I want to search for...
Permit #2017090491
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00010-0160 |
| CONDITIONED SPACE: 2443 sqft |
| CONDITIONED SPACE: 269 sqft |
| GARAGE: 764 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| OPENED PORCH (WITH ROOF) : 442 sqft |
| Total Square Footage: 4009 sqft |
| Block: 00010 |
| Subdivision: 2108 - Hidden Lakes- Phase II-Toscana |
| Job Phone: 863-420-2100 |
| Location Address: 31 NEW LEATHERWOOD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/07/2017 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 11/30/2018 | APPROVED | LFITZGERALD |
| U -UTILITY RESIDENTIAL FINAL | 11/30/2018 | FINAL APPROVED | LFITZGERALD |
| U -UTILITY RESIDENTIAL FINAL | 11/29/2018 | CANCELLED BY APPLICANT | LFITZGERALD |
| U-CROSS CONNECTION | 11/29/2018 | CANCELLED BY APPLICANT | LFITZGERALD |
| BLD - BUILDING FINAL | 11/29/2018 | APPROVED | MWILLIAMS |
| U-CROSS CONNECTION | 11/28/2018 | Disapproved - NO FEE | LFITZGERALD |
| Note: Re-use meter/pit not yet installed-utility dept. informed | |||
| BLD - BUILDING FINAL | 11/28/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: TO MANY DEFICIENT ITEMS, INSPECTION STOPPED, INCOMPLETE LIST, 1. ADDRESS NUMBERS, SITE ADDRESS NUMBERS FBC R319. 2. WEATHER STRIPPING NEEDS TO BE INSTALLED R 612.1 FBC 3. HOSE BIBB, VACUUM BREAKER 2902.4.3 , REQUIRED 4. GARAGE DOOR SELF-CLOSING DEVICES R302.5.1 | |||
| ROW - FINAL APRON (AFTER POUR) | 11/28/2018 | APPROVED | KHOWELL |
| ROW - FINAL INSPECTION | 11/28/2018 | FINAL APPROVED | KHOWELL |
| U -UTILITY RESIDENTIAL FINAL | 11/28/2018 | Disapproved - NO FEE | LFITZGERALD |
| Note: Utility re-use meter/pit not yet installed-must be in to inspect for re-use inspection. Utility dept. informed | |||
| FINAL SURVEY (OFFICE USE ONLY) | 11/27/2018 | APPROVED | DREWIS |
| ROW- PRE-APRON (PRE-POUR) | 11/13/2018 | APPROVED | KHOWELL |
| TUB SET | 11/08/2018 | APPROVED | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 11/02/2018 | PARTIALLY APPROVED | KHOWELL |
| Note: APRON AND SIDEWALK ONLY PAVER UPPER DRIVEWAY | |||
| ROW- PRE-APRON (PRE-POUR) | 11/01/2018 | CANCELLED BY APPLICANT | RGROSS |
| ELECTRIC - EARLY POWER | 10/31/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED EARLY POWER 3:00 | |||
| TIE BEAM / LINTEL | 10/18/2018 | APPROVED - AS NOTED | CMINI |
| Note: pool area | |||
| GRAVITY SEWER TEST | 09/25/2018 | APPROVED | JGIBSON |
| U - SEWER TIE IN | 09/25/2018 | APPROVED | LFITZGERALD |
| LATH/BRICK/ WATER BARRIER | 09/13/2018 | APPROVED | CMINI |
| INSULATION | 09/12/2018 | APPROVED | CMINI |
| INSULATION | 09/11/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: house spray foamed, need calcs on site | |||
| ROOF VALLEY & METAL | 08/29/2018 | APPROVED | WMILLER |
| Note: approved | |||
| INSULATION | 08/24/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: need to revise energy calcs and plans to show unvented attic space | |||
| ALL ROUGH | 08/22/2018 | APPROVED | CMINI |
| ELECTRIC-TUG | 08/22/2018 | APPROVED - AS NOTED | CMINI |
| Note: called fpl to release, Susan | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/10/2018 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/08/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: need to correct structual fascia, missing straps on garage trusses circled on plan | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/06/2018 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/03/2018 | CANCELLED BY APPLICANT | WMILLER |
| Note: CANCELLED PER JOSH | |||
| ROOF SHEATHING | 06/18/2018 | APPROVED | CMINI |
| TIE BEAM / LINTEL | 06/07/2018 | APPROVED | CMINI |
| MONOLITHIC SLAB | 04/09/2018 | APPROVED | CMINI |
| MONOLITHIC SLAB | 04/05/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: not ready for inspection | |||
| FOUND SURVEY APPROVED (OFFICE) | 03/21/2018 | APPROVED | DREWIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/14/2018 | APPROVED | JGIBSON |
| FOOTER | 02/06/2018 | APPROVED - AS NOTED | WMILLER |
| Note: NEED TEMP TOILET BY NEXT INSPECTION TEMP TOILET 26. SANITARY FACILITIES REQUIRED B3305.1 SHALL BE PROVIDED DURING CONSTRUCTION |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 11/21/2018 | 11/27/2018 |
| Note: Released By: DREWIS | |||
| ZON | COMPLETE | 11/07/2018 | 11/07/2018 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 11/07/2018 | 11/07/2018 |
| Note: Released By: TBAKER | |||
| UTL | COMPLETE | 11/07/2018 | 11/08/2018 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind | |||
| SW1 | COMPLETE | 11/07/2018 | 11/11/2018 |
| Note: Released By: DREWIS | |||
| MECH | COMPLETE | 08/31/2018 | 09/07/2018 |
| Note: Released By: JHINDMAN | |||
