Permit #2017120920
Permit Details
Status: COED
| Block: 00000 |
| Subdivision: 1164 - PINE LAKES INDUSTRIAL PARK |
| Job Phone: 386-238-1570 |
| Location Address: 10 COMMERCE BLVD |
| Type: BC - BUILDING COMMERCIAL |
| Issue Date: 03/16/2018 |
| NOC: RECORDED |
| Applicant name: GARY LYNN ROBERTS |
| Owner: GIOIA PROPERTIES LLC |
|
Address PO BOX 352918 PALM COAST, FL 32135 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤1,700,000.00 |
| Job Description: 30,000 SQ FT BUILDING (GIOIA SAILS) |
| Type: CN |
Contractor
COMMERCIAL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
7 SUNSHINE BLVD ORMOND BEACH, FL 32174 |
CGC059441 (Exp: 08/31/2026) | 386-238-1570 | 386-238-1571 |
Sub Contractors
GARY S WELBORN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1709 North Nova Road Holly Hill, 32117 |
CFC1426839 (Exp: 08/31/2026) | (386) 257-1172 | 386-252-5979 |
MICHAEL SCOTT CAIN
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
45 HUMMINGBIRD LANE ORMOND BEACH, FL 32174 |
EC13003801 (Exp: 08/31/2024) | (386)547-7102 | 386-265-1989 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
Inspection History
| Type | Request Date | Result | Inspector |
| U - UTILITY COMMERCIAL FINAL | 10/09/2018 | APPROVED | JNICHOLS |
| Note: From: Jim Nichols Sent: Tuesday, October 9, 2018 2:10 PM To: Chris Johnson <CJohnson@palmcoastgov.com> Subject: RE: gioia sails - 2017120920 Yes I had gone by earlier today and my stuff looked good. From: Chris Johnson Sent: Tuesday, October 9, 2018 10:02 AM To: Jim Nichols <JNichols@palmcoastgov.com> Cc: Barbie Bembry <BBembry@palmcoastgov.com> Subject: FW: gioia sails - 2017120920 Jim, Are you OK with finaling out Gioia Sails? It doesn’t look like the final was requested | |||
| GRAVITY SEWER | 10/03/2018 | FINAL APPROVED | JNICHOLS |
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 09/24/2018 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION, revision obtained | |||
| PLUMBING FINAL | 09/21/2018 | APPROVED | CMINI |
| HVAC FINAL | 09/21/2018 | APPROVED | CMINI |
| ELECTRIC FINAL | 09/21/2018 | APPROVED | CMINI |
| Note: CANCELLED BY CONTRACTOR | |||
| BUILDING FINAL | 09/21/2018 | FINAL APPROVED | WMILLER |
| Note: PENDING PLUMBING, HVAC, AND ELECTRIC, FINALS | |||
| FIRE FINAL | 09/21/2018 | FINAL APPROVED | WMILLER |
| Note: FINAL FIRE APPROVED | |||
| BLD - SITE LIGHTING-POLE SET/FIXTURE | 09/20/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: APPROVED PLAN ON EXTERIOR LIGHTS DO NOT MATCH WHAT IS INSTALLED | |||
| HVAC FINAL | 09/19/2018 | CANCELLED BY APPLICANT | CMINI |
| ELECTRIC FINAL | 09/19/2018 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: APPROVED PLANS NEED TO MATCH PANEL SCHEDULES IN ALL PANELS, NEED TO SHOW WELL CIRCUIT, NEED TO LABEL MOCP ON ALL AHUS | |||
| U-WATER SERVICE INSTALLATION | 09/19/2018 | APPROVED | JNICHOLS |
| FIREWALL FINAL | 09/18/2018 | APPROVED | CMINI |
| INSULATION | 09/18/2018 | APPROVED | CMINI |
| FRAMING | 09/18/2018 | APPROVED - AS NOTED | CMINI |
| Note: need revision by final showing new opening into tenant space | |||
| DOWN CELL | 09/18/2018 | APPROVED - AS NOTED | CMINI |
| Note: all down cell complete | |||
| LATH/BRICK/WATER BARRIER | 09/10/2018 | APPROVED | CMINI |
