I want to search for...

Permit #2017100319

Permit Details

Status: COED

Parcel Id: 07-11-31-7015-00030-1830
CONDITIONED SPACE: 2500 sqft
GARAGE: 550 sqft
OPENED PORCH (WITH ROOF) : 306 sqft
OPENED PORCH (WITH ROOF) : 171 sqft
Total Square Footage: 3527 sqft
Block: 00030
Subdivision: 2194 - SECTION 15-COUNTRY CLUB COVE
Job Phone: 386-236-4133
Location Address: 25 CHEYENNE CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/22/2017
NOC: RECORDED
Applicant name: LEONARDO CIRO SANCLEMENTE
Owner: SIMONSON,WILLIAM & KIMBERLY

Address

7 FAIRCASTLE LN

PALM COAST, FL 32137

Lot: 1830
Contracted Stated Job Value: ¤318,921.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INTERVEST CONSTRUCTION, INC.
Status Location Address State License Number Phone
CANCEL

2379 BEVILLE RD

DAYTONA BEACH, FL 32119

CBC1261237 (Exp: 08/31/2020) 386-236-4133

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
ROBERT CRAIG KULP
Status Location Address State License Number Phone
CANCEL

5401 ENERGY AIR CT

ORLANDO, FL 32810

CAC1816317 (Exp: 08/31/2022) 407-886-3729
BARRY D MARTIN
Status Location Address State License Number Phone Fax
CANCEL

1650 N STATE STREET

Bunnell, FL 32110

CCC033728 (Exp: 08/31/2020) (386) 437-7700 (386)437-7701
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/24/2018 FINAL APPROVED WMILLER
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 07/23/2018 Disapproved -FEE REQUIRED WMILLER
Note: BOTTOM FED TANK TYPE WATER HEATERS VACUUM-RELIEF VALVE REQUIERD R, P2803.7
ROW - FINAL APRON (AFTER POUR) 07/20/2018 APPROVED RGROSS
Note: THIS IS A REINSPECTION
ROW - FINAL INSPECTION 07/20/2018 APPROVED - AS NOTED RGROSS
Note: RIGHT SIDE PROPERY LINE IS 10 FT FROM STRUCTURE. STORM WATER DRAINING IS ON ITS OWN CENTERLINE. EXISTING NEIGHBOR ENCROACHED ON NEW HOME PROPERTY WITH EXISTING VEGETATION.
FINAL SURVEY (OFFICE USE ONLY) 07/19/2018 APPROVED DREWIS
U -UTILITY RESIDENTIAL FINAL 07/13/2018 FINAL APPROVED MBACON
ROW - FINAL APRON (AFTER POUR) 07/12/2018 Disapproved -FEE REQUIRED RGROSS
Note: NOT READY FOR FINAL. SOD NOT DOWN YET
ROW- PRE-APRON (PRE-POUR) 06/29/2018 APPROVED RGROSS
Note: THIS IS A REINSPECTION. READY TO POUR
ROW- PRE-APRON (PRE-POUR) 06/28/2018 CANCELLED BY APPLICANT RGROSS
Note: THIS IS A REINSPECTION
ROW- PRE-APRON (PRE-POUR) 06/27/2018 Disapproved -FEE REQUIRED KHOWELL
Note: SPOKE WITH WILLIAM FROM I.C.I. ABOUT WHAT NEEDS TO BE FIXED. 1. ENDS OF FORM BOARDS 9" OFF THE EDGE OF PIPE 2. 2" OF CONCRETE REQUIRED OVER THE MITERED END OPENING 3. ROAD BOARD REQUIRED TO BE IN AN STRAIGHT. 4. 8' TO THE CENTER OF THE PIPE FROM EDGE OF PAVEMENT
ELECTRIC - EARLY POWER 06/19/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 3:45
LATH/BRICK/ WATER BARRIER 04/10/2018 APPROVED WMILLER
Note: THIS IS A REINSPECTION
LATH/BRICK/ WATER BARRIER 04/09/2018 Disapproved -FEE REQUIRED WMILLER
