I want to search for...

Permit #2017101333

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00020-0060
CONDITIONED SPACE: 2443 sqft
CONDITIONED SPACE: 269 sqft
OPENED PORCH (WITH ROOF) : 442 sqft
OPENED PORCH (WITH ROOF) : 91 sqft
GARAGE: 764 sqft
Total Square Footage: 4009 sqft
Block: 00020
Subdivision: 2108 - Hidden Lakes- Phase II-Toscana
Job Phone: 863-420-2100
Location Address: 20 NEW WATER OAK DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/21/2017
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0060
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

TERRY HILE BURD
Status Location Address State License Number Phone Fax
INACTIVE

PO Box 180308

CASSELBERRY, FL 32707

CAC1814423 (Exp: 08/31/2024) (407) 831-3600 (407)831-2893
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
SANTOS L HERNANDEZ
Status Location Address State License Number Phone Fax
ACTIVE

946 SHADDICK DRIVE

ORANGE CITY, FL 32763

CCC1328011 (Exp: 08/31/2026) 386-218-4942 386-218-4937
JOSEPH H STRADA JR
Status Location Address State License Number Phone
CANCEL

3400 ST JOHNS PKWY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2022) 877-906-1113

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 10/04/2018 FINAL APPROVED WMILLER
Note: DEFICIENCIES NOTED BY INSPECTOR CM, AT PRIOR INSPECTION RESOLVED
BLD - BUILDING FINAL 10/03/2018 Disapproved -FEE REQUIRED CMINI
Note: missing intersystem bonding, NEC 250.94.. A/C condensor pad needs to be level.M1305.1.4.1 ..GFCI receptacle needed in laundry within 6' of laundry tub. kitchen sill missing. hole in wall at double oven, exposed wires at range hood. not ready
TUB SET 10/03/2018 APPROVED CMINI
BLD - BUILDING FINAL 10/02/2018 CANCELLED BY APPLICANT WEB
U-CROSS CONNECTION 10/02/2018 APPROVED LFITZGERALD
ROW - FINAL APRON (AFTER POUR) 10/02/2018 APPROVED KHOWELL
ROW - FINAL INSPECTION 10/02/2018 FINAL APPROVED KHOWELL
Note: SOD WILL BE FINISHED TODAY
U -UTILITY RESIDENTIAL FINAL 10/02/2018 FINAL APPROVED LFITZGERALD
FINAL SURVEY (OFFICE USE ONLY) 09/26/2018 APPROVED DREWIS
ELECTRIC - EARLY POWER 09/20/2018 APPROVED - AS NOTED CMINI
Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 3:20
ROW- PRE-APRON (PRE-POUR) 09/17/2018 APPROVED KHOWELL
ROW- PRE-APRON (PRE-POUR) 09/12/2018 PARTIALLY APPROVED KHOWELL
Note: SIDEWALK AND APRON ONLY, PAVER DRIVEWAY. DAMAGED CURB AND GUTTER ON THE LEFT SIDE OF THE APRON WILL NEED TO BE REPLACED BEFORE FINAL INSPECTION
U - SEWER TIE IN 09/06/2018 APPROVED LFITZGERALD
GRAVITY SEWER TEST 09/06/2018 APPROVED JGIBSON