| ELECTRIC 2ND ROUGH | 09/10/2018 | APPROVED | RMARTIN |
| ELECTRIC - EARLY POWER | 09/07/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED EARLY POWER 1:45 | |||
| PLUMBING 2ND ROUGH | 09/07/2018 | APPROVED - AS NOTED | JGIBSON |
| Note: NEED SHUT OFF FOR HOSE BIB BEFORE PLUMBING FINAL | |||
| ELECTRIC 2ND ROUGH | 09/06/2018 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: CONTRACTOR NOT ON SITE, NO ELECTRICIAN ON SITE, NEED SOMEONE ON SITE FOR DIRECTION ON WHAT INSPECTION IS FOR | |||
| ABOVE CEILING | 09/04/2018 | APPROVED | CMINI |
| HVAC ROUGH | 08/31/2018 | APPROVED | CMINI |
| EXTERIOR WALL SHEATHING / SHEARWALL | 08/30/2018 | APPROVED - AS NOTED | CMINI |
| Note: densglas | |||
| FRAMING | 08/28/2018 | APPROVED - AS NOTED | CMINI |
| Note: revision aquired and corrected for framing | |||
| ELECTRIC - EARLY POWER | 08/09/2018 | CANCELLED BY APPLICANT | RMARTIN |
| Note: CANCELLED BY ELECTRICAL CONTRACTOR | |||
| ELECTRIC 2ND ROUGH | 08/08/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: NEED REVISION ON ADDED REST ROOM/ELECTRIC BY FINAL | |||
| FRAMING | 07/20/2018 | PARTIALLY APPROVED | JHINDMAN |
| Note: rear bathroom and front entry framing except ceiling. Provide revision for ceiling framing. | |||
| FRAMING | 07/16/2018 | PARTIALLY APPROVED | JCOLASANTI |
| Note: bracing ok for trusses at entrance | |||
| FRAMING | 07/12/2018 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: need engineering per truss drawings for girder truss T4 FBC 802 | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 07/12/2018 | APPROVED | JCOLASANTI |
| FIREWALL 2ND ROUGH | 07/10/2018 | PARTIALLY APPROVED | JCOLASANTI |
| Note: will need final inspection on firewall | |||
| FRAMING | 07/10/2018 | Disapproved - NO FEE | JCOLASANTI |
| Note: need person of authority on job side FBC 110 at time of inspectoion | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 07/10/2018 | Disapproved -FEE REQUIRED | JCOLASANTI |
| Note: need person of authority on job side FBC 110 at time of inspectoion | |||
| LDSC-TREE BARRICADE | 07/03/2018 | Disapproved -FEE REQUIRED | WBUTLER |
| Note: 7/3/18 WMB Need to install tree barricades as discussed with CCI contractor and call for another inspection prior to any excavation work in the area for the water lines going to the backflow preventer. | |||
| ELECTRIC 2ND ROUGH | 07/03/2018 | PARTIALLY APPROVED | CMINI |
| Note: firewall outlets per strapping and ground screws. need revision for additional outlet | |||
| FRAMING | 06/28/2018 | PARTIALLY APPROVED | JCOLASANTI |
| Note: all framing complete except for tower, will call in when ready | |||
| PLUMBING 2ND ROUGH | 06/19/2018 | APPROVED | JGIBSON |
| ELECTRIC 2ND ROUGH | 06/18/2018 | CANCELLED BY APPLICANT | RMARTIN |
| ELECTRIC 2ND ROUGH | 06/15/2018 | PARTIALLY APPROVED | RMARTIN |
| Note: INTERIOR WALLS ONLY MARKED ON PRINT, MAKING CHANGES ON SOUTH END OF BUILDING | |||
| ELECTRIC 2ND ROUGH | 06/14/2018 | PARTIALLY APPROVED | RMARTIN |
| Note: WALLS ONLY FRONT ROOMS AND EAST REST ROOMS MARKED ON PLAN | |||
| PLUMBING 2ND ROUGH | 06/14/2018 | Disapproved -FEE REQUIRED | JGIBSON |
| Note: p-308.5 piping support for all CPVC SHOULD BE TO SCHEDULE ON HANGER SPACING, MISSING NAIL PLATES , NEED TO TEST WITH WATER NOT AIR ON PLASTIC PIPE, NEED SHUT-OFFS FOR ALL HOSE BIBS | |||
