FREODICA Enegy calculations shall be based on 2014 (5th edition) as the code was still in effect at the time of permit application. F.Reodica -386-986-4734. | |||
| MECH | HOLD | 04/24/2018 | 04/27/2018 |
| Note: Held By: FREODICA Revison : Enegy calculations 1. Enegy performance level (EPL) display card shall be signed by the builder per FBCEC 6th ed. R401.3. 2. The capacity of selected hvac units shall not be more than 1.15 times greater than the total calculated cooling load per FBCEC 6th ed. R403.7.1.1. F.Reodica - 386-986-4734. | |||
| BLD | COMPLETE | 01/25/2018 | 01/29/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 12/22/2017 | 12/22/2017 |
| Note: Released By: JHINDMAN foundation survey | |||
| PLUM | COMPLETE | 12/15/2017 | 12/19/2017 |
| Note: Released By: JHINDMAN | |||
| MECH | COMPLETE | 10/12/2017 | 10/12/2017 |
| Note: Released By: FREODICA Address of new home located on top of page. | |||
| ZON | COMPLETE | 10/03/2017 | 10/04/2017 |
| Note: Released By: TAWILLIAMS | |||
| URB | COMPLETE | 10/03/2017 | 10/04/2017 |
| Note: Released By: JBEAUDET | |||
| MECH | HOLD | 10/03/2017 | 10/10/2017 |
| Note: Held By: FREODICA Repeat comment for item 1: Held By: FREODICA 1. Energy performance level (EPL) display card shall be completed with date and address of the new house per FBC 5th ed. 107.2.1. | |||
| BLD | COMPLETE | 10/03/2017 | 10/10/2017 |
| Note: Released By: JHINDMAN | |||
| URB | HOLD | 08/29/2017 | 09/05/2017 |
| Note: Held By: JBEAUDET 9/5/17 (JB) NEED TO TRADE THE MAPLE TREE RIGHT FRONT FOR A ELM STREET TREE. | |||
| BLD | HOLD | 08/28/2017 | 09/05/2017 |
| Note: Held By: FREODICA Provide manufacturer's specifications and installation instructions of spray foam insulation per FBCR 5th ed. R 316. F.Reodica -386-986-4734. | |||
| ELEC | COMPLETE | 08/28/2017 | 09/08/2017 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 08/28/2017 | 08/29/2017 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 08/28/2017 | 09/05/2017 |
| Note: Held By: FREODICA 1. Energy performance level (EPL) display card shall completed with date and address of the new house per FBC 5th ed. 107.2.1. 2. The energy calculation shows 10 ft ceiling height but floor plan shows 12 ft. Coordinate per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| PLUM | COMPLETE | 08/28/2017 | 09/05/2017 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 08/28/2017 | 09/19/2017 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 08/28/2017 | 08/30/2017 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 08/28/2017 | 08/29/2017 |
| Note: Held By: TAWILLIAMS Survey appears to have the wrong address (street should be New Oak Leaf) |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/05/2018 |
| REINSPECTION FEE | ¤40.00 | 09/05/2018 |
| REINSPECTION FEE | ¤40.00 | 09/05/2018 |
| REVISION | ¤40.00 | 09/05/2018 |
| REVISION | ¤40.00 | 02/07/2018 |
| REVISION | ¤40.00 | 02/07/2018 |
| REINSPECTION FEE | ¤40.00 | 02/07/2018 |
| SITE PLAN 20 | ¤20.00 | 10/12/2017 |
| SURCHARGE FS 533.721 | ¤17.07 | 10/12/2017 |
| SURCHARGE - FS 468.631 | ¤25.60 | 10/12/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 10/12/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 10/12/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤708.00 | 10/12/2017 |
| ADMIN FEE | ¤20.00 | 10/12/2017 |
| ELECTRIC FEE | ¤272.40 | 10/12/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 10/12/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 10/12/2017 |
| IMPACT FEE PARKS | ¤849.24 | 10/12/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 10/12/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 10/12/2017 |
| MECHANICAL FEE | ¤272.40 | 10/12/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 10/12/2017 |
| PLAN CHECK FEE | ¤141.60 | 10/12/2017 |
| PLUMBING FEE | ¤272.40 | 10/12/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,776.39 |