I want to search for...

Permit #2017110034

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7015-00030-2350
Block: 00030
Subdivision: 2194 - SECTION 15-COUNTRY CLUB COVE
Job Phone: 386-437-3122
Location Address: 2 CHEROKEE CT E
Type: DR - DRIVEWAY
Issue Date: 11/16/2017
NOC: RECORDED
Applicant name: TERRY MARTIN MCNITT JR
Owner: BEAGLEY, JACK E & LORRAINE

Address

2 CHEROKEE CT E

PALM COAST, FL 32137

Lot: 2350
Contracted Stated Job Value: ¤13,000.00
Job Description: ADD PAVERS TO DRIVEWAY & REPLACE CULVERT & PAVER WALKWAY
Type: CN

Contractor

VERDEGO LLC
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 789

BUNNELL, FL 32110

CGC1506752 (Exp: 08/31/2026) 386-437-3122 386-437-6883

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 04/18/2018 APPROVED RGROSS
ROW - FINAL INSPECTION 04/09/2018 APPROVED - AS NOTED KHOWELL
Note: CLEAN OUT CULVERT PIPE ENDS AND REPAIR LOOSE PAVERS ON RIGHT SIDE MITERED END SECTION, PRIOR TO CALLING IN FINAL APRON AFTER POUR INSPECTION
U -UTILITY RESIDENTIAL FINAL 02/19/2018 FINAL APPROVED JNICHOLS
ROW - FINAL INSPECTION 02/19/2018 Disapproved -FEE REQUIRED RGROSS
Note: CLEAN OUT CULVERT ENDS AND RAKE OUT SWALE AND SOD ON LEFT SIDE, REPAIR LOOSE PAVERS ON RIGHT SIDE MITERED END SECTION
ROW- PRE-APRON (PRE-POUR) 01/16/2018 APPROVED CTROHA
Note: READY TO POUR It is the BUILDER'S RESPONSIBILITY: to recheck elevations and pipe size, to insure that an obstruction does not exist upstream and or downstream, that the culvert pipe is set to and or follows the swale plan, form the driveway to the approved site plan and follow the approved driveway detail sheet provided by the City of Palm Coast. PRIOR to placement of concrete. BASE READY FOR PAVERS

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 11/02/2017 11/16/2017
Note: Released By: TBAKER
SW1 COMPLETE 11/02/2017 11/07/2017
Note: Released By: DREWIS
UD1 COMPLETE 11/02/2017 11/03/2017
Note: Released By: DSPENCER All Concrete, Driveways, Pavers, Pools / Sidewalks ETC. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind.
ZON COMPLETE 11/02/2017 11/02/2017
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SITE PLAN 20 ¤20.00 11/16/2017
SURCHARGE FS 533.721 ¤2.00 11/16/2017
SURCHARGE - FS 468.631 ¤2.00 11/16/2017
STORM WATER PERMIT FEES ¤40.00 11/16/2017
ADMIN FEE ¤20.00 11/16/2017
RECORDING FEE REIMBURSE DOC ¤52.50 11/16/2017
REINSPECTION FEE ¤40.00
Fees Total Due: ¤40.00 Total Paid: ¤136.50