Permit #2017110561
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0610 |
| CONDITIONED SPACE: 2786 sqft |
| GARAGE: 820 sqft |
| OPENED PORCH (WITH ROOF) : 37 sqft |
| OPENED PORCH (WITH ROOF) : 924 sqft |
| Total Square Footage: 4567 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-236-4133 |
| Location Address: 49 SCARLET OAK CIR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/08/2018 |
| NOC: RECORDED |
| Applicant name: LEONARDO CIRO SANCLEMENTE |
| Owner: THEROUX KATHRYN M |
|
Address 37 N WATERVIEW DRIVE PALM COAST, FL 32137 |
| Lot: 0610 |
| Contracted Stated Job Value: ¤382,177.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INTERVEST CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone |
| CANCEL |
2379 BEVILLE RD DAYTONA BEACH, FL 32119 |
CBC1261237 (Exp: 08/31/2020) | 386-236-4133 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
ROBERT CRAIG KULP
| Status | Location Address | State License Number | Phone |
| CANCEL |
5401 ENERGY AIR CT ORLANDO, FL 32810 |
CAC1816317 (Exp: 08/31/2022) | 407-886-3729 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/18/2018 | FINAL APPROVED | WMILLER |
| ROW - FINAL INSPECTION | 10/11/2018 | FINAL APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 10/09/2018 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 10/09/2018 | Disapproved -FEE REQUIRED | RGROSS |
| Note: STABILIZE ALL BARE EARTH AREAS ON ADJACENT VACANT LOT WITH SEED AND STRAW. SEE ATTACHED PHOTO'S. | |||
| ROW - FINAL APRON (AFTER POUR) | 10/09/2018 | APPROVED | RGROSS |
| U-CROSS CONNECTION | 10/09/2018 | APPROVED | LFITZGERALD |
| FINAL SURVEY (OFFICE USE ONLY) | 09/17/2018 | APPROVED | DREWIS |
| ELECTRIC - EARLY POWER | 09/10/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED EARLY POWER 3:00 | |||
| ROW- PRE-APRON (PRE-POUR) | 09/10/2018 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 09/06/2018 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: NEED TO SAFE OFF ALL OUTLETS IN KITCHEN AND UNDER CABINET CONDUCTORS, FLOOR OUTLET NEEDS TO BE RE-WORKED, NEED 2" DEPTH ON CONDUIT NEC300.5 | |||
| ROW- PRE-APRON (PRE-POUR) | 08/20/2018 | APPROVED - AS NOTED | RGROSS |
| Note: PAVER EDGE DRIVEWAY 2017 PERMIT. | |||
| LATH/BRICK/ WATER BARRIER | 07/06/2018 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 06/22/2018 | APPROVED | WMILLER |
| ALL ROUGH | 06/19/2018 | APPROVED - AS NOTED | CMINI |
| Note: 10' head pressure missing | |||
| ELEV CERT-FOUNDATION APPROVAL | 06/18/2018 | APPROVED | JMYERS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/30/2018 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/23/2018 | CANCELLED BY APPLICANT | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 05/16/2018 | APPROVED | CMINI |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/16/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: need revision on trussrepair, need to strap garage door header per plan. need continuous load path straps and anchors and framing at front entrance | |||
| U - SEWER TIE IN | 04/20/2018 | APPROVED | DSPENCER |
| GRAVITY SEWER TEST | 04/20/2018 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 04/19/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: uncover connections for inspection UNCOVER WORK TO BE INSPECTED..FBC...P2503.2 | |||
| WALL SHEATHING | 04/11/2018 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING | 04/11/2018 | APPROVED | WMILLER |
| ROOF VALLEY & METAL | 04/11/2018 | Disapproved - NO FEE | WMILLER |
| Note: must pass 2460 prior | |||
| WALL SHEATHING | 04/09/2018 | CANCELLED BY APPLICANT | WMILLER |
| ELECTRIC-TUG | 02/16/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TUG 3:20 | |||
