Permit #2017120333

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01390-0130
CONDITIONED SPACE: 2340 sqft
GARAGE: 489 sqft
OPENED PORCH (WITH ROOF) : 287 sqft
OPENED PORCH (WITH ROOF) : 174 sqft
Total Square Footage: 3290 sqft
Block: 01390
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-672-6101
Location Address: 119 EDWARD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/09/2018
NOC: RECORDED
Applicant name: JOHN DAVID MINABERRY
Owner: THOMAS JOSEPH & CHERYL THOMAS H&W

Address

121 PINE LAKES PKWY N APT 609

PALM COAST, FL 32137

Lot: 0130
Contracted Stated Job Value: ¤367,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

KEYSTONE HOMES
Status Location Address State License Number Phone Fax
ACTIVE

1339 W GRANADA BLVD

ORMOND, FL 32174

CRC1329222 (Exp: 08/31/2026) 386-672-6101 386-672-6102

Sub Contractors

PETER JOSEPH LYDEN
Status Location Address State License Number Phone
CANCEL

17 UNIMAY CT

BUNNELL, FL 32110

EC0002436 (Exp: 08/31/2022) 386-931-2568
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
KENNETH P SECORSKY
Status Location Address State License Number Phone
ACTIVE

10050 NIKOLICH AVE

HASTINGS, FL 32145

CCC1331086 (Exp: 08/31/2026) 386-328-5359
PATTI MULLIGAN
Status Location Address State License Number Phone Fax
DECEASED

2803 REIS ST

PALATKA, FL 32177

21948 (Exp: 07/10/2021) 386-698-1033 386-698-1077

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 11/01/2018 FINAL APPROVED DROCKWELL
U -UTILITY RESIDENTIAL FINAL 10/30/2018 APPROVED DSPENCER
Note: the first result was in error that result was ment for another address please remove fee from first result approved
ROW - FINAL APRON (AFTER POUR) 10/29/2018 APPROVED KHOWELL
Note: THIS IS A REINSPECTION
ROW - FINAL INSPECTION 10/29/2018 FINAL APPROVED KHOWELL
Note: THIS IS A REINSPECTION
FINAL SURVEY (OFFICE USE ONLY) 10/29/2018 Disapproved - NO FEE DREWIS
Note: Left side property line elevations allow flow over the property line from the adjacent property, Tech. Manual; Sec. 5 Eng. Standard 300.01 A1 c6. Daniel Rewis 986-4736
FINAL SURVEY (OFFICE USE ONLY) 10/29/2018 APPROVED DREWIS
Note: THIS IS A REINSPECTION Final Survey approved per assurance drainage is correct by Kevin Howell with Stormwater Dept.
ELECTRIC - EARLY POWER 10/23/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED EARLY POWER 1:10
