I want to search for...

Permit #2017081142

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00020-0080
CONDITIONED SPACE: 2443 sqft
CONDITIONED SPACE: 269 sqft
GARAGE: 764 sqft
OPENED PORCH (WITH ROOF) : 442 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
Total Square Footage: 4009 sqft
Block: 00020
Subdivision: 2108 - Hidden Lakes- Phase II-Toscana
Job Phone: 863-420-2100
Location Address: 24 NEW WATER OAK DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/13/2017
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0080
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/15/2018 FINAL APPROVED WMILLER
BLD - BUILDING FINAL 08/09/2018 CANCELLED BY APPLICANT CMINI
BLD - BUILDING FINAL 08/02/2018 Disapproved -FEE REQUIRED WMILLER
Note: MODEL NUMBER ON ENERGY CALC DOES NOT MATCH MODEL INSTALLED, MAKE CONDITIONS AT SITE MATCH APPROVED SUBMITTALS OR OBTAIN REVISION WITH CORRECT MODEL NUMBERS
U-CROSS CONNECTION 08/01/2018 FINAL APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 08/01/2018 APPROVED KHOWELL
ROW - FINAL INSPECTION 08/01/2018 FINAL APPROVED KHOWELL
U -UTILITY RESIDENTIAL FINAL 08/01/2018 FINAL APPROVED LFITZGERALD
Note: NOTE: water meter pit about 3-4 inches too high-i was informed by ABD rep.-Mason that during install , he advised the utility installers that it was too high but they set it at the present elevation. I confirmed that with Mike Hughes that there is a w/o to utility's by builder to lower when time permits.
FINAL SURVEY (OFFICE USE ONLY) 07/31/2018 APPROVED DREWIS
TUB SET 07/25/2018 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 07/24/2018 APPROVED KHOWELL
ROW- PRE-APRON (PRE-POUR) 07/23/2018 CANCELLED BY APPLICANT RGROSS
ROW- PRE-APRON (PRE-POUR) 07/18/2018 PARTIALLY APPROVED KHOWELL
Note: APRON AND SIDEWALK POUR ONLY PAVER DRIVEWAY
ELECTRIC - EARLY POWER 06/29/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 4:00
GRAVITY SEWER TEST 06/06/2018 APPROVED JGIBSON
U - SEWER TIE IN 06/06/2018 APPROVED DSPENCER
TIE BEAM / LINTEL 05/30/2018 APPROVED - AS NOTED CMINI
Note: pool wall completion
LATH/BRICK/ WATER BARRIER 05/04/2018 APPROVED CMINI
INSULATION 04/30/2018 APPROVED CMINI
ALL ROUGH 04/26/2018 APPROVED CMINI
ALL ROUGH 04/25/2018 Disapproved -FEE REQUIRED CMINI
Note: arch windows not screwed and missing furring strips check all
ROOF VALLEY & METAL 04/24/2018 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/20/2018 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/13/2018 Disapproved -FEE REQUIRED CMINI
Note: missing straps on trusses, copola not complete, sill plate for truss gables not complete, can not see connections at front entry, incomplete inspection, not read
ELECTRIC-TUG 04/13/2018 APPROVED - AS NOTED CMINI
Note: called Del from fpl to release
ROOF SHEATHING 02/07/2018 APPROVED CMINI
TIE BEAM / LINTEL 01/29/2018 APPROVED CMINI
MONOLITHIC SLAB 01/09/2018 APPROVED CMINI
PLUMBING 1ST ROUGH UNDERGROUND 12/27/2017 APPROVED - AS NOTED JGIBSON
Note: NEED REVISION TO SHOW SANITARY EXITING BUILDING TWICE INSTEAD OF ONCE LIKE RISER SHOWS
FOUND SURVEY APPROVED (OFFICE) 12/22/2017 APPROVED JHINDMAN
FOOTER 11/03/2017 APPROVED CMINI