| MECH | HOLD | 08/28/2018 | 08/29/2018 |
| Note: Held By: JHINDMAN 1. Page one and the EPL card are missing signatures. 6th ed. FBC R405. J. Hindman 986-3784. | |||
| SW1 | COMPLETE | 03/20/2018 | 03/21/2018 |
| Note: Released By: DREWIS foundation s | |||
| MECH | COMPLETE | 11/07/2017 | 11/07/2017 |
| Note: Released By: FREODICA | |||
| MECH | HOLD | 10/30/2017 | 11/06/2017 |
| Note: Held By: FREODICA The number of bedrooms shown on floor plan and on energy calculation do not match. Coordinate as previously requested per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| BLD | COMPLETE | 10/30/2017 | 11/06/2017 |
| Note: Released By: FREODICA | |||
| MECH | HOLD | 10/13/2017 | 10/13/2017 |
| Note: Held By: FREODICA Submitted correction for energy calculation dated 10-10 -17 shows the following discripancies: 1. Number of bedrooms = 0, page 1 of 5 = 4, page 2 of 5 = 3, floor plan 2. Capacity of cooling systems and efficiency = 42.2 kbtu/hr, 15 SEER ( item 12 page 1 of 5, and at EPL display card)) = 46 kbtu/hr, 14 SEER ( Cooling Equipment Summary) Coordinate and re-submit correction for clarity per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| BLD | COMPLETE | 10/10/2017 | 10/19/2017 |
| Note: Released By: RLEE | |||
| SW1 | COMPLETE | 10/06/2017 | 10/09/2017 |
| Note: Released By: DREWIS | |||
| MECH | HOLD | 10/06/2017 | 10/13/2017 |
| Note: Submitted correction for energy calculation shows the following discrepancies: 1. Number of bedrooms = 0, page 1 of 5 = 4 , page 2 of 5 = 3, on floor plan 2. Cooling system capacity and efficiency: = 42.2. kbtu/hr, 15 SEER ( | |||
| BLD | HOLD | 10/06/2017 | 10/06/2017 |
| Note: Held By: JHINDMAN Provide manufacturer's specifications and installation instructions of spray foam insulation per FBCR 5th ed. R316.2nd request J. Hindman 986-3784. | |||
| URB | COMPLETE | 10/06/2017 | 10/10/2017 |
| Note: Released By: JBEAUDET | |||
| URB | HOLD | 09/20/2017 | 09/26/2017 |
| Note: Held By: JBEAUDET Plan is not Legible | |||
| BLD | HOLD | 09/20/2017 | 09/25/2017 |
| Note: Held By: FREODICA Provide manufacturer's specifications and installation instructions of spray foam insulation per FBCR 5th ed. R316. F. Reodica -386-986-4734. | |||
| ELEC | COMPLETE | 09/20/2017 | 09/20/2017 |
| Note: Released By: JHINDMAN | |||
| ENGIN1 | COMPLETE | 09/20/2017 | 09/21/2017 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 09/20/2017 | 09/25/2017 |
| Note: Held By: FREODICA 1. Ptovide signature of owner/agent on energy calculation, and address, date of new home on energy performance level (EPL) display card per FBCEC 5th ed. R401.3?107.2.1. 2. Coodinate ceiling height of living room and family room on heating/cooling load calculation with floor plan per FBC 5th ed .107.2.1. F.Reodica -386-986-4734. | |||
| PLUM | COMPLETE | 09/20/2017 | 09/25/2017 |
| Note: Released By: FREODICA | |||
| SW1 | HOLD | 09/20/2017 | 09/20/2017 |
| Note: Held By: JHINDMAN 1. Provide a proposed drainage plan that includes. The elevations on all adjacent properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. The elevations at 20 foot intervals along all property lines. The interior elevations at no greater than a 20 foot grid. per ULDC Technical manual ch.5. 2. Provide a grade with a 6" fall 10 foot away from the foundation of the house. 5th ed. FBC R403.1. J. Hindman 986-3784. | |||
| UD1 | COMPLETE | 09/20/2017 | 09/22/2017 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | COMPLETE | 09/20/2017 | 09/20/2017 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 11/29/2018 |
| REINSPECTION FEE | ¤40.00 | 11/27/2018 |
| REVISION | ¤40.00 | 11/27/2018 |
| REINSPECTION FEE | ¤40.00 | 08/28/2018 |
| REINSPECTION FEE | ¤40.00 | 08/28/2018 |
| REINSPECTION FEE | ¤40.00 | 04/06/2018 |
| SITE PLAN 20 | ¤20.00 | 11/07/2017 |
| SURCHARGE FS 533.721 | ¤17.07 | 11/07/2017 |
| SURCHARGE - FS 468.631 | ¤25.60 | 11/07/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 11/07/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 11/07/2017 |
| ADMIN FEE | ¤20.00 | 11/07/2017 |
| ELECTRIC FEE | ¤272.40 | 11/07/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 11/07/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 11/07/2017 |
| IMPACT FEE PARKS | ¤849.24 | 11/07/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/07/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 11/07/2017 |
| MECHANICAL FEE | ¤272.40 | 11/07/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 11/07/2017 |
| PLAN CHECK FEE | ¤141.60 | 11/07/2017 |
| PLUMBING FEE | ¤272.40 | 11/07/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤708.00 | 11/07/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,736.39 |