TIE BEAM / LINTEL 10/23/2018 APPROVED - AS NOTED DROCKWELL
Note: This was approved as a down cell inspection....DR
ROW - FINAL INSPECTION 10/23/2018 Disapproved -FEE REQUIRED KHOWELL
Note: 1. NEED MORE ELEVATION SHOTS ON THE BACK SIDE OF THE POOL TO SHOW THAT THE POOL DECK WILL NOT FLOOD DURNING A RAIN EVENT. 2. PLACE PINE STRAW ON BARE AREAS ON THE DITCH BANK IN THE REAR OF THE PROPERTY TO PREVENT EROSION.
ROW - FINAL APRON (AFTER POUR) 10/23/2018 Disapproved - NO FEE KHOWELL
Note: REMOVE CONCRETE AND DIRT FROM INSIDE THE CULVERT PIPE FOR INSPECTION
U - SEWER TIE IN 09/17/2018 APPROVED MBACON
GRAVITY SEWER TEST 09/17/2018 APPROVED JGIBSON
ROW- PRE-APRON (PRE-POUR) 09/11/2018 APPROVED - AS NOTED RGROSS
Note: SITE PLAN HAS 16 FT DRIVEWAY WIDTH. FORMED AS A 17 FT DRIVEWAY. REVISED SITE PLAN NEEDED BEFORE FINAL INSPECTION TO REFLECT 17 FT DRIVEWAY WIDTH.
ROW- PRE-APRON (PRE-POUR) 08/27/2018 Disapproved -FEE REQUIRED KHOWELL
Note: 2" OF CONCRETE REQUIRED ABOVE THE CULVERT PIPE OPENING. RECHECK THE MITER END SECTIONS FORM ARE REQUIRED TO BE 18" OFF THE EDGE OF PIPE AT THE TOP AND 9" OFF THE EDGE OF PIPE AT THE BOTTOM. COMPACT THE PAD AREA AND REPAIR WASH ANY OUTS
ELECTRIC UNDERGROUND 05/31/2018 APPROVED DROCKWELL
Note: per contractor
INSULATION 05/17/2018 APPROVED DROCKWELL
LATH/BRICK/ WATER BARRIER 05/07/2018 APPROVED DROCKWELL
ALL ROUGH 05/07/2018 APPROVED - AS NOTED DROCKWELL
Note: Remove drywall above service panel as so insulators can firecaulk wiring
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/03/2018 APPROVED DROCKWELL
Note: THIS IS A REINSPECTION
ROOF VALLEY & METAL 04/30/2018 APPROVED DROCKWELL
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/30/2018 Disapproved -FEE REQUIRED DROCKWELL
Note: Truss engineering shows 1/2 bolts at 4 ply at both bottom and top cords 4ft o/c
FOUND SURVEY APPROVED (OFFICE) 03/01/2018 APPROVED JHINDMAN
DOWN CELL 02/23/2018 APPROVED DROCKWELL
MONOLITHIC SLAB 02/14/2018 APPROVED DROCKWELL
PLUMBING 1ST ROUGH UNDERGROUND 02/09/2018 APPROVED JGIBSON
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 02/08/2018 Disapproved -FEE REQUIRED JGIBSON
Note: THIS IS A REINSPECTION PLUMBING RISER DIAGRAM MUST BE PRESENT FOR FIRST ROUGH PLUMBING INSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 02/07/2018 CANCELLED BY APPLICANT JGIBSON

