Permit #2017110789
Permit Details
Status: COED
| Parcel Id: 15-11-31-2970-00000-0780 |
| CONDITIONED SPACE: 2774 sqft |
| GARAGE: 765 sqft |
| OPENED PORCH (WITH ROOF) : 754 sqft |
| OPENED PORCH (WITH ROOF) : 33 sqft |
| Total Square Footage: 4326 sqft |
| Block: 00000 |
| Subdivision: 2070 - Grand Haven North Phase 1 @ Grand Haven |
| Job Phone: 386-236-4133 |
| Location Address: 31 WATERVIEW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/15/2017 |
| NOC: RECORDED |
| Applicant name: LEONARDO CIRO SANCLEMENTE |
| Owner: AMBUTER STEVE D & PATRICE L GARNER-AMBUTER TRUSTEE |
|
Address 5029 ISLE ROYAL COURT OCEANSIDE, CA 92057 |
| Lot: 0780 |
| Contracted Stated Job Value: ¤371,222.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INTERVEST CONSTRUCTION, INC.
| Status | Location Address | State License Number | Phone |
| CANCEL |
2379 BEVILLE RD DAYTONA BEACH, FL 32119 |
CBC1261237 (Exp: 08/31/2020) | 386-236-4133 |
Sub Contractors
STEPHEN COURTEAUX
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
85 North Yonge Street Ormond Beach, FL 32174 |
EC13001748 (Exp: 08/31/2026) | (386) 672-4900 | 386-676-7472 |
ROBERT CRAIG KULP
| Status | Location Address | State License Number | Phone |
| CANCEL |
5401 ENERGY AIR CT ORLANDO, FL 32810 |
CAC1816317 (Exp: 08/31/2022) | 407-886-3729 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/27/2018 | FINAL APPROVED | WMILLER |
| ROW - FINAL APRON (AFTER POUR) | 07/26/2018 | APPROVED - AS NOTED | RGROSS |
| Note: FINAL APRON APPROVED THE SAME TIME FINAL ROW WAS INSPECTED AND PASSED AS NOTED. | |||
| ROW - FINAL INSPECTION | 07/26/2018 | APPROVED - AS NOTED | RGROSS |
| Note: BARE EARTH ALONG WATERWAY NEEDS SODDED TO PREVENT SEDIMENT WASHOUT. Sec. 9.05.01 - 7 MUD AND SAND IN THE MIAMI CURB NEEDS TO BE REMOVED. Sec 9.04.03 CONTRACTOR HAD CORRECTIONS MADE SAME DAY. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/26/2018 | FINAL APPROVED | LFITZGERALD |
| Note: as a courtesy to allow CO , William will make sure the sewer c/o cap which is now an inverted knob that when force cross threaded into coupling , is difficult if not possible to remove if need be. William to place proper fitting, flush mount cap when possible. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 07/24/2018 | APPROVED | DREWIS |
| ROW- PRE-APRON (PRE-POUR) | 07/09/2018 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 07/03/2018 | PARTIALLY APPROVED | RGROSS |
| Note: APPROVED FOR CONCRETE APRON POUR ONLY. PAVER DRIVEWAY | |||
| ELECTRIC - EARLY POWER | 06/22/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 3:40 NEED REVISION ON SUB PANEL BY FINAL | |||
| LATH/BRICK/ WATER BARRIER | 05/21/2018 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 04/27/2018 | APPROVED | CMINI |
| ALL ROUGH | 04/24/2018 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION, arch windows still not complete, check on insulation | |||
| ALL ROUGH | 04/23/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. FIREBLOCKING INTEGRITY MUST BE MAINTAINED R302.11.2 (at range hood) 2. NAIL PLATES FBC 26 R, M1308.2 PROTECTION FROM PHYSICAL DAMAGE 26 (at range hood) 3. FASTENERS AT ARCHED WINDOWS 4. MAKE UP ELECTRIC IN EXTERIOR BOXES, MAKE UP GROUND WIRES, GROUND WIRES MUST BE MADE UP NEC 110.14a | |||
| GRAVITY SEWER TEST | 04/20/2018 | APPROVED | JGIBSON |
| ELEV CERT-FOUNDATION APPROVAL | 04/20/2018 | APPROVED | JMYERS |
| U - SEWER TIE IN | 04/20/2018 | APPROVED | DSPENCER |
