I want to search for...
Permit #2017101333
Permit Details
Status: COED
| Parcel Id: 33-11-31-3061-00020-0060 |
| CONDITIONED SPACE: 2443 sqft |
| CONDITIONED SPACE: 269 sqft |
| OPENED PORCH (WITH ROOF) : 442 sqft |
| OPENED PORCH (WITH ROOF) : 91 sqft |
| GARAGE: 764 sqft |
| Total Square Footage: 4009 sqft |
| Block: 00020 |
| Subdivision: 2108 - Hidden Lakes- Phase II-Toscana |
| Job Phone: 863-420-2100 |
| Location Address: 20 NEW WATER OAK DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/21/2017 |
| NOC: RECORDED |
| Applicant name: YUVAL BOTANSKY |
| Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC |
|
Address 131 CHADWICK DRIVE DAVENPORT, FL 33837 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
131 CHADWICK DRIVE DAVENPORT, FL 33837 |
CRC1330762 (Exp: 08/31/2026) | 863-420-2100 | 386-517-6865 |
Sub Contractors
TERRY HILE BURD
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO Box 180308 CASSELBERRY, FL 32707 |
CAC1814423 (Exp: 08/31/2024) | (407) 831-3600 | (407)831-2893 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| CANCEL |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2022) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/04/2018 | FINAL APPROVED | WMILLER |
| Note: DEFICIENCIES NOTED BY INSPECTOR CM, AT PRIOR INSPECTION RESOLVED | |||
| BLD - BUILDING FINAL | 10/03/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: missing intersystem bonding, NEC 250.94.. A/C condensor pad needs to be level.M1305.1.4.1 ..GFCI receptacle needed in laundry within 6' of laundry tub. kitchen sill missing. hole in wall at double oven, exposed wires at range hood. not ready | |||
| TUB SET | 10/03/2018 | APPROVED | CMINI |
| BLD - BUILDING FINAL | 10/02/2018 | CANCELLED BY APPLICANT | WEB |
| U-CROSS CONNECTION | 10/02/2018 | APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 10/02/2018 | APPROVED | KHOWELL |
| ROW - FINAL INSPECTION | 10/02/2018 | FINAL APPROVED | KHOWELL |
| Note: SOD WILL BE FINISHED TODAY | |||
| U -UTILITY RESIDENTIAL FINAL | 10/02/2018 | FINAL APPROVED | LFITZGERALD |
| FINAL SURVEY (OFFICE USE ONLY) | 09/26/2018 | APPROVED | DREWIS |
| ELECTRIC - EARLY POWER | 09/20/2018 | APPROVED - AS NOTED | CMINI |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 3:20 | |||
| ROW- PRE-APRON (PRE-POUR) | 09/17/2018 | APPROVED | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 09/12/2018 | PARTIALLY APPROVED | KHOWELL |
| Note: SIDEWALK AND APRON ONLY, PAVER DRIVEWAY. DAMAGED CURB AND GUTTER ON THE LEFT SIDE OF THE APRON WILL NEED TO BE REPLACED BEFORE FINAL INSPECTION | |||
| U - SEWER TIE IN | 09/06/2018 | APPROVED | LFITZGERALD |
| GRAVITY SEWER TEST | 09/06/2018 | APPROVED | JGIBSON |
| TIE BEAM / LINTEL | 08/20/2018 | APPROVED - AS NOTED | CMINI |
| Note: fill in at courtyard | |||
| LATH/BRICK/ WATER BARRIER | 08/09/2018 | APPROVED | CMINI |
| INSULATION | 07/30/2018 | APPROVED | CMINI |
| INSULATION | 07/27/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: not ready | |||
| ALL ROUGH | 07/25/2018 | APPROVED - AS NOTED | CMINI |
| Note: strap service entrance cable at panel 12" from enclosure. nail plates on electric still missing 2, pointed out areas | |||
| ELECTRIC-TUG | 07/25/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO FPL RELEASED TUG 3:05 | |||
| GAS ROUGH | 07/25/2018 | APPROVED | CMINI |
| ELECTRIC-TUG | 07/24/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: no breaker for temp outlet in panel, outlet not temp ready. ground wire not connected to ufer. not ready | |||
| ALL ROUGH | 07/24/2018 | CANCELLED BY APPLICANT | CMINI |
| ALL ROUGH | 07/20/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: strap service entrance cable at panel 12" from enclosure. 10' head pressure missing, nail plates at range vent both sides,nail plates on electric, pointed out areas, complete electric box for alarm panel. bond gas line.revision for fire place and gas on site. nut loose at garage buck. | |||
| ROOF VALLEY & METAL | 07/19/2018 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/18/2018 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/12/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: TO MANY DEFICIENT ITEMS, INSPECTION STOPPED, INCOMPLETE LIST, MISSING STRAPS STRAPS NOT NAILED GABLE END BRACING MISSING AND SPLIT OUT NAILS ON GARAGE GABLE X - BRACING CONTINUOUS LOAD PATH 26 R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/06/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: TO MANY DEFICIENT ITEMS, INSPECTION STOPPED, INCOMPLETE LIST, MISSING STRAPS STRAPS NOT NAILED GABLE END BRACING MISSING AND SPLIT OUT NAILS ON GARAGE GABLE X - BRACING CONTINUOUS LOAD PATH 26 R301,2.1 OVERFRAMING NOT TIED TO STRUCTURAL MEMBERS BENEATH | |||
| ROOF SHEATHING | 05/31/2018 | APPROVED | CMINI |
| TIE BEAM / LINTEL | 05/30/2018 | CANCELLED BY INSPECTOR | CMINI |
| Note: already done | |||
| ROOF SHEATHING | 05/24/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: not nailed per plan | |||