TIE BEAM / LINTEL 08/20/2018 APPROVED - AS NOTED CMINI
Note: fill in at courtyard
LATH/BRICK/ WATER BARRIER 08/09/2018 APPROVED CMINI
INSULATION 07/30/2018 APPROVED CMINI
INSULATION 07/27/2018 Disapproved -FEE REQUIRED CMINI
Note: not ready
ALL ROUGH 07/25/2018 APPROVED - AS NOTED CMINI
Note: strap service entrance cable at panel 12" from enclosure. nail plates on electric still missing 2, pointed out areas
ELECTRIC-TUG 07/25/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO FPL RELEASED TUG 3:05
GAS ROUGH 07/25/2018 APPROVED CMINI
ELECTRIC-TUG 07/24/2018 Disapproved -FEE REQUIRED CMINI
Note: no breaker for temp outlet in panel, outlet not temp ready. ground wire not connected to ufer. not ready
ALL ROUGH 07/24/2018 CANCELLED BY APPLICANT CMINI
ALL ROUGH 07/20/2018 Disapproved -FEE REQUIRED CMINI
Note: strap service entrance cable at panel 12" from enclosure. 10' head pressure missing, nail plates at range vent both sides,nail plates on electric, pointed out areas, complete electric box for alarm panel. bond gas line.revision for fire place and gas on site. nut loose at garage buck.
ROOF VALLEY & METAL 07/19/2018 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/18/2018 APPROVED CMINI
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/12/2018 Disapproved -FEE REQUIRED WMILLER
Note: TO MANY DEFICIENT ITEMS, INSPECTION STOPPED, INCOMPLETE LIST, MISSING STRAPS STRAPS NOT NAILED GABLE END BRACING MISSING AND SPLIT OUT NAILS ON GARAGE GABLE X - BRACING CONTINUOUS LOAD PATH 26 R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH
ROOF SHEATHING / BRACES/TIES/DOWN CELL 07/06/2018 Disapproved -FEE REQUIRED WMILLER
Note: TO MANY DEFICIENT ITEMS, INSPECTION STOPPED, INCOMPLETE LIST, MISSING STRAPS STRAPS NOT NAILED GABLE END BRACING MISSING AND SPLIT OUT NAILS ON GARAGE GABLE X - BRACING CONTINUOUS LOAD PATH 26 R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH
ROOF SHEATHING 05/31/2018 APPROVED CMINI
TIE BEAM / LINTEL 05/30/2018 CANCELLED BY INSPECTOR CMINI
Note: already done
ROOF SHEATHING 05/24/2018 Disapproved -FEE REQUIRED CMINI
Note: not nailed per plan
TIE BEAM / LINTEL 05/11/2018 APPROVED CMINI
FOUND SURVEY APPROVED (OFFICE) 04/26/2018 APPROVED DREWIS
MONOLITHIC SLAB 03/21/2018 APPROVED CMINI
MONOLITHIC SLAB 03/19/2018 Disapproved -FEE REQUIRED CMINI
Note: not ready, vapor retarder not installed correctly
PLUMBING 1ST ROUGH UNDERGROUND 03/09/2018 APPROVED JGIBSON
FOOTER 02/12/2018 APPROVED CMINI
Note: THIS IS A REINSPECTION
FOOTER 02/09/2018 Disapproved -FEE REQUIRED CMINI
Note: not ready

