Permit #2017090892

Permit Details

Status: FINAL

Parcel Id: 33-11-31-3060-00000-00N0
Block: 00000
Subdivision: 2106 - HIDDEN LAKES, PHASE 1
Location Address: 20 GRAHAM WOODS PL
Type: SDD - SUBDIVISION SITE DEVELOPMENT
Issue Date: 11/02/2017
NOC: RECORDED
Applicant name: CHAD HAZEN
Owner: HLPC, LLC

Address

2855 S ATLANTIC AVENUE #202

DAYTONA BEACH, FL 32118

Lot: 00N0
Contracted Stated Job Value: ¤700,000.00
Job Description: SUBDIVISION - SITE DEVELOPMENT PERMIT
Type: CN

Contractor

HAZEN CONSTRUCTION LLC
Status Location Address State License Number Phone
ACTIVE

1599 TIONIA RD

NEW SMYRNA BEACH, FL 32168

CGC061991 (Exp: 08/31/2026) 386-322-8700

Inspection History

Type Request Date Result Inspector
MAINT BOND ACCEPTANCE (OFFICE) 09/14/2018 APPROVED DRAMIREZ
FINAL SURVEY (COMM - OFFICE USE ONLY) 09/13/2018 APPROVED DRAMIREZ
LDSC- LANDSCAPE FINAL 09/13/2018 APPROVED - AS NOTED WBUTLER
Note: 9/13/18 WMB Contractor has promised to complete the seeding and mulching of the areas disturbed by FPL within one week, so I am approving the landscape final as noted. Larry Fitzgerald will follow up to make sure this work is done.
UC-FINAL SITE INSPECTION 09/13/2018 FINAL APPROVED LFITZGERALD
Note: NOTE: issue with hydroseeding disturbed soils has been resolved by this contractor.
U - UTILITY COMMERCIAL FINAL 09/13/2018 FINAL APPROVED LFITZGERALD
LDSC-PRE-PLANTING TREE QUALITY 08/30/2018 CANCELLED BY INSPECTOR WBUTLER
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 08/30/2018 APPROVED - AS NOTED WBUTLER
Note: Need to seed and mulch or hydroseed the disturbed soil on the vacant lots prior to final inspection.
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 08/30/2018 APPROVED - AS NOTED WBUTLER
Note: There were not any landscaping or irrigation associated with this phase of HIdden Lakes so landscape would just be the sodded areas which are covered on the cilvil plans.
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 08/23/2018 FINAL APPROVED LFITZGERALD
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 08/10/2018 CANCELLED BY APPLICANT LFITZGERALD
Note: Street signs not yet corrected, phone call to Hazen Pm-Matt confirmed that his sub-contractor runnung behind , should be done by Monday.
FINAL SURVEY (COMM - OFFICE USE ONLY) 08/10/2018 CANCELLED BY APPLICANT WEB
UC-FINAL SITE INSPECTION 08/10/2018 CANCELLED BY APPLICANT LFITZGERALD
Note: Final as-builts still pending city reviews, All paper work for Irma still outstanding. This was called in premature. Spoke with Matt-Hazen PM
UC-TRAF - FINAL (SIGN/PAVEMENT MARKING) 08/09/2018 CANCELLED BY APPLICANT LFITZGERALD
ROW - FINAL INSPECTION 07/27/2018 FINAL APPROVED LFITZGERALD
UC-SUBSTANTIAL WALK-THRU 07/27/2018 APPROVED LFITZGERALD
UC- PRELIMINARY AS-BUILTS 07/27/2018 APPROVED LFITZGERALD
UC-ASPHALT PRE PLACEMENT 07/13/2018 APPROVED LFITZGERALD
Note: Tim Cater-P&SPaving QA rep. was on site before andnduring asphalt placement to ensure min. thickness and base were staisfactory. At time of placement, Bechtol also on site and all was satisfactory.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 07/13/2018 APPROVED LFITZGERALD
UROW-RETENT/DETENT STABILI 07/13/2018 APPROVED LFITZGERALD
UROW -FINAL GRADE PRIOR SOD 07/13/2018 APPROVED LFITZGERALD
UROW - FINAL DRAINAGE 07/13/2018 APPROVED LFITZGERALD
U-PROJECT STATUS (OFFICE USE) 07/09/2018 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-2 day bac-t samoples after water main tie -in on Graham woods Place(1-for resident at#3-where boil water was in effect and 1 just down steram from tie-in) -all were clean and water line now fully open as aloop inti the existing .
U-GRAVITY SEWER INSTALL/TESTING 07/03/2018 APPROVED LFITZGERALD
Note: Gravity sewer observed for TV videoing /mandrel and all appeared satisfactory.
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 07/02/2018 APPROVED LFITZGERALD
Note: Water tie-in to existing now completed at both ends of the project. The loop system is closed pending passing bac-t results in few days since a boil water had to go into effect for 3 Grahams Woods Place. The city utility dept. is pulling a bac-t sample at the residence and one down stream off a 1in svc line.
U-GRAVITY SEWER INSTALL/TESTING 06/28/2018 PARTIALLY APPROVED LFITZGERALD
Note: air pressure testing now complete/pass for all gravity sewer manhole runs after repairs were made in service lateral leaks along manhole 17-20.All reports forwarded to contractor and Irma Velez.
