I want to search for...

Permit #2017100441

Permit Details

Status: COED

Parcel Id: 16-11-31-1260-00000-0450
CONDITIONED SPACE: 2745 sqft
GARAGE: 668 sqft
OPENED PORCH (WITH ROOF) : 126 sqft
OPENED PORCH (WITH ROOF) : 372 sqft
Total Square Footage: 3911 sqft
Block: 00000
Subdivision: 2081 - Creekside Village at Grand Haven
Job Phone: 386-236-4133
Location Address: 26 CREEKSIDE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/13/2017
NOC: RECORDED
Applicant name: LEONARDO CIRO SANCLEMENTE
Owner: PANELLINO, CHARLES & CLARISSE

Address

45 HOFSTRA DR

SMITHTOWN, NY 11787

Lot: 0450
Contracted Stated Job Value: ¤410,634.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INTERVEST CONSTRUCTION, INC.
Status Location Address State License Number Phone
CANCEL

2379 BEVILLE RD

DAYTONA BEACH, FL 32119

CBC1261237 (Exp: 08/31/2020) 386-236-4133

Sub Contractors

STEPHEN COURTEAUX
Status Location Address State License Number Phone Fax
ACTIVE

85 North Yonge Street

Ormond Beach, FL 32174

EC13001748 (Exp: 08/31/2026) (386) 672-4900 386-676-7472
ROBERT CRAIG KULP
Status Location Address State License Number Phone
CANCEL

5401 ENERGY AIR CT

ORLANDO, FL 32810

CAC1816317 (Exp: 08/31/2022) 407-886-3729
JEFFREY DALE KNIGHT
Status Location Address State License Number Phone Fax
INACTIVE

923 ASHMEADE CT

PORT ORANGE, FL 32127

CFC057351 (Exp: 08/31/2026) 386-345-3857 386-345-4443
BARRY D MARTIN
Status Location Address State License Number Phone Fax
CANCEL

1650 N STATE STREET

Bunnell, FL 32110

CCC033728 (Exp: 08/31/2020) (386) 437-7700 (386)437-7701
KEN DEPRINZIO
Status Location Address State License Number Phone Fax
ACTIVE

325 WALKER STREET

HOLLY HILL, FL 32117

11351 (Exp: 08/31/2026) 386-672-8494 386-673-7856

Inspection History

Type Request Date Result Inspector
ROW - FINAL INSPECTION 06/04/2018 APPROVED RGROSS
BLD - BUILDING FINAL 06/01/2018 FINAL APPROVED CMINI
Note: THIS IS A REINSPECTION
BLD - BUILDING FINAL 05/31/2018 Disapproved -FEE REQUIRED WMILLER
Note: 1. seal around range hood and hood for future grill 2. lighting at rear door not working 3. missing hall lights 4. seal space around pipes in walls and ceilings (check all) 5. seal walls at elivated air handler 6. seal liquid lines at same location 7. lights in jack and jill bath need bulbs install outlet at master bath counter by shower
FINAL SURVEY (OFFICE USE ONLY) 05/30/2018 APPROVED DREWIS
U -UTILITY RESIDENTIAL FINAL 05/24/2018 FINAL APPROVED DSPENCER
ROW - FINAL APRON (AFTER POUR) 05/24/2018 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 05/14/2018 APPROVED RGROSS
Note: THIS IS A REINSPECTION. READY TO POUR
PROJECT STATUS (OFFICE USE) 05/09/2018 APPROVED KHOWELL
Note: WILLIAM WITH I.C.I. CALLED AND WANTED ME TO LOOK AT THE MIAMI CURB FOR REPAIRS
ROW- PRE-APRON (PRE-POUR) 05/03/2018 PARTIALLY APPROVED RGROSS
Note: THIS IS A REINSPECTION. APPROVED FOR APRON POUR ONLY. PAVER DRIVEWAY. UPPER RESTRAINTS NOT FORMED.
ROW- PRE-APRON (PRE-POUR) 05/01/2018 CANCELLED BY APPLICANT KHOWELL
Note: WILLIAM WITH ICI CALLED TO CANCELL
ELECTRIC - EARLY POWER 04/24/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 2:40
LATH/BRICK/ WATER BARRIER 03/19/2018 APPROVED WMILLER
Note: THIS IS A REINSPECTION
LATH/BRICK/ WATER BARRIER 03/16/2018 CANCELLED BY APPLICANT WMILLER
INSULATION 03/09/2018 APPROVED DROCKWELL
GAS ROUGH 03/09/2018 APPROVED DROCKWELL
ALL ROUGH 03/07/2018 APPROVED - AS NOTED WMILLER
Note: need gas riser diagram by insulation
U - SEWER TIE IN 03/06/2018 APPROVED LFITZGERALD
Note: THIS IS A REINSPECTION
U - SEWER TIE IN 03/02/2018 CANCELLED BY APPLICANT MBACON
ROOF VALLEY & METAL 03/02/2018 APPROVED WMILLER
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/02/2018 APPROVED WMILLER
Note: THIS IS A REINSPECTION
ROOF SHEATHING 03/02/2018 CANCELLED BY INSPECTOR WMILLER
GRAVITY SEWER TEST 03/02/2018 APPROVED JGIBSON
ROOF VALLEY & METAL 02/28/2018 CANCELLED BY APPLICANT WMILLER
WALL SHEATHING 02/28/2018 APPROVED WMILLER
Note: THIS IS A REINSPECTION
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/28/2018 CANCELLED BY APPLICANT WMILLER
WALL SHEATHING 02/22/2018 CANCELLED BY APPLICANT DROCKWELL
ELECTRIC-TUG 02/07/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED TUG POWER 3:45
TIE BEAM / LINTEL 01/30/2018 APPROVED CMINI
FOUND SURVEY APPROVED (OFFICE) 01/29/2018 APPROVED DREWIS
MONOLITHIC SLAB 01/16/2018 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 01/09/2018 APPROVED - AS NOTED JGIBSON
Note: REVISION FOR ''VTR'' ON MASTER VANITIES, BUT ''AAV'' ARE BEING USED