| TIE BEAM / LINTEL | 02/15/2018 | APPROVED | CMINI |
| LATH/BRICK/ WATER BARRIER | 02/14/2018 | CANCELLED BY APPLICANT | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 02/14/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 02/02/2018 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| MONOLITHIC SLAB | 02/01/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: THIS IS A REINSPECTION. not ready | |||
| MONOLITHIC SLAB | 01/31/2018 | CANCELLED BY APPLICANT | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/26/2018 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED A PORTIBLE RESTROOM BEFORE SLAB INSPECTION |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 10/25/2018 | 10/25/2018 |
| Note: Released By: JMYERS The Final elevation certificate has been deemed acceptable. | |||
| SW1 | COMPLETE | 09/17/2018 | 09/17/2018 |
| Note: Released By: DREWIS | |||
| SW1 | HOLD | 09/12/2018 | 09/13/2018 |
| Note: Held By: JHINDMAN final survey right rear of lot cannot drain onto adjacent side property. J. hindman 986-3784. | |||
| PLFM | COMPLETE | 06/18/2018 | 06/18/2018 |
| Note: Released By: JMYERS The Building Under Construction elevation certificate has been deemed acceptable. Please provide Final elevation certificate prior to receiving CO. | |||
| PLFM | HOLD | 06/14/2018 | 06/15/2018 |
| Note: Held By: JMYERS As of 6/6/2018 new FEMA FIRM maps have taken effect. Please provide an updated Elevation Certificate that uses the new FIRM maps. | |||
| SW1 | COMPLETE | 06/13/2018 | 06/19/2018 |
| Note: Released By: DREWIS | |||
| ZON | COMPLETE | 06/13/2018 | 06/13/2018 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 06/13/2018 | 06/14/2018 |
| Note: Released By: TBAKER | |||
| UD1 | COMPLETE | 06/13/2018 | 06/20/2018 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| PLFM | HOLD | 06/11/2018 | 06/11/2018 |
| Note: Held By: JMYERS As of 6/6/2018 new FEMA FIRM maps have taken effect. Please provide an updated Elevation Certificate that uses the new FIRM maps. | |||
| BLD | COMPLETE | 05/23/2018 | 05/29/2018 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 05/18/2018 | 05/22/2018 |
| Note: Released By: JHINDMAN | |||
| PLFM | HOLD | 02/13/2018 | 02/13/2018 |
| Note: Held By: DRAMIREZ The first elevation certificate (construction drawings) submitted for review has line item A9.C value to be 0.00 but the second (building under construction) has this value to be N/A. The value for line item A9.C should be 0.00. Please revise and resubmit electronically and a hard signed and sealed copy. | |||
| SW1 | COMPLETE | 02/12/2018 | 02/14/2018 |
| Note: Released By: DREWIS final | |||
| SW1 | COMPLETE | 12/29/2017 | 01/03/2018 |
| Note: Released By: DREWIS | |||
| ZON | COMPLETE | 12/29/2017 | 12/29/2017 |
| Note: Released By: AMOBLEY | |||
| PLFM | COMPLETE | 12/19/2017 | 12/20/2017 |
| Note: Released By: DBEVAN The elevation certificate for “Construction Drawings” is sufficient for this stage of development. | |||
| PLFM | HOLD | 12/13/2017 | 12/13/2017 |
| Note: Held By: DBEVAN 1. Section C2a), C2d), Ce) are estimated at exactly 1.0’ above BFE (9.0’) or less. The City of Palm Coast requires that these elevations are 1.0’ above BFE. Modify the site plan and elevation certificate to meet this requirement. 2. Provide a hard copy of the amended elevation certificate and future elevation certificates (ECs) to the Building Division prior to CO. Online submittal of an electronically signed EC is permissible to expedite the review; however, the City of Palm Coast is required to keep an original signed and sealed elevation certificate on file. | |||
| SW1 | HOLD | 12/13/2017 | 12/18/2017 |