UC-ASPHALT PRE PLACEMENT 06/28/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-road base compaction tests performed and passed for 98% and road excavations for sewer repairs were retested for their respective lift and passed for 98%.Asphalt mix design has been forwarded to inspector and plcement scheduled for next week.Base has been primed.
UROW - FORM BOARD/CONCRETE (NON STRUCTURAL) 06/28/2018 APPROVED LFITZGERALD
U-REUSE MAIN INSTALL/TESTING 06/19/2018 APPROVED LFITZGERALD
Note: Final tie in along Graham Woods Place(station 1+00) now complete and new phase is currently live with a loop system.
U-GRAVITY SEWER INSTALL/TESTING 06/18/2018 PARTIALLY APPROVED LFITZGERALD
Note: started air pressure testing for the gravity sewer with 9 manholes, due to several mechanical break downs starting in the am and also on site while trying to do the testing during the pm, this testing will continue tomorrow until completed.
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 06/15/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-Wire testing performed by 3rd party-Ed Stockley and satisfactory. As reminder,please call in these type of inspections where there are isolated testing or activity being performed, thank you
U-REUSE MAIN INSTALL/TESTING 06/15/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-Wire testing performed by Ed Stokley and satisfactory.
U-WATER MAIN DISINFECTION 06/15/2018 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-main has been diinfected and DEP clearence in process
UC-CONSTRUCTION ENTRANCE 06/15/2018 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-roadway at base stage , ready for asphalt-both entrances have been functional and debris onto existing paved roadway has been very limited
UC-MOT MAINTENANCE OF TRAFFIC 06/15/2018 APPROVED LFITZGERALD
ROW -TURBIDITY BARRER 06/15/2018 APPROVED LFITZGERALD
UROW- CURBING & GUTTER 06/13/2018 APPROVED - AS NOTED LFITZGERALD
Note: THIS IS A REINSPECTION- concrete valley gutter across Graham Trail/GrahamWoodsPlace that was not on plans was addded to make the drainage functional.(these exist peridiallly throughout initial phases for same purpose) Per my request, the Hazen had the EOR send me and the city a signed and sealed detail for this 3foot drainage gutter. Since part of the roadway, a 4000 psi mix with fiber was requsted and placed this am.
UC-ASPHALT PRE PLACEMENT 06/12/2018 PARTIALLY APPROVED LFITZGERALD
Note: roadway embankment ,stab.-subgrade testing(compaction and LBR's respectively) are now satisfactory and complete. The Limerock base is now being fine graded in preperation for compaction,priming and finally asphalt placement.
U-WATER MAIN DISINFECTION SAMPLING 06/12/2018 APPROVED - AS NOTED LFITZGERALD
Note: THIS IS A REINSPECTION-all 4 sample points now passed for bac-t sampling. 1 scren sample for lot 89 -exisiting vacant lot where water main was down for a time due to tie in (Graham trail) and another screen sample with a boil water notice will be adddressed by our utility dept. when the 2nd water main tie in(Graham Woods Place) is completed.
U-PROJECT STATUS (OFFICE USE) 06/12/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-sample location #2 now passed for bac-t testing, also performed a screen sample for lot #89 where the exisitng line was temp. shut down in order to make a water tie in along Graham Trail. Another screen sample will be done for the existing home at 3 Graham Woods Place by the utility dept. after a boil notice is given and that water main tie in is complete
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 06/08/2018 PARTIALLY APPROVED LFITZGERALD
Note: only partial areas were able to be properly tested for trace wire testing-valve in roadway covered over with base/another valve did not have trace wire installed correctly and there was no wire to test along Grahm Trail portion. Ed called Marc to share his findings and Marc stated he would have all ready and reschedule Ed when total wire test could be performed.
U-REUSE MAIN INSTALL/TESTING 06/08/2018 PARTIALLY APPROVED LFITZGERALD
Note: Wire test-re-use valves covered over in the roadway and most of re-use could not be tested; Ed callled Marc to state not ready for testing and Marc said he would reschedule when all could be correctly/completely tested.