Review History

Department Status Date In Date Out
SW1 COMPLETE 10/29/2018 10/29/2018
Note: Released By: DREWIS Final Survey approved per assurance drainage is correct by Kevin Howell with Stormwater Dept.
SW1 HOLD 10/25/2018 10/29/2018
Note: Held By: DREWIS Left side property line elevations allow flow over the property line from the adjacent property, Tech. Manual; Sec. 5 Eng. Standard 300.01 A1 c6. Daniel Rewis 986-4736
ELEC COMPLETE 10/19/2018 10/23/2018
Note: Released By: DREWIS
ZON HOLD 04/04/2018 04/04/2018
Note: Held By: TDOAK REPEAT COMMENT: Site plan must depict setbacks of proposed LP Tank to PROPERTY LINES
ZON COMPLETE 04/04/2018 04/05/2018
Note: Released By: TDOAK
ZON HOLD 04/03/2018 04/03/2018
Note: Held By: TDOAK Repeat comment - Site plan must depict setbacks from adjacent front and side property lines
PLUM COMPLETE 03/29/2018 03/29/2018
Note: Released By: FREODICA Revision: added gas riser diagram.
ZON HOLD 03/29/2018 03/29/2018
Note: Held By: TDOAK Site plan must depict setbacks of proposed LP Tank to property lines
SW1 COMPLETE 03/01/2018 03/01/2018
Note: Released By: JHINDMAN foundation s
BLD COMPLETE 02/08/2018 02/09/2018
Note: Released By: JHINDMAN
ZON COMPLETE 01/04/2018 01/04/2018
Note: Released By: AMOBLEY
ZON HOLD 12/21/2017 12/21/2017
Note: Held By: TAWILLIAMS Please take pool off landscape plan and site plan. The foundation plantings needs to be shown on rear of house. Can't approve plans with plantings out in the middle of the rear yard.
UD1 COMPLETE 12/21/2017 12/28/2017
Note: Released By: MBACON This is a PEP Tank area. The Pep Panel will be placed 5 feet from the front corner of the building on the same side of the building as the PEP tank that is marked on the Utility marked Site plan. Make sure the electrician places the PEP power wire between 3 feet and 5 feet from the ground. The plumber should exit the slab with the sewer pipe on the side of the building the tank will be on and matching the utility marked site plan, this will reduce any piping under driveways or sidewalks and minimize the fall required. The sewer tie-in inspection must be called in the day before the tie-in. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in visual inspection so he can witness the tie-in. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap.
PLUM COMPLETE 12/21/2017 12/27/2017
Note: Released By: FREODICA
SW1 COMPLETE 12/21/2017 12/28/2017
Note: Released By: JHINDMAN
ELEC COMPLETE 12/21/2017 01/03/2018
Note: Released By: DREWIS
BLD COMPLETE 12/12/2017 12/14/2017
Note: Released By: JHINDMAN
ELEC HOLD 12/12/2017 12/15/2017
Note: Held By: DREWIS Please provide load calculations and include signature and license number on them, FBC 107.1 Daniel Rewis 986-4736
ENGIN1 COMPLETE 12/12/2017 12/20/2017
Note: Released By: JHOWARD
MECH COMPLETE 12/12/2017 12/14/2017
Note: Released By: JHINDMAN
PLUM HOLD 12/12/2017 12/14/2017
Note: Held By: JHINDMAN 1. Provide a plumbing riser diagram 5th ed. FBC 107.3.5. J. Hindman 986-3784
SW1 HOLD 12/12/2017 12/15/2017
Note: Held By: DREWIS Please provide proposed survey measurements for the back and front of the residence in accordance with FBC R401.3. Daniel Rewis 986-4736
UD1 HOLD 12/12/2017 12/14/2017
Note: Held By: MBACON PEP Panel is not shown in the electrical plan. Submit a new electrical plan showing PEP Panel on the building on the same side of the building as indicated in the Utility marked site plan.
ZON HOLD 12/12/2017 12/13/2017
Note: Held By: TAWILLIAMS 1) Need 2 more shrubs along back of house. 2) All rear windows and doors needs banding.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 10/30/2018
REINSPECTION FEE ¤40.00 10/30/2018
REINSPECTION FEE ¤40.00 10/16/2018
REINSPECTION FEE ¤40.00 10/16/2018
REINSPECTION FEE ¤40.00 10/16/2018
REVISION ¤40.00 10/16/2018
REVISION ¤40.00 10/16/2018
CONTRACTOR CHANGE ¤40.00 10/16/2018
ELECTRIC FEE ¤280.20 01/09/2018
3% FIRE IMPACT FEE CREDIT (¤6.56) 01/09/2018
IMPACT FEE FIRE NONRESIDENTIAL ¤218.79 01/09/2018
IMPACT FEE PARKS ¤849.24 01/09/2018
IMPACT FEE SCHOOL ¤3,600.00 01/09/2018
IMPACT FEE TRANSPORTATION ¤3,124.67 01/09/2018
MECHANICAL FEE ¤280.20 01/09/2018
3% PARKS IMPACT FEE CREDIT (¤25.48) 01/09/2018
PLAN CHECK FEE ¤146.80 01/09/2018
PLUMBING FEE ¤280.20 01/09/2018
SITE PLAN 20 ¤20.00 01/09/2018
SURCHARGE FS 533.721 ¤17.61 01/09/2018
SURCHARGE - FS 468.631 ¤26.42 01/09/2018
STORM WATER PERMIT FEES ¤80.00 01/09/2018
3% TRANS IMPACT FEE CREDIT (¤93.74) 01/09/2018
NEW RESIDENTIAL INSPECTIONS ¤734.00 01/09/2018
ADMIN FEE ¤20.00 01/09/2018
Fees Total Due: ¤0.00 Total Paid: ¤9,872.35