I want to search for...
Permit #2017111108
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7027-00510-0190 |
| Block: 00510 |
| Subdivision: 2128 - SECTION 27-WYNNFIELD |
| Job Phone: (386)446-9626 |
| Location Address: 46 WOODBORN LN |
| Type: GEN - GENERATOR |
| Issue Date: 03/23/2018 |
| NOC: Unknown |
| Applicant name: JOHN FREDERICK WANERKA JR |
| Owner: CAPASSEE ALICIA LIFE ESTATE |
|
Address 46 WOODBORN LANE PALM COAST, FL 32164 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤2,400.00 |
| Job Description: Hook up 22KW Generator |
| Type: CN |
Contractor
WANERKA ELECTRIC OF FLORIDA. INC.
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
P.O. BOX 350214 BUNNELL, FL 32110 |
EC13003318 (Exp: 08/31/2022) | (386)446-9626 | (386)445-3131 |
Inspection History
| Type | Request Date | Result | Inspector |
| FINAL - BUILDING MISC | 09/14/2018 | FINAL APPROVED | JCOLASANTI |
| GAS ROUGH | 09/12/2018 | APPROVED | JGIBSON |
| GAS FINAL | 09/12/2018 | APPROVED | JGIBSON |
| GAS FINAL | 09/07/2018 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: GAS ROUGH HAS NOT BEEN SCHEDULED OR APPROVED FOR TEST PRESSURE | |||
| FINAL - BUILDING MISC | 07/03/2018 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: need gas rough and final completed before generator final | |||
| ELECTRIC UNDERGROUND | 03/26/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: NO U.G NEEDED, NEED CONTRACTOR ON SITE FOR FINAL TO START UP |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 02/23/2018 | 02/23/2018 |
| Note: Released By: AMOBLEY | |||
| ZON | HOLD | 01/04/2018 | 01/04/2018 |
| Note: Held By: AMOBLEY Generator can not be located in the 5ft easement. Drawing on site plan is showing it in the easement. | |||
| ZON | HOLD | 12/19/2017 | 12/20/2017 |
| Note: Held By: TAWILLIAMS Need to have size of pad on plan along with the setback to property line. | |||
| ZON | HOLD | 12/06/2017 | 12/06/2017 |
| Note: Held By: TDOAK REPEAT COMMENT Please show location of generator with the setbacks on the site plan for zoning to review. | |||
| PLUM | COMPLETE | 12/06/2017 | 12/11/2017 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 11/29/2017 | 12/05/2017 |
| Note: Released By: DREWIS | |||
| PLUM | HOLD | 11/29/2017 | 11/30/2017 |
| Note: Held By: JHINDMAN 1. Provide gas riser and contractor or a seperate permit must be applied for. J. hindman 986-3784. | |||
| ZON | HOLD | 11/29/2017 | 11/30/2017 |
| Note: Held By: AMOBLEY Please show location of generator with the setbacks on the site plan for zoning to review |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 09/11/2018 |
| REINSPECTION FEE | ¤40.00 | 08/16/2018 |
| SITE PLAN 20 | ¤20.00 | 03/23/2018 |
| SURCHARGE FS 533.721 | ¤2.00 | 03/23/2018 |
| SURCHARGE - FS 468.631 | ¤2.82 | 03/23/2018 |
| ADMIN FEE | ¤20.00 | 03/23/2018 |
| ELECTRIC FEE | ¤61.44 | 03/23/2018 |
| PLAN REVIEW 25 | ¤25.00 | 03/23/2018 |
| PLUMBING FEE | ¤61.44 | 03/23/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤272.70 |