Permit #2017120574
Permit Details
Status: COED
| Parcel Id: 39-12-31-3380-00000-0080 |
| Total Square Footage: 0 sqft |
| Block: 00000 |
| Subdivision: 2141 - KINGS POINTE COMMERCIAL SUBDIVISION |
| Job Phone: 407-791-9000 |
| Location Address: 6100 STATE RD 100 E |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 06/12/2018 |
| NOC: RECORDED |
| Applicant name: ASHLEY RAY RUMBLE |
| Owner: LOT 8 KINGS POINTE LLC |
|
Address 2 LAMBERT COVE FLAGLER BEACH, FL 32136 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤1,300,000.00 |
| Job Description: RaceTrac convenience store 5,411 sq ft |
| Type: CN |
Contractor
CCS CONSTRUCTION , LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2345 W SAND LAKE ROAD ORLANDO, FL 32809 |
SUITE 100 ORLANDO, FL 32809 |
CBC1257461 (Exp: 08/31/2026) | 407-791-9000 |
Sub Contractors
ROBERT W BINNS
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| INACTIVE |
ROBERT BINNS ROOFING INC WINTER HAVEN, FL 33880 |
5918 COUNTY RD 542 W` WINTER HAVEN, FL 33880 |
CCC1325548 (Exp: 08/31/2024) | 863-984-9685 | 863-984-9688 |
JAMES W GENGLER
| Status | Location Address | State License Number | Phone |
| INACTIVE |
205 COMPLEX DRIVE LAKELAND, FL 33801 |
CAC058235 (Exp: 08/31/2022) | 863-682-3803 |
JOHN FRANKLIN GERVOLINO
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3957 SALMON DR ORLANDO, FL 32835 |
EC13001387 (Exp: 08/31/2020) | 407-325-5323 |
ZENON ANTHONY SZOT
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2126 LARISSA COURT TRINITY, FL 34655 |
CFC057530 (Exp: 08/31/2020) | 727-376-8319 | 727-326-8576 |
DERRICK SCOTT HARGER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
975 SUNSHINE LANE ALTAMONTE SPRINGS, FL 32714 |
CFC1425861 (Exp: 08/31/2026) | (407)295-1000 | (407)295-0000 |
Inspection History
| Type | Request Date | Result | Inspector |
| U - UTILITY COMMERCIAL FINAL | 12/11/2018 | FINAL APPROVED | MBACON |
| U - UTILITY COMMERCIAL FINAL | 12/10/2018 | CANCELLED BY INSPECTOR | DSPENCER |
| Note: THIS IS A REINSPECTION all of the conditions of the developement order are not complete not ready for this inspection at this time no fee | |||
| U - UTILITY COMMERCIAL FINAL | 12/07/2018 | CANCELLED BY APPLICANT | LFITZGERALD |
| Note: THIS IS A REINSPECTION-final site still not ready | |||
| U - UTILITY COMMERCIAL FINAL | 12/06/2018 | CANCELLED BY APPLICANT | MBACON |
| Note: Not Ready | |||
| BUILDING FINAL | 12/06/2018 | APPROVED | JHINDMAN |
| Note: THIS IS A REINSPECTION | |||
| LDSC- LANDSCAPE FINAL | 12/06/2018 | CANCELLED BY INSPECTOR | BDAWSON |
| FIRE FINAL | 11/19/2018 | APPROVED | DREWIS |
| BUILDING FINAL | 11/19/2018 | PARTIALLY APPROVED | RLEE |
| Note: still need to complete building items stone missing on exterior bath accessory fixtures need hung | |||
| ELECTRIC FINAL | 11/16/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: NEED SIGN AT ROLL UP DOOR INDICATING SERVICE DISCONNECT | |||
| U-GREASE INTERCEPTOR PRE-INSTALLATION | 11/15/2018 | APPROVED | MBACON |
| U-GREASE INTERCEPTOR INSTALLED/PLUMBED | 11/15/2018 | APPROVED | MBACON |
| U-GREASE INTERCEPTOR FLOW/DYE TESTED | 11/15/2018 | APPROVED | MBACON |
| U - SEWER TIE IN | 11/15/2018 | APPROVED - AS NOTED | JGIBSON |
| Note: MARTY BACON MEET ME ON THIS INSPECTION BECAUSE OF HIS KNOWLEDGE OF JOB SITE | |||
| PLUMBING FINAL | 11/14/2018 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED TO PLUG DRAIN ON ROOF TOP YARD HYDRANT, NEED TO INSTALL NEW CELINOID FOR BUBBLER BEFORE BUILDING FINAL | |||
| ELECTRIC FINAL | 11/09/2018 | PARTIALLY APPROVED | RMARTIN |
| Note: PENDING HEADS ON POLES,TESTING THEM,MAIN DISCONNECT LABEL ON ROLL UP DOOR | |||
| ELECTRIC OTHER | 11/07/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: LOOKED AT RTU MOCP ALL ROOF TOP UNITS | |||