UROW- CURBING & GUTTER 05/30/2018 PARTIALLY APPROVED LFITZGERALD
Note: miami curb now being placed via curb machine at starting 1+75(Graham Woods PLACE ) HEADING UPSTATION-EAST SIDE
U-PROJECT STATUS (OFFICE USE) 05/29/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-for some reason ,2nd bact-i sample pulled on Friday -May 25th was not recorded on time , and now per Marc Hazen request thru Danny/myself -Marc to pull for 2 day samples today and tomorrow at location #2 after good am flushing-ok with Danny and city to witness
U-WATER MAIN DISINFECTION SAMPLING 05/25/2018 PARTIALLY APPROVED DSPENCER
Note: 2nd day bac-t sample pulled at south end service that had failed per phil looks like 1st day passed this time
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 05/25/2018 PARTIALLY APPROVED DSPENCER
Note: silt fence behind property looks ok
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 05/22/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-silt fence now installed along new clearing limlts
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 05/18/2018 Disapproved - NO FEE LFITZGERALD
Note: THIS IS A REINSPECTION-addditional 2oft was cleared behind all lots adjacent to wet land areas except Pond F and silt fence has yet to be reinstalled to these new city approved clearing limits.PLEASE install ASAP and recall this inspection in when all is installed corrrectly.
U-PROJECT STATUS (OFFICE USE) 05/18/2018 PARTIALLY APPROVED LFITZGERALD
Note: FYI-all of 2nd day bac-t testing for potable water passed excecpt for sample obtained 5-15-2018 at location #2 =water service at cul de sac on Graham Woods Place where service was very low and pvc extension pipes had to be utilized which might explain why 2nd day test failed. A re-testing for 2 complete dat to day passing will be re-obtained.
U-WATER MAIN DISINFECTION SAMPLING 05/14/2018 PARTIALLY APPROVED LFITZGERALD
Note: ist day bac-t samples obtained(Phil Story)
U-WATER MAIN DISINFECTION 05/11/2018 PARTIALLY APPROVED DSPENCER
Note: chlorine injected to system. The time to inject Chlorine is greatly increased due to the installation of services being brought to posts over 2ft to 3ft down and turned strait up vertically at the end and cut too short to clear ground in some cases. This will make correcting the service lines much more complicated they must be excavated at least 6ft back and brought to the stake Horizontal flat 1ft deep and brought to the post without excessive bends in tubing and ready to install meters. When this is to be done the inspector will need to be contacted to witness that this is done to City Utility Standards.
U-REUSE MAIN INSTALL/TESTING 05/10/2018 PARTIALLY APPROVED DSPENCER
Note: PSI tested Good well below allowable leakage 16oz loss
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 05/10/2018 PARTIALLY APPROVED DSPENCER
Note: PSI TESTED GOOD WELL BELOW ALLOWABLE WITH .75 GALLON LOSS
U-WATER SERVICE INSTALLATION 05/01/2018 APPROVED LFITZGERALD
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 04/30/2018 PARTIALLY APPROVED LFITZGERALD
Note: 8inch water main now flushed(pig) and all services flushed clean
U-REUSE MAIN INSTALL/TESTING 04/30/2018 PARTIALLY APPROVED LFITZGERALD
Note: 4inch and 6inch re-use main flushed(pig) and all services cleared clean
UC-DRAINAGE PIPE PLACEMENT/LAMPING 04/26/2018 APPROVED LFITZGERALD
Note: RCP runs for G18-G20 and G 21-G23 now all placed with compcted soils
UC-DRAINAGE STRUCT PLACMNT 04/26/2018 APPROVED LFITZGERALD
Note: ALL6 drainage structures properly placedand backfilled(G18,19.20and G21,22,23)
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 04/25/2018 CANCELLED BY APPLICANT WEB
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 04/24/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-all of 8inch water main now installed , preparing for pig testing and others
U-REUSE MAIN INSTALL/TESTING 04/24/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-remainder of 6inch re-use almost completely installed, then will prepare for pig testing along with others
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 04/13/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-Windham now installed pig launch at station 1=50, has placed 8in water main up to about 8=50 with service sadddles attached where all servicesto be fully installed wihen all re-use/water mains are in. Flushing connection re-tied in at 111=50 on Graham tr where it was reviewed with Danny and Marc (Joe and Dave) the testing procedures for re-use and water. Joe now installing water conflict resolution undr 42 in RCP
