Permit #2017110942
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00240-0090 |
| CONDITIONED SPACE: 2300 sqft |
| GARAGE: 416 sqft |
| OPENED PORCH (WITH ROOF) : 181 sqft |
| OPENED PORCH (WITH ROOF) : 34 sqft |
| Total Square Footage: 2931 sqft |
| Block: 00240 |
| Subdivision: - |
| Job Phone: (386)383-0376 |
| Location Address: 5 ULMACEAL PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 12/20/2017 |
| NOC: RECORDED |
| Applicant name: ANTHONY CRAIG GUCCIONE |
| Owner: KUSOL K PEA |
|
Address 226 WAYLAND AVE CRANSTON, RI 02920 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤270,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLD COAST HOME BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 354707 PALM COAST, FL 32137 |
CGC1507791 (Exp: 08/31/2026) | 386-313-6221 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32136 |
CAC048127 (Exp: 08/31/2018) | 386-445-5023 | 386-446-4614 |
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/24/2018 | FINAL APPROVED | DROCKWELL |
| BLD - BUILDING FINAL | 07/20/2018 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Provide disconnect air-handler closet | |||
| ROW - FINAL APRON (AFTER POUR) | 07/06/2018 | APPROVED | CTROHA |
| ROW - FINAL INSPECTION | 07/06/2018 | APPROVED | CTROHA |
| U -UTILITY RESIDENTIAL FINAL | 07/06/2018 | FINAL APPROVED | MBACON |
| FINAL SURVEY (OFFICE USE ONLY) | 07/05/2018 | APPROVED | DREWIS |
| ROW- PRE-APRON (PRE-POUR) | 05/30/2018 | APPROVED | CTROHA |
| Note: COMPACT BEFORE LAYING PAVERS THEN READY FOR PAVERS | |||
| ROW- PRE-APRON (PRE-POUR) | 05/09/2018 | CANCELLED BY APPLICANT | KHOWELL |
| Note: CONTRACTOR CALLED AND CANCELLED | |||
| ROW- PRE-APRON (PRE-POUR) | 05/09/2018 | PARTIALLY APPROVED | KHOWELL |
| Note: THIS IS A REINSPECTION APRON ONLY PAVER DRIVEWAY CHECK PIPE ELEVATION ON THE LEFT SIDE PRIOR TO POURING IT IS RIGHT ON THE PROPOSED ELEVATION | |||
| ELECTRIC - EARLY POWER | 05/01/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED EARLY POWER 3:00 | |||
| U - SEWER TIE IN | 04/13/2018 | APPROVED | MBACON |
| LATH/BRICK/ WATER BARRIER | 04/06/2018 | APPROVED | DROCKWELL |
| INSULATION | 04/04/2018 | APPROVED | DROCKWELL |
| ALL ROUGH | 03/29/2018 | APPROVED | DROCKWELL |
| GRAVITY SEWER TEST | 03/29/2018 | APPROVED | DROCKWELL |
| ELECTRIC-TUG | 03/23/2018 | CANCELLED BY APPLICANT | RMARTIN |
| ROOF VALLEY & METAL | 03/20/2018 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/08/2018 | APPROVED | DROCKWELL |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/07/2018 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Anchor 3 knee walls as discussed | |||
| TIE BEAM / LINTEL | 02/12/2018 | APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 02/08/2018 | CANCELLED BY APPLICANT | DROCKWELL |
| Note: Call in the proper inspection | |||
| TIE BEAM / LINTEL | 02/07/2018 | Disapproved -FEE REQUIRED | DROCKWELL |
| Note: Expose dowel in wall at change in height back wall | |||
| FOUND SURVEY APPROVED (OFFICE) | 02/02/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 01/25/2018 | APPROVED | DROCKWELL |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/23/2018 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 06/28/2018 | 06/29/2018 |
| Note: Released By: DREWIS Held By: DREWIS final survey Provide positive flow in the swale. Daniel Rewis 986-4736 | |||
| ZON | COMPLETE | 05/10/2018 | 05/10/2018 |
| Note: Released By: AMOBLEY | |||
| ENGIN1 | COMPLETE | 05/03/2018 | 05/03/2018 |
| Note: Released By: TBAKER | |||