| ELECTRIC - EARLY POWER | 11/07/2018 | APPROVED | RMARTIN |
| ELECTRIC 2ND ROUGH | 10/31/2018 | APPROVED | RMARTIN |
| ELECTRIC - EARLY POWER | 10/30/2018 | APPROVED | RMARTIN |
| PLUMBING FINAL | 10/30/2018 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: NOT READY SINKS NOT IN MISSING MIXING VALVE AT HEATER SAN - TEES AT 3 COMPARTMENT SINK ROOF HYDRANT NOT INSTALLED INCOMPLETE INSPECTION | |||
| HVAC FINAL | 10/29/2018 | APPROVED | JHINDMAN |
| HVAC FINAL | 10/26/2018 | Disapproved - NO FEE | JHINDMAN |
| Note: units must be operational for inspection. 6th ed. FBC 110. | |||
| ELECTRIC - EARLY POWER | 10/26/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: panels | |||
| ELECTRIC - EARLY POWER | 10/24/2018 | APPROVED | RMARTIN |
| ELECTRIC - EARLY POWER | 10/23/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: panels m1,m2 | |||
| HVAC ROUGH | 10/22/2018 | APPROVED | CMINI |
| PLUMBING 2ND ROUGH | 10/22/2018 | APPROVED - AS NOTED | JGIBSON |
| Note: THIS WAS FOR INSULATION ON WATER LINES IN CEILING AREAS | |||
| ABOVE CEILING | 10/22/2018 | APPROVED | CMINI |
| FRAMING | 10/19/2018 | APPROVED - AS NOTED | DROCKWELL |
| Note: Patio column wraps | |||
| ELECTRIC - EARLY POWER | 10/19/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: POWER TO PANEL FOR RTU1 AND2 | |||
| ELECTRIC - EARLY POWER | 10/17/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 2:45 | |||
| LATH/BRICK/WATER BARRIER | 10/08/2018 | APPROVED | DROCKWELL |
| ELECTRIC 2ND ROUGH | 09/14/2018 | Disapproved - NO FEE | RMARTIN |
| Note: NOT READY, CONDUITS ABOVE MDP | |||
| HVAC ROUGH | 09/13/2018 | PARTIALLY APPROVED | CMINI |
| Note: duct seal on all, ok to wrap all | |||
| HVAC ROUGH | 09/12/2018 | PARTIALLY APPROVED | CMINI |
| Note: main trunck lines duct seal, highlighted on plan | |||
| WINDOW NAILING | 09/12/2018 | APPROVED | CMINI |
| MONOLITHIC SLAB | 09/12/2018 | PARTIALLY APPROVED | CMINI |
| Note: tank slab | |||
| WINDOW NAILING | 09/07/2018 | CANCELLED BY APPLICANT | DROCKWELL |
| INSULATION | 09/07/2018 | APPROVED | DROCKWELL |
| PLUMBING 2ND ROUGH | 09/07/2018 | PARTIALLY APPROVED | JGIBSON |
| Note: THIS WAS FOR ROOF DRAINS ''3'' | |||
| ELECTRIC 2ND ROUGH | 09/07/2018 | APPROVED | RMARTIN |
| ELECTRIC 2ND ROUGH | 09/06/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: HIGH CEILING ONLY | |||
| PLUMBING 2ND ROUGH | 09/06/2018 | PARTIALLY APPROVED | JGIBSON |
| Note: BATHROOM AND KITCHEN WALL AREAS ARE GOOD AND PER PLAN, NEED ROOF DRAINS TESTED AND INSPECTED, WILL CALL WHEN READY | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 09/06/2018 | APPROVED | CMINI |
| FRAMING | 09/06/2018 | PARTIALLY APPROVED | CMINI |
| Note: interior framing | |||
| FRAMING | 09/05/2018 | CANCELLED BY APPLICANT | CMINI |
| Note: THIS IS A REINSPECTION. plumbing inspection did not pass, need to have allelec tric and plumbing pass before framing inspection | |||
| PLUMBING 1ST ROUGH | 09/05/2018 | CANCELLED BY INSPECTOR | JGIBSON |
| Note: THIS IS A REINSPECTION this was wrong inspection called in needs to have second rough plumbing added to permit | |||
| ELECTRIC 2ND ROUGH | 09/05/2018 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION walls only | |||
| ELECTRIC 2ND ROUGH | 08/31/2018 | PARTIALLY APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION patio marked on print | |||
| INSULATION | 08/31/2018 | CANCELLED BY APPLICANT | DROCKWELL |
| Note: THIS IS A REINSPECTION | |||
| INSULATION | 08/29/2018 | PARTIALLY APPROVED | DROCKWELL |
| Note: Exterior wall insulation where coolers will be located | |||
| ELECTRIC 2ND ROUGH | 08/28/2018 | PARTIALLY APPROVED | RMARTIN |
| Note: COOLER WALLS MARKED ON PRINT | |||
| EXTERIOR WALL SHEATHING / SHEARWALL | 08/27/2018 | PARTIALLY APPROVED | DROCKWELL |