UC-DRAINAGE PIPE PLACEMENT/LAMPING 04/06/2018 PARTIALLY APPROVED LFITZGERALD
Note: 42 inch RCP now starting to be placed from MES(G-21) at pond F to curb inlet structures (G-22,23)
UC-DRAINAGE STRUCT PLACMNT 04/06/2018 PARTIALLY APPROVED LFITZGERALD
Note: Curb inlet structures G22 ,23 and G 19,20 now surveyed and RCP drainage pipe preparing to be installled to them
U-REUSE MAIN INSTALL/TESTING 04/05/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-6inch re-use now tied in to existing along Graham tr and installed up to 6x4 reducer through to end of Graham place cul de sac.
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 04/05/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-8inch water main now tied in to existing along Graham trail up to Tee and through to Grahm place cul de sac
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 03/28/2018 PARTIALLY APPROVED LFITZGERALD
Note: water valve feeding this new phase shut off by utility at Graham tr.,install to start poss tomorrrow
U-REUSE MAIN INSTALL/TESTING 03/28/2018 PARTIALLY APPROVED LFITZGERALD
Note: reuse main feeding this new phase shut off by utility at Graham tr along with the water main valve-poss start tomorrow installing depending on certain conditions
U-GRAVITY SEWER INSTALL/TESTING 03/27/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-gravity manholes 17,18,19,20, and 25 now installed
UC-CONSTRUCTION ENTRANCE 03/08/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-construction entrance now installed at Grahm trail entrance
U-GRAVITY SEWER INSTALL/TESTING 03/05/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-SSMH 23,22, and 21 now properly set with their respective service laterals one joint out. Bechtol rep. Harold contiuously on site and performing/receiving 98% compaction results for both the pipe run and the individual structures.Dry bottom has been mostly evident for the gravity sewer placement once heading from SSMH 24 to 23 and so on. I f there was any water ,a kelly well was set to keep the pipe bottom dry.
U-GRAVITY SEWER INSTALL/TESTING 02/27/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-gravity sewer now placed from existing ssmh-26 to ssmh 24 and ssmh now set correctly with 12 inches of 57 stone and all gravity sewer up to this point placed with rock under neath due to water issues. Now being all up to this point backfilled and preping for compaction testing
UC-CONSTRUCTION ENTRANCE 02/27/2018 PARTIALLY APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION-construction entrance now placed at Grahams place and rock set on side for Graham trail waiting to be installed after all dewatering etc is removed at existing manhole
UC-CONSTRUCTION ENTRANCE 02/20/2018 PARTIALLY APPROVED LFITZGERALD
Note: pipe crew now on site, spoke with Mark Hazen who is workining on installing the proper cstr. entrance at Grahams Pl. and will do the same once existing manhole that has to be connected into where dewatering pump is now located, is moved. Mark also for saftey reasoms was suggested to put up better no trespassing type signage,etc., since exisiting residents are now living close by, at both entrances and also suggested and he agreed to baffle noise of dewatering pump possibly with some plywood. Dan Spencer and Martin B also present during discussions. These entrances will require maitanence routinly depending on useage. This will be an on going inspection process.
U-GRAVITY SEWER INSTALL/TESTING 02/20/2018 PARTIALLY APPROVED LFITZGERALD
Note: pipe crew now on site ,existing SSMH-26was excavated 2/3rds down and influx of water in hole. Kellywell with another dewatering pump to be installed and will try as soon as water is under control. Met with Mark and Mike Strickland
LDSC-TREE BARRICADE 02/20/2018 APPROVED - AS NOTED WBUTLER
Note: 2/20/18 WMB There is another specimen tree that willl need to be barricaded if the silt fencing gets moved to the property line on one of the lots. Need to contact Bill Butler at 585-2198 to schedule a site meeting with the person who is staking the new silt fence location. Instructions will be given at that time to instruct where to trench and not to trench for the silt fence and the limits for the tree barricade.