Review History

Department Status Date In Date Out
SW1 COMPLETE 05/30/2018 05/30/2018
Note: Released By: DREWIS
SW1 HOLD 05/24/2018 05/25/2018
Note: Held By: DREWIS final s Provide grade elevations at the foundation in addition to 10' away from the foundation per FBC 6th ed. R401.3 Daniel Rewis 986-4736
SW1 COMPLETE 01/25/2018 01/29/2018
Note: Released By: DREWIS foundation survey
PLUM CANCEL 01/18/2018 01/23/2018
Note: Revision: changed sanitary riser diagram. Owner's bathroom group vent through the roof was changed to air admittance valve.
SW1 COMPLETE 11/03/2017 11/08/2017
Note: Released By: DREWIS
ELEC COMPLETE 11/03/2017 11/08/2017
Note: Released By: DREWIS
PLUM COMPLETE 11/03/2017 11/08/2017
Note: Released By: FREODICA
BLD COMPLETE 10/10/2017 10/19/2017
Note: Released By: FREODICA
ELEC HOLD 10/10/2017 10/16/2017
Note: Held By: DREWIS Provide signature and seal of designer or the signature and license number of the elctrical contractor on load calculations and plans, FBC 107.1. Provide a disconnect for the AHU, NEC 2011 440.14. D. Rewis 986-4736
ENGIN1 COMPLETE 10/10/2017 10/12/2017
Note: Released By: TBAKER
MECH COMPLETE 10/10/2017 10/19/2017
Note: Released By: FREODICA
PLUM HOLD 10/10/2017 10/19/2017
Note: Held By: FREODICA Held By: FREODICA Provide signature and license number of gas contractor on gas riser diagram per FBC 5th ed. 107.1. F.Reodica -386-986-4734.
SW1 HOLD 10/10/2017 10/16/2017
Note: Held By: DREWIS Please provide proposed survey measurements at foundation wall and 10' away from foundation wall of residence to assure compliance with FBC R401.3. D. Rewis 986-4736
UD1 COMPLETE 10/10/2017 10/13/2017
Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind
ZON COMPLETE 10/10/2017 10/10/2017
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REVISION ¤40.00 06/01/2018
REINSPECTION FEE ¤40.00 06/01/2018
NEW RESIDENTIAL INSPECTIONS ¤822.00 11/13/2017
SITE PLAN 20 ¤20.00 11/13/2017
SURCHARGE FS 533.721 ¤19.46 11/13/2017
SURCHARGE - FS 468.631 ¤29.19 11/13/2017
STORM WATER PERMIT FEES ¤80.00 11/13/2017
3% TRANS IMPACT FEE CREDIT (¤93.74) 11/13/2017
ADMIN FEE ¤20.00 11/13/2017
ELECTRIC FEE ¤306.60 11/13/2017
3% FIRE IMPACT FEE CREDIT (¤6.56) 11/13/2017
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 11/13/2017
IMPACT FEE PARKS ¤849.24 11/13/2017
IMPACT FEE SCHOOL ¤3,600.00 11/13/2017
IMPACT FEE TRANSPORTATION ¤3,124.67 11/13/2017
MECHANICAL FEE ¤306.60 11/13/2017
3% PARKS IMPACT FEE CREDIT (¤25.48) 11/13/2017
PLAN CHECK FEE ¤164.40 11/13/2017
PLUMBING FEE ¤306.60 11/13/2017
Fees Total Due: ¤0.00 Total Paid: ¤9,821.77