| FRAMING | 06/14/2018 | Disapproved - NO FEE | JCOLASANTI |
| Note: need revision for office and bathroom areas not to plan...(ok to drrywall factory partitions marked on plans) | |||
| WINDOW NAILING | 05/30/2018 | APPROVED | CMINI |
| WINDOW NAILING | 05/24/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: could not locate window anchoring schedule, paperwork is wet also. could not locate super | |||
| FRAMING | 05/21/2018 | Disapproved -FEE REQUIRED | CMINI |
| Note: still waiting for revision on control joint deletion, also need revison for connection of mansard framing of new detail. | |||
| LINTEL | 04/16/2018 | APPROVED - AS NOTED | CMINI |
| Note: revision for deleting control joints by next inspection | |||
| DOWN CELL | 04/11/2018 | PARTIALLY APPROVED | JCOLASANTI |
| Note: need letter by engineer to omit control joints per detail....columns at front entrance not done, need revision if going to frame. 10' of wall inspecterd area mzrked on plans. | |||
| FOUNDATION SURVEY - OFFICE USE ONLY | 04/10/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 04/03/2018 | APPROVED - AS NOTED | CMINI |
| Note: THIS IS A REINSPECTION, fire riser pipe boxed out | |||
| MONOLITHIC SLAB | 04/02/2018 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 04/02/2018 | Disapproved -FEE REQUIRED | JHINDMAN |
| Note: 1 fire underground piping has not been permitted and inspected 6th ed. FBC 105.1 | |||
| ELECTRIC 1ST ROUGH | 04/02/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: Grounding UFER GROUND | |||
| ELECTRIC 1ST ROUGH | 03/20/2018 | APPROVED | RMARTIN |
| PLUMBING 1ST ROUGH | 03/20/2018 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 09/21/2018 | 09/25/2018 |
| Note: Released By: DREWIS | |||
| BLD | COMPLETE | 09/20/2018 | 09/21/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 09/20/2018 | 09/21/2018 |
| Note: Released By: DREWIS | |||
| ELEC | COMPLETE | 08/28/2018 | 09/05/2018 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 08/21/2018 | 08/27/2018 |
| Note: Released By: JHINDMAN | |||
| BLD | HOLD | 08/09/2018 | 08/09/2018 |
| Note: Held By: JHINDMAN 1. Provide signed and sealed revisions. | |||
| PLUM | COMPLETE | 08/03/2018 | 08/07/2018 |
| Note: Released By: FREODICA Revision: plumbing riser diagram at tenant 2 bathroom. | |||
| MECH | COMPLETE | 07/06/2018 | 07/18/2018 |
| Note: Released By: FREODICA Revision: Added ventilation to new bathroom at tenent 2. | |||
| BLD | COMPLETE | 07/03/2018 | 07/06/2018 |
| Note: Released By: JHINDMAN | |||
| ELEC | COMPLETE | 07/03/2018 | 07/09/2018 |
| Note: Released By: DREWIS | |||
| FD1 | CANCEL | 07/03/2018 | 07/06/2018 |
| Note: 1. Fire Alarm is under seperate permit | |||
| PLUM | HOLD | 07/03/2018 | 07/18/2018 |
| Note: Held By: FREODICA Revision 5 dated 7-3-18:: Provide plumbing riser (sanitary and domestic water-hot and cold) of the new bathroom at tenant 2. signed and sealed by design professional or with signature and license number of a plumbing contractor per FBC 6th ed. 107.3.5/107.1. F.Reodica -386-986-4734. | |||
| BLD | COMPLETE | 06/20/2018 | 06/27/2018 |
| Note: Released By: JHINDMAN | |||
| BLD | COMPLETE | 06/07/2018 | 06/19/2018 |
| Note: Released By: JHINDMAN | |||