Review History

Department Status Date In Date Out
SW1 COMPLETE 09/25/2018 09/26/2018
Note: Released By: DREWIS final s
BLD COMPLETE 07/13/2018 07/16/2018
Note: Released By: JHINDMAN
BLD HOLD 07/06/2018 07/06/2018
Note: Held By: JHINDMAN 1. Identify the location of the ventless fireplace and provide manufacturers specifications. 6th ed. FBC 107.3.5. J. Hindman 986-3784.
PLUM COMPLETE 07/02/2018 07/06/2018
Note: Released By: JHINDMAN
SW1 COMPLETE 04/25/2018 04/26/2018
Note: Released By: DREWIS foundation survey
ELEC COMPLETE 12/15/2017 12/18/2017
Note: Released By: DREWIS
MECH COMPLETE 12/15/2017 12/19/2017
Note: Released By: JHINDMAN
ELEC HOLD 11/29/2017 12/04/2017
Note: Held By: DREWIS Please provide a receptacle for front bedroom behind door swing, NEC 2011 210.52A. Daniel Rewis 986-4736
MECH HOLD 11/29/2017 12/05/2017
Note: Held By: JHINDMAN Coordinate roofing material on energy calculation with plans and product approval per FBC 5th ed. 107.2.1 3nd request. J. hindman 986-3784. Your energy calculations show shingles for the roof . the product approvals are for tile.
ZON COMPLETE 11/14/2017 11/15/2017
Note: Released By: TAWILLIAMS
ELEC HOLD 11/14/2017 11/16/2017
Note: Held By: DREWIS Corrected electrical plan not submitted. Daniel Rewis 986-4736
SW1 COMPLETE 11/14/2017 11/16/2017
Note: Released By: DREWIS
MECH HOLD 11/14/2017 11/27/2017
Note: Held By: JHINDMAN Coordinate roofing material on energy calculation with plans and product approval per FBC 5th ed. 107.2.1 2nd request. J. hindman 986-3784.
BLD COMPLETE 10/31/2017 11/06/2017
Note: Released By: FREODICA
ELEC HOLD 10/31/2017 11/01/2017
Note: Held By: DREWIS Please provide a receptacle for front bedroom behind door swing, NEC 2011 210.52A. Please provide the signature of the electrical contractor on the load calculations, FBC 107.1. D. Rewis 986-4736
ENGIN1 COMPLETE 10/31/2017 10/31/2017
Note: Released By: TBAKER
MECH HOLD 10/31/2017 11/06/2017
Note: Held By: FREODICA 1. Provide signature of owner/agent on energy calculation per FBCEC R405.4.2. 2. Provide hesting/cooling equipment summary per FBCEC 5th ed. R403.6. 3. Coordinate roofing material on energy calculation with plans and product approval per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734.
PLUM COMPLETE 10/31/2017 11/06/2017
Note: Released By: FREODICA
SW1 HOLD 10/31/2017 11/01/2017
Note: Held By: DREWIS Please provide proposed measurements in accordance with FBC R401.3. D. Rewis 986-4736
UD1 COMPLETE 10/31/2017 11/07/2017
Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
ZON HOLD 10/31/2017 10/31/2017
Note: Held By: AMOBLEY This lot has two F.I.R.M. panel numbers. Please provide both on site plan

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 10/04/2018
REINSPECTION FEE ¤40.00 09/05/2018
REINSPECTION FEE ¤40.00 09/05/2018
REINSPECTION FEE ¤40.00 07/24/2018
REVISION ¤40.00 07/24/2018
REVISION ¤40.00 07/12/2018
REINSPECTION FEE ¤40.00 07/12/2018
REINSPECTION FEE ¤40.00 07/12/2018
REINSPECTION FEE ¤40.00 07/12/2018
REINSPECTION FEE ¤40.00 07/12/2018
REINSPECTION FEE ¤40.00 03/08/2018
ADMIN FEE ¤20.00 12/21/2017
ELECTRIC FEE ¤272.40 12/21/2017
3% FIRE IMPACT FEE CREDIT (¤6.56) 12/21/2017
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 12/21/2017
IMPACT FEE PARKS ¤849.24 12/21/2017
IMPACT FEE SCHOOL ¤3,600.00 12/21/2017
IMPACT FEE TRANSPORTATION ¤3,124.67 12/21/2017
MECHANICAL FEE ¤272.40 12/21/2017
3% PARKS IMPACT FEE CREDIT (¤25.48) 12/21/2017
PLAN CHECK FEE ¤141.60 12/21/2017
PLUMBING FEE ¤272.40 12/21/2017
NEW RESIDENTIAL INSPECTIONS ¤708.00 12/21/2017
SITE PLAN 20 ¤20.00 12/21/2017
SURCHARGE FS 533.721 ¤17.07 12/21/2017
SURCHARGE - FS 468.631 ¤25.60 12/21/2017
STORM WATER PERMIT FEES ¤80.00 12/21/2017
3% TRANS IMPACT FEE CREDIT (¤93.74) 12/21/2017
Fees Total Due: ¤0.00 Total Paid: ¤9,936.39