Permit #2017100941

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00010-0140
CONDITIONED SPACE: 1924 sqft
CONDITIONED SPACE: 582 sqft
CONDITIONED SPACE: 269 sqft
GARAGE: 499 sqft
OPENED PORCH (WITH ROOF) : 421 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
Total Square Footage: 3786 sqft
Block: 00010
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 863-420-2100
Location Address: 27 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/08/2017
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0140
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/21/2019 FINAL APPROVED MWILLIAMS
U-CROSS CONNECTION 02/07/2019 APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 02/07/2019 APPROVED KHOWELL
ROW - FINAL INSPECTION 02/07/2019 FINAL APPROVED KHOWELL
U -UTILITY RESIDENTIAL FINAL 02/07/2019 FINAL APPROVED LFITZGERALD
Note: Note: builder contacted utility regarding water meter pit being too low and a work order has been placed.
FINAL SURVEY (OFFICE USE ONLY) 02/01/2019 APPROVED JHINDMAN
ROW- PRE-APRON (PRE-POUR) 01/22/2019 APPROVED KHOWELL
ROW- PRE-APRON (PRE-POUR) 01/18/2019 PARTIALLY APPROVED KHOWELL
Note: SIDEWALK AND APRON POUR, PAVER UPPER DRIVEWAY.
U - SEWER TIE IN 01/15/2019 APPROVED - AS NOTED JGIBSON
Note: UTILITY MADE U-TIE DUE TO DEPTH OF TAP
GRAVITY SEWER TEST 01/15/2019 APPROVED JGIBSON
ROOF SHEATHING 12/12/2018 Disapproved - NO FEE MWILLIAMS
Note: This roof at 27 New Leatherwood is tiled and passed previous inspection. This may have been called in on wrong address.
ELECTRIC - EARLY POWER 12/10/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 2:20
ELECTRIC - EARLY POWER 11/28/2018 Disapproved -FEE REQUIRED RMARTIN
Note: OUTLET IN 2ND FLOOR BED ROOM NOT SAFED OFF, COVERED BY DRYWALL, CIRCLED ON UN-APPROVED SET OF PLANS, NEED PERMITED SET OF PLANS ON SITE
LATH/BRICK/ WATER BARRIER 10/18/2018 APPROVED CMINI
ELECTRIC-TUG 10/02/2018 APPROVED - AS NOTED CMINI
Note: called Susan from fpl to release power
INSULATION 10/02/2018 APPROVED CMINI
ALL ROUGH 09/27/2018 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/19/2018 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/14/2018 Disapproved -FEE REQUIRED CMINI
Note: need continuous load path 2nd fl to foundation
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/07/2018 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 08/17/2018 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/10/2018 CANCELLED BY APPLICANT CMINI
ROOF SHEATHING 08/06/2018 APPROVED DROCKWELL
TIE BEAM / LINTEL 06/12/2018 APPROVED DROCKWELL
TIE BEAM / LINTEL 06/11/2018 Disapproved -FEE REQUIRED WMILLER
Note: NEED APPROVED PLANS ON SITE.... DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL
MONOLITHIC SLAB 05/11/2018 APPROVED CMINI
MONOLITHIC SLAB 05/09/2018 Disapproved -FEE REQUIRED CMINI
Note: interior footers calling for 3#5 rebar per plan, also need to form where needed
PLUMBING 1ST ROUGH UNDERGROUND 05/03/2018 APPROVED JGIBSON
FOUND SURVEY APPROVED (OFFICE) 03/21/2018 APPROVED DREWIS
FOOTER 01/26/2018 APPROVED CMINI
ELECTRIC TEMP POLE 01/03/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED TEMP POLE 3:10

Review History

Department Status Date In Date Out
SW1 COMPLETE 01/29/2019 02/01/2019
Note: Released By: JHINDMAN Final S
SW1 COMPLETE 03/20/2018 03/21/2018
Note: Released By: DREWIS foundation s
MECH COMPLETE 12/01/2017 12/01/2017
Note: Released By: JHINDMAN
SW1 COMPLETE 11/14/2017 11/16/2017
Note: Released By: DREWIS
MECH HOLD 11/14/2017 11/17/2017
Note: Held By: RLEE 2nd review 1. Insulation R-value for exterior wood frame shown on energy calculation does not comply with FBCEC 5th ed. R402.1.1. 2. Energy calculation shall be coordinated with plans for roofing material and attic ventiilation/insulation for clarity per FBC 5th ed. 107.2.1. 3. Provide equipment sizing calculation, manufacturer and model number of selected hvac units per FBCEC 5th ed. R403.6.1. F.Reodica -386-986-4734.
BLD COMPLETE 11/14/2017 11/17/2017
Note: Released By: RLEE
ZON COMPLETE 11/14/2017 11/15/2017
Note: Released By: TAWILLIAMS
BLD HOLD 10/20/2017 10/27/2017
Note: Held By: FREODICA Provide readable truss plan from truss manufacturer per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734.
ELEC COMPLETE 10/20/2017 10/23/2017
Note: Released By: DREWIS
ENGIN1 COMPLETE 10/20/2017 10/23/2017
Note: Released By: TBAKER
MECH HOLD 10/20/2017 10/27/2017
Note: Held By: FREODICA 1. Insulation R-value for exterior wood frame shown on energy calculation does not comply with FBCEC 5th ed. R402.1.1. 2. Energy calculation shall be coordinated with plans for roofing material and attic ventiilation/insulation for clarity per FBC 5th ed. 107.2.1. 3. Provide equipment sizing calculation, manufacturer and model number of selected hvac units per FBCEC 5th ed. R403.6.1. F.Reodica -386-986-4734.
PLUM COMPLETE 10/20/2017 10/27/2017
Note: Released By: FREODICA
SW1 HOLD 10/20/2017 10/23/2017
Note: Held By: DREWIS Please provide a proposed site plan with measurements per FBC R401.3. D. Rewis 986-4736
UD1 COMPLETE 10/20/2017 10/31/2017
Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON COMPLETE 10/20/2017 10/23/2017
Note: Released By: TAWILLIAMS

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 02/07/2019
REINSPECTION FEE ¤40.00 02/07/2019
REINSPECTION FEE ¤40.00 02/07/2019
REINSPECTION FEE ¤40.00 02/07/2019
NEW RESIDENTIAL INSPECTIONS ¤698.00 12/08/2017
SITE PLAN 20 ¤20.00 12/08/2017
SURCHARGE FS 533.721 ¤16.86 12/08/2017
SURCHARGE - FS 468.631 ¤25.29 12/08/2017
STORM WATER PERMIT FEES ¤80.00 12/08/2017
3% TRANS IMPACT FEE CREDIT (¤93.74) 12/08/2017
ADMIN FEE ¤20.00 12/08/2017
ELECTRIC FEE ¤269.40 12/08/2017
3% FIRE IMPACT FEE CREDIT (¤6.56) 12/08/2017
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 12/08/2017
IMPACT FEE PARKS ¤849.24 12/08/2017
IMPACT FEE SCHOOL ¤3,600.00 12/08/2017
IMPACT FEE TRANSPORTATION ¤3,124.67 12/08/2017
MECHANICAL FEE ¤269.40 12/08/2017
3% PARKS IMPACT FEE CREDIT (¤25.48) 12/08/2017
PLAN CHECK FEE ¤139.60 12/08/2017
PLUMBING FEE ¤269.40 12/08/2017
Fees Total Due: ¤0.00 Total Paid: ¤9,634.87