| ROOF VALLEY & METAL | 04/11/2018 | APPROVED | WMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/11/2018 | FINAL APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| WALL SHEATHING | 04/11/2018 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| WALL SHEATHING | 04/10/2018 | CANCELLED BY APPLICANT | WMILLER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/10/2018 | CANCELLED BY APPLICANT | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| ROOF VALLEY & METAL | 03/27/2018 | APPROVED | CMINI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/27/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: trusses A-6,7,8 missing straps, mutiple valley straps not nailed. loose sheet front left corner garage. small fracture on bottom cord of truss at front entrance next to can light | |||
| ROOF SHEATHING | 03/19/2018 | APPROVED | WMILLER |
| ELECTRIC-TUG | 02/16/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TUG 3:20 | |||
| TIE BEAM / LINTEL | 02/15/2018 | APPROVED | CMINI |
| LATH/BRICK/ WATER BARRIER | 02/14/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: not ready for lath inspection | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/14/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 02/01/2018 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/23/2018 | APPROVED | JGIBSON |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/22/2018 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NO RISER DIAGRAM FOR PLUMBING FIRST ROUGH INSPECTION |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 07/24/2018 | 07/24/2018 |
| Note: Released By: DREWIS final s | |||
| ELEC | COMPLETE | 07/20/2018 | 07/23/2018 |
| Note: Released By: DREWIS | |||
| PLFM | COMPLETE | 04/20/2018 | 04/20/2018 |
| Note: Released By: JMYERS The Construction and Building Under Construction elevation certificates provided have been deemed acceptable. Please provide Final elevation certificate prior to receiving CO. On the Final elevation certificate, the box in Section D needs to be sealed, signed, and dated by the surveyor. | |||
| PLFM | HOLD | 02/13/2018 | 02/13/2018 |
| Note: Held By: DRAMIREZ The first elevation certificate (construction drawings) submitted for review had line item A8.a-c incorrect with a value of 0.00 and line item A9.c correct with a value of 0.00 but the second (building under construction) has line item A-8.a-c correct and A9.c value to be N/A. The value for line item A9.c should be 0.00. Please revise and resubmit electronically and a hard signed and sealed copy. | |||
| SW1 | COMPLETE | 02/12/2018 | 02/14/2018 |
| Note: Released By: DREWIS final | |||
| ZON | COMPLETE | 12/07/2017 | 12/07/2017 |
| Note: Released By: AMOBLEY | |||
| PLFM | COMPLETE | 12/07/2017 | 12/07/2017 |
| Note: Released By: DBEVAN 1. For Sections A8 a), A8 b), and A8 c), there are no crawlspaces or enclosures are applicable. At the next submittal “Building Under Construction”, provide an updated elevation certificate with referenced section(s) updated to “N/A” instead of “0” for the referenced fields. 2. The provided elevation certificate was digitally signed and acceptable for electronic reviews. Due to the City’s Floodplain Management requirements, provide a hard copy of this and future elevation certificates to the Building Division prior to CO. Online submittal of the scanned copy and/or digitally signed is permissible to expedite the review; however, the City of Palm Coast is required to keep an original signed and sealed elevation certificate on file. | |||
| ELEC | COMPLETE | 12/07/2017 | 12/14/2017 |
| Note: Released By: DREWIS | |||
| SW1 | COMPLETE | 12/07/2017 | 12/14/2017 |
| Note: Released By: DREWIS | |||
| BLD | COMPLETE | 12/07/2017 | 12/11/2017 |
| Note: Released By: JHINDMAN | |||
| BLD | HOLD | 11/20/2017 | 11/29/2017 |
