Permit #2017110968
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-5112-00000-0100 |
| Block: 00000 |
| Subdivision: 1164 - PINE LAKES INDUSTRIAL PARK |
| Job Phone: 386-848-8596 |
| Location Address: 14 COMMERCE BLVD |
| Type: CGEN - COMMERCIAL GENERATOR |
| Issue Date: 02/06/2018 |
| NOC: RECORDED |
| Applicant name: FRANCISCO JOSE DELATORRE |
| Owner: DESIGNS FOR HEALTH INC |
|
Address 980 SOUTH STREET SUFFIELD, CT 06078 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤67,589.00 |
| Job Description: COMBINE TO EXIST SERV AND INSTALL 250KW GENERATOR W/ATS FOR ENTIRE FACILITY |
| Type: CN |
Contractor
PATH ELECTRICAL CONTRACTORS INC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
43927 COOTER POND RD DELAND, FL 32720 |
EC13006086 (Exp: 08/31/2024) | 386-848-8596 | 833-651-4676 X9 |
Inspection History
| Type | Request Date | Result | Inspector |
| LDSC- LANDSCAPE FINAL | 09/05/2018 | FINAL APPROVED | BDAWSON |
| FINAL | 09/04/2018 | FINAL APPROVED | CMINI |
| ELECTRIC 1ST ROUGH | 08/28/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: DID TORQUE,UNDERGROUND AND WIRE SIZE |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 07/06/2018 | 07/10/2018 |
| Note: Released By: DREWIS | |||
| ZON | COMPLETE | 07/02/2018 | 07/02/2018 |
| Note: Released By: JGONZALEZ | |||
| BLD | COMPLETE | 07/02/2018 | 07/06/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 04/26/2018 | 04/30/2018 |
| Note: Released By: DREWIS Held By: DREWIS Pease indicate what revisions are being made from the revision turned in on 4/9. Daniel Rewis 986-4736 | |||
| ELEC | COMPLETE | 04/09/2018 | 04/10/2018 |
| Note: Released By: DREWIS | |||
| PLLA | COMPLETE | 02/01/2018 | 02/02/2018 |
| Note: Released By: WBUTLER | |||
| PLLA | HOLD | 01/11/2018 | 01/23/2018 |
| Note: Held By: WBUTLER WMB 1/23/18 1) Section 11l03.01.H, Screening Plantings, requires generators and transformers that are visible from parking areas to be screened with shrubs 30" tall, 7-gallon containers and spaced no further apart than 4'. Provide a more detailed landscape plan for the shrubs noting the above sizes and spacing with plant variety and number of shrubs. If irrigation is not planned, plants need to be xeric so that they can be established by hand watering. Yaupon holly might be the best choice for this. | |||
| ZON | COMPLETE | 01/10/2018 | 01/11/2018 |
| Note: Released By: JGONZALEZ | |||
| PLUM | COMPLETE | 01/10/2018 | 01/16/2018 |
| Note: Released By: RLEE Self contained diesel | |||
| ZON | HOLD | 01/03/2018 | 01/03/2018 |
| Note: Held By: JGONZALEZ Provide a site plan to show the location of the gas tank include the size and setbacks or provide a copy of the gas permit. Show on the site plan the setback of the generator from side walk and building. Provide an landscape plan showing the screening of mechanical equipment. Per Chapter 11 subsection 11.03.01H Above ground structures such as: dumpster enclosures, mechanical equipment, backflow preventers, wells, pumps, tanks, ground-mounted HVAC units, transformers, generators, storage sheds, lift stations, utility cabinets, electrical panels, or ground-mounted cable/satellite television equipment If the structures are in areas that are visible from a parking lot or abutting property without an intervening buffer, fence, or wall, then a medium screen planting, as described in Table 11-4, shall be provided between the structures and the parking lot or abutting property.. | |||
| ELEC | COMPLETE | 12/20/2017 | 01/05/2018 |
| Note: Released By: DREWIS | |||
| PLUM | HOLD | 12/20/2017 | 01/03/2018 |
| Note: Held By: FREODICA Repeat comment: Provide gas contractor and gas riser for engine- generator fuel supply per FS 489/FBC 5th ed. 107.3.5. F.Reodica -386-986-4734. | |||
| PLUM | HOLD | 11/30/2017 | 12/19/2017 |
| Note: Held By: RLEE Provide gas contractor and gas riser for generator | |||
| ELEC | HOLD | 11/27/2017 | 11/30/2017 |
| Note: Held By: DREWIS Please provide a complete riser diagram depicting all equipment, conductors and conduits. Daniel Rewis 986-4736 |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EXTENSION | ¤40.00 | 09/04/2018 |
| REVISION | ¤40.00 | 09/04/2018 |
| REVISION | ¤40.00 | 09/04/2018 |
| REVISION | ¤40.00 | 09/04/2018 |
| SITE PLAN 20 | ¤20.00 | 04/13/2018 |
| SURCHARGE FS 533.721 | ¤5.62 | 04/13/2018 |
| SURCHARGE - FS 468.631 | ¤8.42 | 04/13/2018 |
| PLAN CHECK FEE | ¤100.00 | 04/13/2018 |
| ELECTRIC FEE | ¤100.80 | 04/13/2018 |
| ADMIN COMMERCIAL | ¤60.00 | 04/13/2018 |
| INSPECTION - COMMERCIAL ACCESS | ¤476.00 | 04/13/2018 |
| INSPECTION - COMMERCIAL ACCESS | ¤476.00 | 02/06/2018 |
| ELECTRIC FEE | ¤100.80 | 02/06/2018 |
| ADMIN COMMERCIAL | ¤60.00 | 02/06/2018 |
| PLAN CHECK FEE | ¤100.00 | 02/06/2018 |
| WORK WITHOUT PERMIT | ¤280.80 | 02/06/2018 |
| SURCHARGE - FS 468.631 | ¤8.42 | 02/06/2018 |
| SITE PLAN 20 | ¤20.00 | 02/06/2018 |
| SURCHARGE FS 533.721 | ¤5.62 | 02/06/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,982.48 |