U-GRAVITY SEWER INSTALL/TESTING 02/12/2018 CANCELLED BY APPLICANT LFITZGERALD
Note: no install of gravity yet,waitig for de-watering sock system to dry out conditions below, please reschedule yhis inspection when planning on actual start of pipe/structure palcement
UC-CONSTRUCTION ENTRANCE 02/12/2018 Disapproved - NO FEE LFITZGERALD
Note: THIS IS A REINSPECTION-cstr. not yet installed ,wanted to make aware that before any constuction traffic that can carry soils out of or onto this site ,this cst. entrance must be installed. i am also recommending for safety of residents and such and for your legality ,that signs be posted on each end of opening at both entrances staion something to the effect this is a construction site/no trespassinfg/permisssion to enter to keep people from entering. Once there is traffice that is or has poential to carry soils onto the residential roads, the construction entrance must be installed with in 48 hours if not sooner or a fee will be issued.and will continue until this entrance is constructed. The city is here to help and we just to make sure there is co-operation between both parties, thank you
UC-CONSTRUCTION ENTRANCE 02/09/2018 Disapproved - NO FEE LFITZGERALD
Note: construction entrance not installed at all at Graham trail/Grahams place. Graham trail will be used first. I spoke with Matt earlier in the week when he called about calling this inspection in and reminded him of the detail dimensions and follow detail per plan /utility standards which can be found on city web site. Since this sub-divsion has existing residents which will include the City Manager,this is a sensitive area and soils need to be kept off the roadways as much as achievable/possible. I recommended to Matt using cattle gates to assist the constructed entrance and a broom sweeper when necesary.This is an on going inspection and will be checked regularly and must be maintained as discused with Matt.
LDSC-TREE BARRICADE 02/09/2018 Disapproved -FEE REQUIRED WBUTLER
Note: 2/9/18 WMB Two specimen trees were to be barricaded, one on lot 68 and one on lot 22. The tree on the rear of lot 22 is far enough behind the silt fence that it does not need a barricade. The specimen oak that is on lot 68 had clearing and fill done right up to the south side of the trunk, which is a violation of the code. Need to carefully pull back and remove all fill dirt that was placed in the tree protection zone (TPZ) of this tree and erect the tree barricade per the detail on the approved plans on that side of the tree. Reinstall the silt fence outside the tree barricade to insure dirt does not wash into the TPZ. The TPZ is a distance of 1 horizontal foot from the trunk for every 1 inch of tree diameter ( a 35" oak needs to be barricaded at 35' from the trunk). Call for reinspection when this has been completed.
ROW - EROSION CONTROL / INLET PROTE/SILT FENCE 01/03/2018 PARTIALLY APPROVED LFITZGERALD
Note: this was inspected initially weeks earlier and all was satisfactory prior to clearing which has now began. Current inspection shows small area(s) where the silt fence has been compromised and should be reinstalled properly. Clearing tends to disturb some of the silt fencing which is understandable but repairs should be done in a timely manner. This is an on going inspection and will continued to be monitored.
PLAN - PRE-CON 386-986-3750 11/03/2017 APPROVED DRAMIREZ

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 10/20/2017 10/20/2017
Note: Released By: CJOHNSON
BLD COMPLETE 09/28/2017 10/02/2017
Note: Released By: JHINDMAN
DSD COMPLETE 09/28/2017 09/29/2017
Note: Released By: DRAMIREZ
ENGIN1 HOLD 09/28/2017 10/02/2017
Note: Held By: MPEEL Insufficient information for review. Apllication does not give any description of work to be performed, other than "Subdivision". Also, cannot find any record of the job street address on the property appraiser's website.
PLLA COMPLETE 09/28/2017 10/04/2017
Note: Released By: WBUTLER
UD1 COMPLETE 09/28/2017 10/04/2017
Note: Released By: LFITZGERALD

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 02/16/2018
SITE PLAN 20 ¤20.00 11/02/2017
INSPECTION 40 ¤840.00 11/02/2017
PERMIT FEE ¤125.00 11/02/2017
Fees Total Due: ¤0.00 Total Paid: ¤1,025.00