| Note: Held By: DREWIS Grade measurements given within 10' of foundation wall do not meet 5% slope requirement of FBC R401.3 Daniel Rewis 986-4736 | |||
| BLD | COMPLETE | 12/13/2017 | 12/13/2017 |
| Note: Released By: JHINDMAN | |||
| PLFM | HOLD | 11/15/2017 | 11/15/2017 |
| Note: Held By: DBEVAN The following comments are in regards to the 08-09-17 dated elevation certificate. 1. Line items A8 a), A8b, A8c), and A8d) must be completed. Since the proposed building does not have a crawlspace or enclosure, utilize “N/A” for A8a) – A8c). For A8d), check the applicable box. 2. B9) Verify that 6.0’ is the established BFE. 3. B11) shall be NGVD 1929 since the FIRM is being used for a BFE. 4. C2 election of datum shall be the same as the FIRM which is currently NGVD 1929 by effective FIRMs are dated July 17, 2006. 5. Elevations for C2a) – C2h) should be the same datum as the FIRM, NGVD 1929. City of Palm Coast Building Division requires that the site plan & surveys are in NAVD 1988. For fields that a “N/A” is applied, do not check a measurement in the right column. 6. B4) indicates a Panel 12035C0141; however, the survey notes 12035C0137 which is consistent with City mapping data. Change this field to the accurate panel information. 7. Note that the digitally signed is acceptable for the first two stages of the elevation certificate, “construction drawings” and “building under construction”. However, a hard copy with raised sign and signature/date of the “finished construction” will be required. | |||
| BLD | HOLD | 11/14/2017 | 11/21/2017 |
| Note: Held By: JHINDMAN 1. Provide a roof vent calculation that meets the 5th ed. Florida building code Residential 806.2. J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 11/14/2017 | 11/16/2017 |
| Note: Released By: DREWIS | |||
| ENGIN1 | COMPLETE | 11/14/2017 | 11/16/2017 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 11/14/2017 | 11/27/2017 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 11/14/2017 | 11/27/2017 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 11/14/2017 | 11/16/2017 |
| Note: Held By: DREWIS Please provide a site plan with proposed survey measurements for flow and in accordance with FBC R401.3. Daniel Rewis 986-4736 | |||
| UD1 | COMPLETE | 11/14/2017 | 11/20/2017 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind | |||
| ZON | COMPLETE | 11/14/2017 | 11/15/2017 |
| Note: Released By: AMOBLEY |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REVISION | ¤40.00 | 10/23/2018 |
| REVISION | ¤40.00 | 10/23/2018 |
| REVISION | ¤40.00 | 10/23/2018 |
| REINSPECTION FEE | ¤40.00 | 10/23/2018 |
| REINSPECTION FEE | ¤40.00 | 10/23/2018 |
| REINSPECTION FEE | ¤40.00 | 10/23/2018 |
| REINSPECTION FEE | ¤40.00 | 10/23/2018 |
| REINSPECTION FEE | ¤40.00 | 10/23/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤766.00 | 01/08/2018 |
| SITE PLAN 20 | ¤20.00 | 01/08/2018 |
| SURCHARGE FS 533.721 | ¤18.29 | 01/08/2018 |
| SURCHARGE - FS 468.631 | ¤27.43 | 01/08/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 01/08/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 01/08/2018 |
| ADMIN FEE | ¤20.00 | 01/08/2018 |
| ELECTRIC FEE | ¤289.80 | 01/08/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 01/08/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 01/08/2018 |
| IMPACT FEE PARKS | ¤849.24 | 01/08/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 01/08/2018 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 01/08/2018 |
| MECHANICAL FEE | ¤289.80 | 01/08/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 01/08/2018 |
| PLAN CHECK FEE | ¤153.20 | 01/08/2018 |
| PLUMBING FEE | ¤289.80 | 01/08/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,941.24 |