Permit #2017120918

Permit Details

Status: FINAL

Block: 00000
Subdivision: 1164 - PINE LAKES INDUSTRIAL PARK
Job Phone: 386-238-1570
Location Address: 10 COMMERCE BLVD
Type: CSD - COMMERCIAL SITE DEVELOPMENT
Issue Date: 01/17/2018
NOC: RECORDED
Applicant name: GARY LYNN ROBERTS
Owner: DESIGNS FOR HEALTH INC

Address

980 SOUTH STREET

SUFFIELD, CT 06078

Lot: 0080
Contracted Stated Job Value: ¤192,600.00
Job Description: GIOIA SAILS - COMMERCIAL SITE DEVELOPMENT
Type: CN

Contractor

COMMERCIAL CONSTRUCTION INC.
Status Location Address State License Number Phone Fax
ACTIVE

7 SUNSHINE BLVD

ORMOND BEACH, FL 32174

CGC059441 (Exp: 08/31/2026) 386-238-1570 386-238-1571

Inspection History

Type Request Date Result Inspector
LDSC- LANDSCAPE / IRRIGATION AS-BUILT 10/04/2018 FINAL APPROVED WBUTLER
Note: Landscape Bond for 60 days was submitted and approved.
LDSC-PRE-PLANTING TREE QUALITY 10/03/2018 APPROVED - AS NOTED WBUTLER
Note: This project has a landscape surety bond so permits will be closed out and handled by inspection by the City Landscape Architect.
LDSC-IRRIGATION FINAL 10/03/2018 APPROVED - AS NOTED WBUTLER
Note: This project has a surety bond for the landscape and irrigation and permit will be closed out and future inspections done through the City landscape architect.
LDSC-SITE LIGHT STAKE LOCATE 10/02/2018 APPROVED BDAWSON
BLD - ADA RAMPS/SIDEWALKS/CROSSWALKS 10/02/2018 APPROVED CMINI
BLD- ADA PARKING 10/02/2018 FINAL APPROVED CMINI
BLD - ADA COMPLIANT 10/02/2018 FINAL APPROVED CMINI
BLD - UNDERGROUND SITE LIGHTING CONDUITS 10/02/2018 APPROVED RMARTIN
BLD - SITE LIGHTING-CONDUCTORS/CONNECTORS 10/02/2018 APPROVED RMARTIN
PLANNING - OFFICE USE - FINAL AS-BUILT SURVEY 10/02/2018 APPROVED JNICHOLS
FIRE MAIN HYDROSTATIC/BACKFLOW PREVENTOR 10/02/2018 CANCELLED BY INSPECTOR DREWIS
Note: Wrong permit.
LDSC-SITE LIGHTING / SHIELDING 10/02/2018 APPROVED BDAWSON
U-GRAVITY SEWER INSTALL/TESTING 09/26/2018 APPROVED JNICHOLS
U-WATER MAIN DISINFECTION 09/26/2018 APPROVED JNICHOLS
U-WATER MAIN DISINFECTION SAMPLING 09/26/2018 APPROVED JNICHOLS
U-WATER METER INSTALLATION/VERIFICATION 09/26/2018 APPROVED JNICHOLS
U - UTILITY COMMERCIAL FINAL 09/26/2018 FINAL APPROVED JNICHOLS
U-WATER MAIN INSTALLATION/TESTING/BACKFLOW PREVENTOR 09/26/2018 APPROVED JNICHOLS
U-WATER SERVICE INSTALLATION 09/26/2018 APPROVED JNICHOLS
FIRE MAIN HYDROSTATIC/BACKFLOW PREVENTOR 09/24/2018 Disapproved -FEE REQUIRED WMILLER
Note: need test paperwork as requested through fire underground permit
LDSC-TREE BARRICADE 09/21/2018 APPROVED WBUTLER
LDSC-SITE LIGHTING / SHIELDING 09/20/2018 Disapproved -FEE REQUIRED WBUTLER
Note: WMB 9/20/18 The wall pack lights located over all of the doors of the building were not shown or detail provided on either the site development plan, building permit plans or the building elevation plans. These fixtures do not meet the City requirement for shielding and must be replaced with an acceptable fixture. Also, the other exterior lights that were not shown on any of the plans were the down lights under the awnings on the north and northeast sides of the building. These fixtures need a shield on the north side of the fixture so that the actual light source cannot be seen from the right-of-way. Need to submit a modification to the Site Development Permit as well as the Building Permit to show these fixtures and provide a cut sheet detail of what they look like.
LDSC- SUBSTANTIAL COMPLETE (OFFICE USE) 09/20/2018 APPROVED - AS NOTED WBUTLER
Note: WMB 9/20/18 Owner intends to bond the landscape and irrigaiton for this project. Once all the necessary documents have been submitted to do this, the Final Landscape and Irrigation inspection can be called in and finaled so the owner can get his C.O.
U-GRAVITY SEWER INSTALL/TESTING 07/02/2018 PARTIALLY APPROVED MBACON
Note: First sanitary sewer manhole was installed and tied into existing sanitary sewer.
LDSC-LOCATE BACKFLOW PREVENTOR OR PAD/ ELEC TRANS 06/13/2018 APPROVED WBUTLER
SILT FENCE 02/14/2018 APPROVED JNICHOLS
LDSC-TREE BARRICADE 02/14/2018 APPROVED WBUTLER

Review History

Department Status Date In Date Out
BLD COMPLETE 12/28/2017 01/02/2018
Note: Released By: RLEE
DSD COMPLETE 12/28/2017 01/03/2018
Note: Released By: DRAMIREZ
ENGIN1 COMPLETE 12/28/2017 01/02/2018
Note: Released By: TBAKER
PLLA COMPLETE 12/28/2017 01/02/2018
Note: Released By: WBUTLER
UD1 COMPLETE 12/28/2017 01/08/2018
Note: Released By: CJOHNSON

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 10/03/2018
REINSPECTION FEE ¤40.00 10/03/2018
SITE PLAN 20 ¤20.00 01/17/2018
INSPECTION 40 ¤560.00 01/17/2018
PERMIT FEE ¤125.00 01/17/2018
Fees Total Due: ¤0.00 Total Paid: ¤785.00