| TIE BEAM / LINTEL | 05/11/2018 | APPROVED | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 04/26/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 03/21/2018 | APPROVED | CMINI |
| MONOLITHIC SLAB | 03/19/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: not ready, vapor retarder not installed correctly | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/09/2018 | APPROVED | JGIBSON |
| FOOTER | 02/12/2018 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| FOOTER | 02/09/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: not ready |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 09/25/2018 | 09/26/2018 |
| Note: Released By: DREWIS final s | |||
| BLD | COMPLETE | 07/13/2018 | 07/16/2018 |
| Note: Released By: JHINDMAN | |||
| BLD | HOLD | 07/06/2018 | 07/06/2018 |
| Note: Held By: JHINDMAN 1. Identify the location of the ventless fireplace and provide manufacturers specifications. 6th ed. FBC 107.3.5. J. Hindman 986-3784. | |||
| PLUM | COMPLETE | 07/02/2018 | 07/06/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 04/25/2018 | 04/26/2018 |
| Note: Released By: DREWIS foundation survey | |||
| ELEC | COMPLETE | 12/15/2017 | 12/18/2017 |
| Note: Released By: DREWIS | |||
| MECH | COMPLETE | 12/15/2017 | 12/19/2017 |
| Note: Released By: JHINDMAN | |||
| ELEC | HOLD | 11/29/2017 | 12/04/2017 |
| Note: Held By: DREWIS Please provide a receptacle for front bedroom behind door swing, NEC 2011 210.52A. Daniel Rewis 986-4736 | |||
| MECH | HOLD | 11/29/2017 | 12/05/2017 |
| Note: Held By: JHINDMAN Coordinate roofing material on energy calculation with plans and product approval per FBC 5th ed. 107.2.1 3nd request. J. hindman 986-3784. Your energy calculations show shingles for the roof . the product approvals are for tile. | |||
| ZON | COMPLETE | 11/14/2017 | 11/15/2017 |
| Note: Released By: TAWILLIAMS | |||
| ELEC | HOLD | 11/14/2017 | 11/16/2017 |
| Note: Held By: DREWIS Corrected electrical plan not submitted. Daniel Rewis 986-4736 | |||
| SW1 | COMPLETE | 11/14/2017 | 11/16/2017 |
| Note: Released By: DREWIS | |||
| MECH | HOLD | 11/14/2017 | 11/27/2017 |
| Note: Held By: JHINDMAN Coordinate roofing material on energy calculation with plans and product approval per FBC 5th ed. 107.2.1 2nd request. J. hindman 986-3784. | |||
| BLD | COMPLETE | 10/31/2017 | 11/06/2017 |
| Note: Released By: FREODICA | |||
| ELEC | HOLD | 10/31/2017 | 11/01/2017 |
| Note: Held By: DREWIS Please provide a receptacle for front bedroom behind door swing, NEC 2011 210.52A. Please provide the signature of the electrical contractor on the load calculations, FBC 107.1. D. Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 10/31/2017 | 10/31/2017 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 10/31/2017 | 11/06/2017 |
| Note: Held By: FREODICA 1. Provide signature of owner/agent on energy calculation per FBCEC R405.4.2. 2. Provide hesting/cooling equipment summary per FBCEC 5th ed. R403.6. 3. Coordinate roofing material on energy calculation with plans and product approval per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| PLUM | COMPLETE | 10/31/2017 | 11/06/2017 |
| Note: Released By: FREODICA | |||
| SW1 | HOLD | 10/31/2017 | 11/01/2017 |
| Note: Held By: DREWIS Please provide proposed measurements in accordance with FBC R401.3. D. Rewis 986-4736 | |||
| UD1 | COMPLETE | 10/31/2017 | 11/07/2017 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 10/31/2017 | 10/31/2017 |
| Note: Held By: AMOBLEY This lot has two F.I.R.M. panel numbers. Please provide both on site plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 10/04/2018 |
| REINSPECTION FEE | ¤40.00 | 09/05/2018 |
| REINSPECTION FEE | ¤40.00 | 09/05/2018 |
| REINSPECTION FEE | ¤40.00 | 07/24/2018 |
| REVISION | ¤40.00 | 07/24/2018 |
| REVISION | ¤40.00 | 07/12/2018 |
| REINSPECTION FEE | ¤40.00 | 07/12/2018 |
| REINSPECTION FEE | ¤40.00 | 07/12/2018 |
| REINSPECTION FEE | ¤40.00 | 07/12/2018 |
| REINSPECTION FEE | ¤40.00 | 07/12/2018 |
| REINSPECTION FEE | ¤40.00 | 03/08/2018 |
| ADMIN FEE | ¤20.00 | 12/21/2017 |
| ELECTRIC FEE | ¤272.40 | 12/21/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 12/21/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 12/21/2017 |
| IMPACT FEE PARKS | ¤849.24 | 12/21/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/21/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 12/21/2017 |
| MECHANICAL FEE | ¤272.40 | 12/21/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 12/21/2017 |
| PLAN CHECK FEE | ¤141.60 | 12/21/2017 |
| PLUMBING FEE | ¤272.40 | 12/21/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤708.00 | 12/21/2017 |
| SITE PLAN 20 | ¤20.00 | 12/21/2017 |
| SURCHARGE FS 533.721 | ¤17.07 | 12/21/2017 |
| SURCHARGE - FS 468.631 | ¤25.60 | 12/21/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/21/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 12/21/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,936.39 |