Note: WEATHER RESISTANT BARRIER (TYVEC/etc.) OVERLAP AT WOOD TO BLOCK INTERSECTION PER MANUFACTURER SPECS AND ASTM SPECS
INSULATION 04/05/2018 APPROVED CMINI
ALL ROUGH 04/02/2018 APPROVED CMINI
Note: THIS IS A REINSPECTION
ALL ROUGH 03/29/2018 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION 1. NEED TO PHASE OUT HOT CONDUCTORS IN PANEL BOX. NEC.210.5(C).. 2. SEAL TUB BOX IN BACK BATH 3. BOX OUT OURND RANGE VENT (OUT OF WALL)
ELECTRIC-TUG 03/28/2018 APPROVED - AS NOTED CMINI
Note: called fpl to release power
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/28/2018 APPROVED CMINI
Note: THIS IS A REINSPECTION
ROOF VALLEY & METAL 03/28/2018 APPROVED CMINI
WALL SHEATHING 03/28/2018 APPROVED CMINI
Note: THIS IS A REINSPECTION
WALL SHEATHING 03/27/2018 Disapproved - NO FEE CMINI
Note: THIS IS A REINSPECTION. need city approved plans on site
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/27/2018 Disapproved -FEE REQUIRED CMINI
Note: THIS IS A REINSPECTION, loose sheathing at garage, missing plywood clips in master, no city approved plans, incomplete inspection.
U - SEWER TIE IN 03/27/2018 APPROVED JNICHOLS
GRAVITY SEWER TEST 03/27/2018 APPROVED CMINI
ALL ROUGH 03/27/2018 Disapproved - NO FEE CMINI
Note: can not call in all rough until roof sheathing has passed inspection
WALL SHEATHING 03/13/2018 Disapproved - NO FEE WMILLER
Note: MISSING FASTENERS AS REQUIRED
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/13/2018 Disapproved -FEE REQUIRED WMILLER
Note: 1. NEED TO COMPLETE GABLES TO SPECS (SEE SPECS) 2. TRUSS BLOCKING REQUIRED WHERE SHEATHING SPANS MORE THAN 24 inches.
TIE BEAM / LINTEL 02/14/2018 APPROVED CMINI
ELEV CERT-FOUNDATION APPROVAL 02/14/2018 APPROVED DRAMIREZ
FOUND SURVEY APPROVED (OFFICE) 02/08/2018 APPROVED JHINDMAN
MONOLITHIC SLAB 01/25/2018 APPROVED CMINI
Note: THIS IS A REINSPECTION
MONOLITHIC SLAB 01/24/2018 Disapproved -FEE REQUIRED WMILLER
Note: THIS IS A REINSPECTION (NEED NEW COMPACTION REPROT FOR AREAS OF ADDED FILL AS REQUESTED PRIOR) 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE 26 R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE (NEED ADDITIONAL COMPACTION REPORT FOR AREAS OUTSIDE OF FOOTINGS AFTER ADDING REQUIRED MINIMUM DEPTH)
MONOLITHIC SLAB 01/23/2018 Disapproved -FEE REQUIRED WMILLER
Note: 1. VAPOR BARRIER NOT COMPLET.(MISSING LEFT SIDE NEAR PLUMBING) 2. CLEARANCE ON REBAR FROM EARTH 3 1D FBC R404.1.2.3.7.4 3. 12 inch MINIMUM DEPTH , UNDISTURBED GROUND SURFACE 26 R403.1.3.4 and in accordance with R401.2, and R403.1 ALL FOOTINGS SHALL BE PLACED AT LEAST 12 in. BELOW THE UNDISTURBED GROUND SURFACE (NEED ADDITIONAL COMPACTION REPORT FOR AREAS OUTSIDE OF FOOTINGS AFTER ADDING REQUIRED MINIMUM DEPTH)
PLUMBING 1ST ROUGH UNDERGROUND 01/16/2018 APPROVED - AS NOTED JGIBSON
Note: CHECK FOR ROUGH-IN ONLY L/T AT ALL ROUGH

