I want to search for...
Permit #2017120918
Permit Details
Status: FINAL
| Block: 00000 |
| Subdivision: 1164 - PINE LAKES INDUSTRIAL PARK |
| Job Phone: 386-238-1570 |
| Location Address: 10 COMMERCE BLVD |
| Type: CSD - COMMERCIAL SITE DEVELOPMENT |
| Issue Date: 01/17/2018 |
| NOC: RECORDED |
| Applicant name: GARY LYNN ROBERTS |
| Owner: DESIGNS FOR HEALTH INC |
|
Address 980 SOUTH STREET SUFFIELD, CT 06078 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤192,600.00 |
| Job Description: GIOIA SAILS - COMMERCIAL SITE DEVELOPMENT |
| Type: CN |
Contractor
COMMERCIAL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
7 SUNSHINE BLVD ORMOND BEACH, FL 32174 |
CGC059441 (Exp: 08/31/2026) | 386-238-1570 | 386-238-1571 |
Inspection History
| Type | Request Date | Result | Inspector |
| LDSC- LANDSCAPE / IRRIGATION AS-BUILT | 10/04/2018 | FINAL APPROVED | WBUTLER |
| Note: Landscape Bond for 60 days was submitted and approved. | |||
| LDSC-PRE-PLANTING TREE QUALITY | 10/03/2018 | APPROVED - AS NOTED | WBUTLER |
| Note: This project has a landscape surety bond so permits will be closed out and handled by inspection by the City Landscape Architect. | |||
| LDSC-IRRIGATION FINAL | 10/03/2018 | APPROVED - AS NOTED | WBUTLER |
| Note: This project has a surety bond for the landscape and irrigation and permit will be closed out and future inspections done through the City landscape architect. | |||
| LDSC-SITE LIGHT STAKE LOCATE | 10/02/2018 | APPROVED | BDAWSON |
| BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS | 10/02/2018 | APPROVED | CMINI |
| BLD- ADA PARKING | 10/02/2018 | FINAL APPROVED | CMINI |
| BLD - ADA COMPLIANT | 10/02/2018 | FINAL APPROVED | CMINI |
| BLD - UNDERGROUND SITE LIGHTING CONDUITS | 10/02/2018 | APPROVED | RMARTIN |
| BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS | 10/02/2018 | APPROVED | RMARTIN |
| PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY | 10/02/2018 | APPROVED | JNICHOLS |
| FIRE MAIN HYDROSTATIC/BACKFLOW PREVENTOR | 10/02/2018 | CANCELLED BY INSPECTOR | DREWIS |
| Note: Wrong permit. | |||
| LDSC-SITE LIGHTING / SHIELDING | 10/02/2018 | APPROVED | BDAWSON |
| U-GRAVITY SEWER INSTALL/TESTING | 09/26/2018 | APPROVED | JNICHOLS |
| U-WATER MAIN DISINFECTION | 09/26/2018 | APPROVED | JNICHOLS |
| U-WATER MAIN DISINFECTION SAMPLING | 09/26/2018 | APPROVED | JNICHOLS |
| U-WATER METER INSTALLATION/VERIFICATION | 09/26/2018 | APPROVED | JNICHOLS |
| U - UTILITY COMMERCIAL FINAL | 09/26/2018 | FINAL APPROVED | JNICHOLS |
| U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR | 09/26/2018 | APPROVED | JNICHOLS |
| U-WATER SERVICE INSTALLATION | 09/26/2018 | APPROVED | JNICHOLS |
| FIRE MAIN HYDROSTATIC/BACKFLOW PREVENTOR | 09/24/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: need test paperwork as requested through fire underground permit | |||
| LDSC-TREE BARRICADE | 09/21/2018 | APPROVED | WBUTLER |
| LDSC-SITE LIGHTING / SHIELDING | 09/20/2018 | Disapproved -FEE REQUIRED | WBUTLER |
| Note: WMB 9/20/18 The wall pack lights located over all of the doors of the building were not shown or detail provided on either the site development plan, building permit plans or the building elevation plans. These fixtures do not meet the City requirement for shielding and must be replaced with an acceptable fixture. Also, the other exterior lights that were not shown on any of the plans were the down lights under the awnings on the north and northeast sides of the building. These fixtures need a shield on the north side of the fixture so that the actual light source cannot be seen from the right-of-way. Need to submit a modification to the Site Development Permit as well as the Building Permit to show these fixtures and provide a cut sheet detail of what they look like. | |||
| LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) | 09/20/2018 | APPROVED - AS NOTED | WBUTLER |
| Note: WMB 9/20/18 Owner intends to bond the landscape and irrigaiton for this project. Once all the necessary documents have been submitted to do this, the Final Landscape and Irrigation inspection can be called in and finaled so the owner can get his C.O. | |||
| U-GRAVITY SEWER INSTALL/TESTING | 07/02/2018 | PARTIALLY APPROVED | MBACON |
| Note: First sanitary sewer manhole was installed and tied into existing sanitary sewer. | |||
| LDSC-LOCATE BACKFLOW PREVENTOR OR PAD/ ELEC TRANS | 06/13/2018 | APPROVED | WBUTLER |
| SILT FENCE | 02/14/2018 | APPROVED | JNICHOLS |
| LDSC-TREE BARRICADE | 02/14/2018 | APPROVED | WBUTLER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 12/28/2017 | 01/02/2018 |
| Note: Released By: RLEE | |||
| DSD | COMPLETE | 12/28/2017 | 01/03/2018 |
| Note: Released By: DRAMIREZ | |||
| ENGIN1 | COMPLETE | 12/28/2017 | 01/02/2018 |
| Note: Released By: TBAKER | |||
| PLLA | COMPLETE | 12/28/2017 | 01/02/2018 |
| Note: Released By: WBUTLER | |||
| UD1 | COMPLETE | 12/28/2017 | 01/08/2018 |
| Note: Released By: CJOHNSON |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 10/03/2018 |
| REINSPECTION FEE | ¤40.00 | 10/03/2018 |
| SITE PLAN 20 | ¤20.00 | 01/17/2018 |
| INSPECTION 40 | ¤560.00 | 01/17/2018 |
| PERMIT FEE | ¤125.00 | 01/17/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤785.00 |