| SW1 | COMPLETE | 05/03/2018 | 05/08/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 05/03/2018 | 05/07/2018 |
| Note: Released By: LFITZGERALD Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 7.5’ on the sides or 4’ behind | |||
| ZON | HOLD | 05/03/2018 | 05/03/2018 |
| Note: Held By: AMOBLEY Driveway extension can not go all the way up to house. There needs to be a buffer with foundation plantings. Please also submit new landscape plan with changes showing the foundation plantings | |||
| BLD | COMPLETE | 02/26/2018 | 02/28/2018 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 02/12/2018 | 02/14/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 02/02/2018 | 02/02/2018 |
| Note: Released By: DREWIS foundation | |||
| ZON | COMPLETE | 12/19/2017 | 12/19/2017 |
| Note: Released By: TAWILLIAMS | |||
| ZON | HOLD | 12/18/2017 | 12/18/2017 |
| Note: Held By: TAWILLIAMS Need Right-Of-Way Utilization Agreement for paver driveway. | |||
| ELEC | COMPLETE | 12/18/2017 | 12/19/2017 |
| Note: Released By: DREWIS | |||
| BLD | COMPLETE | 12/18/2017 | 12/20/2017 |
| Note: Released By: JHINDMAN Released By: JHINDMAN | |||
| BLD | HOLD | 11/27/2017 | 12/01/2017 |
| Note: Held By: JHINDMAN 1. Revise code references on page 4 of 4 to the 5th edition Florida building Code. the 2010 icode s still on the wall sections J. hindman 986-3784. | |||
| ELEC | HOLD | 11/27/2017 | 11/30/2017 |
| Note: Held By: DREWIS Please provide the signature of the electrical contractor on the load calculations, FBC 5th ed 107.1, smoke detectors in the bedroom by front entrance and bedroom bordering laundry room, FBC 5th ed. R314.3 and receptacles behind door swing of back back bedroom and bedroom bordering laundry, NEC 2011 210.52. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 11/27/2017 | 12/05/2017 |
| Note: Released By: TBAKER | |||
| MECH | COMPLETE | 11/27/2017 | 12/01/2017 |
| Note: Released By: JHINDMAN | |||
| PLUM | COMPLETE | 11/27/2017 | 12/01/2017 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 11/27/2017 | 11/30/2017 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 11/27/2017 | 12/01/2017 |
| Note: Released By: JNICHOLS This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 11/27/2017 | 11/28/2017 |
| Note: Held By: TAWILLIAMS Is the proposed driveway concrete or pavers? The site plan states concrete but a Right-Of-Way Utilization Agreement was submitted. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 07/24/2018 |
| REINSPECTION FEE | ¤40.00 | 07/24/2018 |
| REINSPECTION FEE | ¤40.00 | 07/24/2018 |
| REVISION | ¤40.00 | 07/24/2018 |
| REVISION | ¤40.00 | 07/24/2018 |
| SITE PLAN 20 | ¤20.00 | 12/20/2017 |
| SURCHARGE FS 533.721 | ¤14.00 | 12/20/2017 |
| SURCHARGE - FS 468.631 | ¤21.00 | 12/20/2017 |
| STORM WATER PERMIT FEES | ¤80.00 | 12/20/2017 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 12/20/2017 |
| NEW RESIDENTIAL INSPECTIONS | ¤562.00 | 12/20/2017 |
| ADMIN FEE | ¤20.00 | 12/20/2017 |
| ELECTRIC FEE | ¤228.60 | 12/20/2017 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 12/20/2017 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 12/20/2017 |
| IMPACT FEE PARKS | ¤849.24 | 12/20/2017 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 12/20/2017 |
| RECORDING FEE REIMBURSE DOC | ¤52.50 | 12/20/2017 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 12/20/2017 |
| MECHANICAL FEE | ¤228.60 | 12/20/2017 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 12/20/2017 |
| PLAN CHECK FEE | ¤112.40 | 12/20/2017 |
| PLUMBING FEE | ¤228.60 | 12/20/2017 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,434.62 |