Review History

Department Status Date In Date Out
PLFM COMPLETE 07/17/2018 07/17/2018
Note: Released By: JMYERS The Final elevation certificate submitted has been deemed acceptable.
SW1 COMPLETE 07/17/2018 07/17/2018
Note: Released By: DREWIS
PLFM HOLD 07/13/2018 07/13/2018
Note: Held By: JMYERS The elevation certificate provided is contradicting itself. Under C1. The Building Under Construction box is marked, however on pages 5 and 6 there are Final pictures submitted. Please clarify if this is a Building elevation certificate or a Final elevation certificate. As of 6/6/18 new FEMA FIRM have taken effect and need to be reflected on the elevation certificate as well as the survey provided. Under C2.e you have and elevation of 10.07 and in Section D you state that it is the pool pump. This machinery does not qualify as (Machinery or equipment servicing the building). An example of this equipment would be an A/C or a generator.
SW1 HOLD 07/13/2018 07/16/2018
Note: Held By: DREWIS Swale does not provided flow in the direction of the approved swale plan diagram. Daniel Rewis 986-4736
PLFM COMPLETE 02/13/2018 02/13/2018
Note: Released By: DRAMIREZ
SW1 COMPLETE 02/08/2018 02/08/2018
Note: Released By: JHINDMAN foundation s
PLFM COMPLETE 11/16/2017 11/16/2017
Note: Released By: DBEVAN The elevation certificate has been deemed sufficient at this stage, "construction drawings".
PLENV COMPLETE 11/13/2017 11/14/2017
Note: Released By: DBEVAN The provided After Action documentation for gopher tortoise relocation has been deemed sufficient.
PLFM HOLD 11/13/2017 11/16/2017
Note: Held By: DBEVAN Per previous comments, provide an updated elevation certificate.
SW1 COMPLETE 11/13/2017 11/15/2017
Note: Released By: DREWIS
PLENV HOLD 11/03/2017 11/03/2017
Note: Held By: DBEVAN The City will release the permit once the gopher tortoise relocation has been performed and the after action report has been approved by FWC. Please provide a copy of the FWC relocation permit when you have received it. Once the relocation has been completed, please provide the after action report.
SW1 HOLD 11/03/2017 11/08/2017
Note: Held By: DREWIS Please provide additional proposed measurements in the front and rear of residence in accordance with FBC R401.3. D. Rewis 986-4736
PLFM HOLD 11/03/2017 11/06/2017
Note: Held By: DBEVAN The provided elevation certificate was not electronically sealed and could be altered by City staff. Provide a signed and sealed elevation certificate or electronically locked version with the following corrections. Section A3. Close parenthesis on Tax Parcel information. Sections A8 a), b), and c) shall reflect “N/A” since there are no crawlspace or enclosures. Section A8 d) shall have “No” box checked C2 elevations shall be consistent with the datum utilized for the Flood Insurance Rate Maps which is NGVD 1929. Please confirm that the provided elevations for all fields are provided in the same datum. Sections C2 for b), c), and h) should not have a measurement box checked since an elevation is not applicable. Section D sign and seal box shall have the signature on top of the seal. The provided survey general calls out the flood zones but does not provide a boundary limit. Provide the limits of the zone(s) on a revised survey. Note: In Section D, notes reflect that the improvements are in the “X” zone. An elevation certificate will also be required at the next stage of development, “Building Under Construction” to verify. Depending on the nature of the improvements, a “Finished Construction” elevation certificate may not be required but will be determined after reviewing the “Building Under Construction” elevation certificate. If a “Finished Construction” elevation certificate is required, a hard copy of the document shall be provided prior to CO.
ZON COMPLETE 10/31/2017 10/31/2017
Note: Released By: TAWILLIAMS
PLENV HOLD 10/18/2017 10/18/2017
Note: Held By: DBEVAN Staff is aware that active gopher tortoise burrow(s) are located within the project area. Provide a site plan that depicts the burrow location and a 25-foot setback radius from burrow entrance. Also, provide a brief narrative of how the occurrence is being addressed.
PLFM HOLD 10/09/2017 10/11/2017
Note: Held By: DRAMIREZ This property is falling within two different flood zones AE and X zone. Currently the structure does not appear to touch the AE zone however we are requiring an elevation certificate prior to construction and at building to assure that the structure will not fall in any portion of the AE zone. With that said, please provide an elevation certificate for review.
BLD COMPLETE 10/06/2017 10/13/2017
Note: Released By: FREODICA
ELEC COMPLETE 10/06/2017 10/09/2017
Note: Released By: DREWIS
ENGIN1 COMPLETE 10/06/2017 10/23/2017
Note: Released By: TBAKER
MECH COMPLETE 10/06/2017 10/13/2017
Note: Released By: FREODICA
PLUM COMPLETE 10/06/2017 10/13/2017
Note: Released By: FREODICA
SW1 HOLD 10/06/2017 10/09/2017
Note: Held By: DREWIS Provide a site plan with proposed survey measurements depicting storm water flow in addition to the proposed grade at the foundation walll and 10' away from foundation wall per FBC R401.3. D. Rewis 986-4736
UD1 COMPLETE 10/06/2017 10/10/2017
Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON HOLD 10/06/2017 10/09/2017
Note: Held By: TAWILLIAMS 1)Need to idenify the type of existing 22" palm tree on landscape plan. 2) Shutters on front of house per the LDC 13.03 D1(b) shutters shall match the height of window

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/24/2018
REINSPECTION FEE ¤40.00 07/24/2018
REINSPECTION FEE ¤40.00 07/24/2018
REINSPECTION FEE ¤40.00 07/24/2018
REINSPECTION FEE ¤40.00 07/24/2018
REINSPECTION FEE ¤40.00 07/24/2018
REINSPECTION FEE ¤40.00 07/24/2018
REINSPECTION FEE ¤40.00 07/24/2018
REINSPECTION FEE ¤40.00 07/24/2018
NEW RESIDENTIAL INSPECTIONS ¤638.00 11/22/2017
SITE PLAN 20 ¤20.00 11/22/2017
SURCHARGE FS 533.721 ¤15.60 11/22/2017
SURCHARGE - FS 468.631 ¤23.40 11/22/2017
STORM WATER PERMIT FEES ¤80.00 11/22/2017
3% TRANS IMPACT FEE CREDIT (¤93.74) 11/22/2017
ADMIN FEE ¤20.00 11/22/2017
ELECTRIC FEE ¤251.40 11/22/2017
3% FIRE IMPACT FEE CREDIT (¤6.56) 11/22/2017
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 11/22/2017
IMPACT FEE PARKS ¤849.24 11/22/2017
IMPACT FEE SCHOOL ¤3,600.00 11/22/2017
IMPACT FEE TRANSPORTATION ¤3,124.67 11/22/2017
MECHANICAL FEE ¤251.40 11/22/2017
3% PARKS IMPACT FEE CREDIT (¤25.48) 11/22/2017
PLAN CHECK FEE ¤127.60 11/22/2017
PLUMBING FEE ¤251.40 11/22/2017
Fees Total Due: ¤0.00 Total Paid: ¤9,705.72