| Note: Exterior walls only.No entry columns or overhange yet | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 08/23/2018 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION. ISO board screw down | |||
| MONOLITHIC SLAB | 08/23/2018 | APPROVED - AS NOTED | CMINI |
| Note: patio slab at front | |||
| HVAC ROUGH | 08/23/2018 | CANCELLED BY APPLICANT | CMINI |
| FRAMING | 08/20/2018 | PARTIALLY APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION/ Lower exterior wall framing and upper framing complete | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 08/20/2018 | PARTIALLY APPROVED | DROCKWELL |
| Note: Upper exterior wall sheathing at the interior of the studs roof side.Needed for dry-in prep Marked and dated on plans | |||
| FRAMING | 08/16/2018 | PARTIALLY APPROVED | DROCKWELL |
| Note: Roof framing exterior walls only | |||
| FOOTER | 07/24/2018 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION, 2 pier columns changed to concrete, need revision by next inspection | |||
| ELECTRIC TEMP POLE | 07/24/2018 | CANCELLED BY INSPECTOR | DREWIS |
| Note: Temp pole will be inspected under permit 2018070868. Daniel Rewis 986-4736 | |||
| ELECTRIC OTHER | 07/20/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: UFER BONDING IN SLAB | |||
| MONOLITHIC SLAB | 07/20/2018 | APPROVED | DROCKWELL |
| ELECTRIC 1ST ROUGH | 07/18/2018 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH | 07/13/2018 | APPROVED | JGIBSON |
| Note: THIS COMPLETES ALL UNDER GROUND PLUMBING | |||
| PLUMBING 1ST ROUGH | 07/12/2018 | PARTIALLY APPROVED | JGIBSON |
| Note: BATHROOMS AND PATIO FLOOR DRAINS THAT ARE NOT TIED INTO SANITARY THEY ARE TIED INTO STORM DRAIN NO PRIMERS NEEDED | |||
| ELECTRIC 1ST ROUGH | 07/11/2018 | PARTIALLY APPROVED | RMARTIN |
| Note: UNDERGROUND OUT OF BUILDING, MARKED ON PLAN | |||
| FOOTER | 07/05/2018 | PARTIALLY APPROVED | DROCKWELL |
| Note: THIS IS A REINSPECTION/ Column footers only.Marked and dated on plans | |||
| FOOTER | 06/29/2018 | PARTIALLY APPROVED | JHINDMAN |
| Note: spread footings inside building. 2. informed contractor to remove generator from conx roof and ground the system. |
Review History
| Department | Status | Date In | Date Out |
| PLUM | COMPLETE | 07/30/2018 | 07/30/2018 |
| Note: Released By: FREODICA Revision 4 dated 06-01-18 | |||
| MECH | COMPLETE | 07/30/2018 | 07/31/2018 |
| Note: Released By: FREODICA Revision 4 dated 06-01-18 | |||
| BLD | COMPLETE | 06/13/2018 | 06/27/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 06/13/2018 | 06/21/2018 |
| Note: Released By: DREWIS | |||
| MECH | HOLD | 06/13/2018 | 06/21/2018 |
| Note: Held By: FREODICA Revision 4 dated 6-1-18: Provide revision form with description of changes and a "clowded symbol " on revised mechanical plans to identify the changes done per FBC 6th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| PLUM | HOLD | 06/13/2018 | 06/21/2018 |
| Note: Held By: FREODICA Revision 4 dated 6-1-18: Provide revision form with description of changes and a "clowded symbol " on revised plumbing plans to identify the changes done per FBC 6th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| FI1 | COMPLETE | 06/13/2018 | 06/28/2018 |
| Note: Released By: JHINDMAN | |||
| UD1 | COMPLETE | 03/12/2018 | 03/12/2018 |
| Note: Released By: DRAMIREZ | |||
| DSD | COMPLETE | 02/28/2018 | 03/06/2018 |
| Note: Released By: DRAMIREZ | |||
| BLD | COMPLETE | 02/27/2018 | 02/28/2018 |
| Note: Released By: JHINDMAN | |||
| FI1 | COMPLETE | 02/27/2018 | 02/28/2018 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 02/27/2018 | 02/28/2018 |
| Note: Released By: JGONZALEZ | |||
| UD1 | HOLD | 02/27/2018 | 03/01/2018 |
| Note: Held By: CJOHNSON Fees and agreements shall be complete prior to issuance of building permit | |||
| ZON | HOLD | 02/13/2018 | 02/15/2018 |
