I want to search for...

Permit #2017110284

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7020-00090-0370
Block: 00090
Subdivision: 2182 - SECTION 20-WYNNFIELD
Job Phone: 386-931-0401
Location Address: 88 WELLINGTON DR
Type: DR - DRIVEWAY
Issue Date: 11/16/2017
NOC: Unknown
Applicant name: RONNIE SANTOS AGUIAR
Owner: SEPE PETER P LIFE ESTATE

Address

88 WELLINGTON DRIVE

PALM COAST, FL 32164

Lot: 0370
Contracted Stated Job Value: ¤2,275.00
Job Description: DRIVEWAY
Type: CN

Contractor

SANTOS & SONS CONCRETE
Status Location Address Phone
INACTIVE

PO BOX 1903

BUNNELL, FL 32110

386-931-0401

Inspection History

Type Request Date Result Inspector
PROJECT STATUS (OFFICE USE) 09/06/2018 FINAL APPROVED BBEMBRY
ROW - FINAL APRON (AFTER POUR) 12/07/2017 APPROVED RGROSS
ROW - FINAL INSPECTION 12/07/2017 APPROVED RGROSS
ROW- PRE-APRON (PRE-POUR) 11/21/2017 APPROVED RGROSS
Note: READY TO POUR

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 11/07/2017 11/16/2017
Note: Released By: TBAKER
SW1 COMPLETE 11/07/2017 11/09/2017
Note: Released By: DREWIS
UD1 COMPLETE 11/07/2017 11/15/2017
Note: Released By: MBACON All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA clear zone for a hydrant is 3 feet from both sides and 3 feet behind the hydrant. Front of hydrant shall remain completely clear.
ZON COMPLETE 11/07/2017 11/08/2017
Note: Released By: AMOBLEY

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
ADMIN FEE ¤20.00 11/16/2017
SITE PLAN 20 ¤20.00 11/16/2017
SURCHARGE FS 533.721 ¤2.00 11/16/2017
SURCHARGE - FS 468.631 ¤2.00 11/16/2017
STORM WATER PERMIT FEES ¤40.00 11/16/2017
Fees Total Due: ¤0.00 Total Paid: ¤84.00