| Note: Held By: JHINDMAN 1. Provide roof ventilation per 5th ed. FBC R806.2 Minimum vent area. The minimum net free ventilating area shall be 1/150 of the area of the vented space. Exception: The minimum net free ventilation area shall be 1/300 of the vented space provided one or more of the following conditions are met: 1. In Climate Zones 6, 7 and 8, a Class I or II vapor retarder is installed on the warm-in-winter side of the ceiling. 2. At least 40 percent and not more than 50 percent of the required ventilating area is provided by ventilators located in the upper portion of the attic or rafter space. Upper ventilators shall be located no more than 3 feet (914 mm) below the ridge or highest point of the space, measured vertically, with the balance of the required ventilation provided by eave or cornice vents. Where the location of wall or roof framing members conflicts with the installation of upper ventilators, installation more than 3 feet (914 mm) below the ridge or highest point of the space shall be permitted J. Hindman 986-3784. | |||
| ELEC | HOLD | 11/20/2017 | 11/20/2017 |
| Note: Held By: DREWIS Please provide a receptacle for the bedroom behind the kitchen on the switch wall and on the switch wall by lania entry, NEC 2011 210.52. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 11/20/2017 | 11/20/2017 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 11/20/2017 | 11/29/2017 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 11/20/2017 | 11/29/2017 |
| Note: Released By: JHINDMAN | |||
| SW1 | HOLD | 11/20/2017 | 11/20/2017 |
| Note: Held By: DREWIS Please provide: Proposed survey measurements for stormwater flow, Tech. Manual Sec. 5 Eng. Standard 300.01D. Proposed measurements in accordance with FBC R401.3. Daniel Rewis 986-4736 | |||
| UD1 | COMPLETE | 11/20/2017 | 12/01/2017 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 11/20/2017 | 11/20/2017 |
| Note: Held By: TAWILLIAMS There are two flood zones on this property. The only one listed is zone x. AE needs to be added . | |||
| PLFM | HOLD | 11/20/2017 | 11/20/2017 |
| Note: Held By: DBEVAN According to City of Palm Coast mapping resources, the subject property is located within an “AE” zone which is a Special Flood Hazard Area (SFHA). However, the provided survey notes reflect a “X” zone for the subject property. Verify the floodplain designation for the proposed improvements and provide an elevation certificate to verify the proposed elevations of the improvements. Elevation certificates are required at three (3) stages of construction for structures and accessory mechanical equipment located within a SFHA 1. Preconstruction (Construction Drawings) 2. Foundation (Building Under Construction) and 3. Vertical (Finished Construction). |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/27/2018 |
| REINSPECTION FEE | ¤40.00 | 07/27/2018 |
| REINSPECTION FEE | ¤40.00 | 07/27/2018 |
| REINSPECTION FEE | ¤40.00 | 07/27/2018 |
| REINSPECTION FEE | ¤40.00 | 07/27/2018 |
| REVISION | ¤40.00 | 07/27/2018 |
| SITE PLAN 20 | ¤20.00 | 12/15/2017 |
| SURCHARGE FS 533.721 | ¤17.82 | 12/15/2017 |
| SURCHARGE - FS 468.631 | ¤26.74 | 12/15/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/15/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 12/15/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤744.00 | 12/15/2017 |
| ADMIN FEE | ¤20.00 | 12/15/2017 |
| ELECTRIC FEE | ¤283.20 | 12/15/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 12/15/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 12/15/2017 |
| IMPACT FEE PARKS | ¤849.24 | 12/15/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/15/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 12/15/2017 |
| MECHANICAL FEE | ¤283.20 | 12/15/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 12/15/2017 |
| PLAN CHECK FEE | ¤148.80 | 12/15/2017 |
| PLUMBING FEE | ¤283.20 | 12/15/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,813.88 |