| Note: Held By: JGONZALEZ Approved Development order required | |||
| UD1 | HOLD | 02/13/2018 | 02/20/2018 |
| Note: Held By: CJOHNSON Fees and agreements shall be complete prior to issuance of building permit | |||
| MECH | COMPLETE | 02/13/2018 | 02/14/2018 |
| Note: Released By: FREODICA | |||
| PLUM | COMPLETE | 02/13/2018 | 02/14/2018 |
| Note: Released By: FREODICA | |||
| FI1 | HOLD | 02/13/2018 | 02/15/2018 |
| Note: Held By: JHINDMAN 1. Provide technical specification that the unit has been tested for ventless operation. UL 710b. J. hindman 986-3784. | |||
| BLD | HOLD | 02/13/2018 | 02/15/2018 |
| Note: Held By: JHINDMAN 1 The revised plans are not digitally signed and sealed. Provide a digitally signed and sealed set of plans. Digital signatures must comply with Florida Statues Chapter 481 and Florida Administrative Rule 61G1-16.005 for architects or Florida Statutes Chapter 471 and Florida Administrative Rule 61G15-23.003 for Engineers. The following statement must accompany a digital signature “This item has been electronically signed and sealed by (name) On (date) using a Digital Signature”. Certificate Authority services can be purchased through a third party certification authority to include, but not limited to: • • Entrust • • eTrust • • GeoTrust • • GlobalSign • • IdenTrust • • Verisign A digitally created image of the seal must be on the plans for printing purposes. J. Hindman 986-3784. | |||
| BLD | HOLD | 12/18/2017 | 12/29/2017 |
| Note: Held By: JHINDMAN 1. Provide the correct code reference 2011 National Electric Code not the 2014 NEC. 2. Seperate permits are required for the Fuel Canopy, Dumpster enclosure, Hood and Suppression systems. J. Hindman 986-3784. | |||
| ELEC | COMPLETE | 12/18/2017 | 12/20/2017 |
| Note: Released By: DREWIS | |||
| FI1 | HOLD | 12/18/2017 | 12/29/2017 |
| Note: Held By: JHINDMAN 1. Provide a type 1 hood with supression system for the convection ovens. nfpa96. | |||
| MECH | HOLD | 12/18/2017 | 12/28/2017 |
| Note: Held By: FREODICA Mechanical plans shall be digitally signed and sealed by design engineer per FBC 5th ed. 107.3. F.Reodica - 386-986-4734. | |||
| PLUM | HOLD | 12/18/2017 | 12/29/2017 |
| Note: Held By: FREODICA Provide digitally signed and sealed plumbing plans by design engineer per FBC 5th ed. 107.3. F.Reodica -386-986-4734. | |||
| UD1 | HOLD | 12/18/2017 | 12/22/2017 |
| Note: Held By: CJOHNSON Fees, agreements and FDEP permits or Engineers Letter of Determination shall be complete prior to issuance of building permit | |||
| ZON | HOLD | 12/18/2017 | 12/19/2017 |
| Note: Held By: JGONZALEZ Approved Development order required . |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| AUTHORIZATION LETTER | ¤500.00 | 11/19/2018 |
| REINSPECTION FEE | ¤40.00 | 11/13/2018 |
| REVISION | ¤40.00 | 08/17/2018 |
| REVISION | ¤40.00 | 08/17/2018 |
| CONTRACTOR CHANGE | ¤40.00 | 08/17/2018 |
| CONTRACTOR CHANGE | ¤40.00 | 08/17/2018 |
| ELECTRIC FEE | ¤840.00 | 06/12/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤45.03) | 06/12/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤1,501.01 | 06/12/2018 |
| IMPACT FEE TRANSPORTATION | ¤104,751.44 | 06/12/2018 |
| MECHANICAL FEE | ¤840.00 | 06/12/2018 |
| PLAN CHECK FEE | ¤1,495.00 | 06/12/2018 |
| PLUMBING FEE | ¤840.00 | 06/12/2018 |
| SITE PLAN 20 | ¤20.00 | 06/12/2018 |
| SURCHARGE FS 533.721 | ¤40.95 | 06/12/2018 |
| SURCHARGE - FS 468.631 | ¤61.43 | 06/12/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤3,142.54) | 06/12/2018 |
| INSPECTION - COMMERCIAL ADD | ¤9,100.00 | 06/12/2018 |
| CONTRACTOR CHANGE | ¤40.00 | 06/12/2018 |
| CONTRACTOR CHANGE | ¤80.00 | 06/12/2018 |
| ADMIN COMMERCIAL | ¤60.00 | 06/12/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤117,182.26 |