Review History

Department Status Date In Date Out
MECH COMPLETE 08/14/2018 08/14/2018
Note: Released By: FREODICA Revision: changed energy calculations.
MECH HOLD 08/10/2018 08/13/2018
Note: Held By: FREODICA Coorection to revision: 1. Provide energy calculations using the applicablle Form R405-2014 as the permit still under 2014 code. 2. Provide consistent/coordinated information between energy calculations and equipment sizing calculations to the following items per FBC 6th ed. 107.1 a. Project location (address) b. Project design location (climate zone for summer design conditions). Use Daytona Beach, Flrida or St. Augustine, Florida per FBCEC 6th ed. R301. F.Reodica -386-986-4734.
MECH HOLD 08/08/2018 08/09/2018
Note: Held By: FREODICA Review comments on correction to revision of energy calculations.: 1. Florida energy code compliance certification shall be signed by the owner/agent per FBCEC 6th ed. R405.3. 2. Energy performance level (EPL) display card shall be signed by builder per FBCEC 6th ed. R401.3 3. The total capacity of selected hvac units shown on energy calculation and EPL display card does not match with those shown on equipment sizing calculation. Coordinate per FBC 6th ed. 107.1. F.Reodica -386-986-4734.
MECH HOLD 08/02/2018 08/07/2018
Note: Held By: FREODICA Revision:: changed energy calculations: 1. The cooling capacity of selected hvac units is 1.15 times greater than the calculated total cooling load which does not comply with FBCEC 6th ed. R403.7.1.1. 2. The referenced design location on energy calculation shows Orlando, FL. but the sizing calculation shows Daytona, Beach, FL. Coordinate and use Daytona Beach, FL per FBCEC 6th ed. R301. F.Reodica -386-986-4734.
SW1 COMPLETE 07/30/2018 07/31/2018
Note: Released By: DREWIS Final survey
PLUM HOLD 02/02/2018 02/06/2018
Note: Held By: FREODICA Revision- Sanitary riser diagram. The revised sanitary riser diagram shows (2) powder room but floor plan shows only one. Coordinate for clarity.FBC 6th ed. 107.2.1. F.Reodica -386-986-4734.
SW1 COMPLETE 12/22/2017 12/22/2017
Note: Released By: JHINDMAN foudnation
ZON COMPLETE 10/06/2017 10/06/2017
Note: Released By: TAWILLIAMS
MECH COMPLETE 10/06/2017 10/13/2017
Note: Released By: FREODICA
BLD COMPLETE 10/06/2017 10/10/2017
Note: Released By: JHINDMAN
URB COMPLETE 08/31/2017 09/18/2017
Note: Released By: JBEAUDET
BLD HOLD 08/30/2017 09/06/2017
Note: Held By: FREODICA If the house has unvented attic, provide manufacturer's specification and installation instructions of spray foam insulation per FBCR 5th ed. R316. See also mechanical comments. F.Reodica -386-986-4734.
ELEC COMPLETE 08/30/2017 09/14/2017
Note: Released By: JHINDMAN
ENGIN1 COMPLETE 08/30/2017 08/30/2017
Note: Released By: TBAKER
MECH HOLD 08/30/2017 09/06/2017
Note: Held By: FREODICA 1. Energy calculations show vented attic but plans show unvented attic. Coordinate and submit correction per FBC 5th ed. 107.2.1. 2. Coordinate the ceiling height of living room on enery calculations with floor plan for clarity per FBC 5th ed. 107.2.1. 3. Provide the addrees of the new house on energy performance level (EPL) display card per FBC 5th ed. FBCEC 5th ed. 401.3. F.Reodica -386-986-4734.
PLUM COMPLETE 08/30/2017 09/06/2017
Note: Released By: FREODICA
SW1 COMPLETE 08/30/2017 09/14/2017
Note: Released By: JHINDMAN
UD1 COMPLETE 08/30/2017 09/01/2017
Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON HOLD 08/30/2017 08/31/2017
Note: Held By: TAWILLIAMS Wrong FIRm panel number on site plan

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 08/14/2018
REINSPECTION FEE ¤40.00 08/03/2018
REINSPECTION FEE ¤40.00 08/01/2018
REINSPECTION FEE ¤40.00 08/01/2018
NEW RESIDENTIAL INSPECTIONS ¤708.00 10/13/2017
SITE PLAN 20 ¤20.00 10/13/2017
SURCHARGE FS 533.721 ¤17.07 10/13/2017
SURCHARGE - FS 468.631 ¤25.60 10/13/2017
STORM WATER PERMIT FEES ¤80.00 10/13/2017
3% TRANS IMPACT FEE CREDIT (¤93.74) 10/13/2017
ADMIN FEE ¤20.00 10/13/2017
ELECTRIC FEE ¤272.40 10/13/2017
3% FIRE IMPACT FEE CREDIT (¤6.56) 10/13/2017
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 10/13/2017
IMPACT FEE PARKS ¤849.24 10/13/2017
IMPACT FEE SCHOOL ¤3,600.00 10/13/2017
IMPACT FEE TRANSPORTATION ¤3,124.67 10/13/2017
MECHANICAL FEE ¤272.40 10/13/2017
3% PARKS IMPACT FEE CREDIT (¤25.48) 10/13/2017
PLAN CHECK FEE ¤141.60 10/13/2017
PLUMBING FEE ¤272.40 10/13/2017
Fees Total Due: ¤0.00 Total Paid: ¤9,656.39