| BLD | HOLD | 04/16/2018 | 04/18/2018 |
| Note: Held By: JHINDMAN 1. Provide an original signed and sealed engineers letter. Digital signatures can omly be accepted on a permit that was submitted using the digital submittal process. J. Hindman 986-3784. | |||
| SW1 | COMPLETE | 04/09/2018 | 04/10/2018 |
| Note: Released By: DREWIS FOUNDATION S | |||
| UD1 | COMPLETE | 03/13/2018 | 03/16/2018 |
| Note: Released By: DRAMIREZ Steve Flanagan met with the contractor and reviewed the revised plan. Comment has been satisfied. | |||
| BLD | COMPLETE | 03/13/2018 | 03/14/2018 |
| Note: Released By: JHINDMAN | |||
| MECH | COMPLETE | 03/13/2018 | 03/16/2018 |
| Note: Released By: FREODICA | |||
| UD1 | HOLD | 02/21/2018 | 02/23/2018 |
| Note: Held By: CJOHNSON P2 still shows both units water combined. Future tenant space requires separate water service. Refer to Civil plans | |||
| ELEC | COMPLETE | 02/21/2018 | 02/27/2018 |
| Note: Released By: DREWIS | |||
| MECH | HOLD | 02/21/2018 | 02/28/2018 |
| Note: Held By: FREODICA Repeat comments for item 1 and 3. Held By: FREODICA 1. Mechanical plan (M1) shall be signed and sealed by FL registered engineer per FBC 5th edition section 105.3.2.1(3) 3. Provide condensate drain disposal to comply with FBCM 5th edition sec. 307. F.Reodica -386-986-4734. Additional comment based on 2-21-18 submittal: The total distributed supply air in CFM of hvac uniits adjacent to 10-ton unit exceeded its capacity. Clarify per FBC 5th ed. 107.2.1. | |||
| PLUM | COMPLETE | 02/21/2018 | 02/28/2018 |
| Note: Released By: FREODICA | |||
| BLD | HOLD | 02/21/2018 | 02/27/2018 |
| Note: Held By: JHINDMAN 1. Provide signed and sealed plans for the metal building. (omly the first page is signd and sealed.). 5th ed. FBC 107.1. 2. Provide complete structural details for the tower walls and roof Spoke with Gary Roberts 2/28. about the issues | |||
| FI1 | COMPLETE | 02/21/2018 | 02/27/2018 |
| Note: Released By: JHINDMAN | |||
| BLD | HOLD | 01/02/2018 | 01/17/2018 |
| Note: Held By: JHINDMAN 1. Provide signed and sealed plans for the metal building. (omly the first page is signd and sealed.). 5th ed. FBC 107.1. 2. Provide complete structural details for the tower walls and roof. 3. The dumpster, Fire underground, fire alarm and fire sprinkler are to be permitted under seperate permits. J. Hindman 986-3784. | |||
| DSD | COMPLETE | 01/02/2018 | 01/10/2018 |
| Note: Released By: DRAMIREZ Held By: DRAMIREZ The dumpster requires a separate permit. Please apply for a separate permit and remove plan sheets from file. | |||
| ELEC | HOLD | 01/02/2018 | 01/09/2018 |
| Note: Held By: DREWIS Please provide a service GFCI for the AHUs, NEC 2011 210.63. Daniel Rewis 986-4736 | |||
| FI1 | HOLD | 01/02/2018 | 01/17/2018 |
| Note: Held By: JHINDMAN 1. Provide fire extinguishes spacing not to exceed 75 feet from any area. NFPA 10. J. Hindman 986-3784. | |||
| MECH | HOLD | 01/02/2018 | 01/16/2018 |
| Note: Held By: FREODICA 1. Mechanical plan (M1) shall be signed and sealed by FL registered engineer per FBC 5th edition section 105.3.2.1(3) 2. Toiler rooms shall be provided with exhaust ventilation per FBCM 5th editon Table 403.3. 3. Provide condensate drain disposal to comply with FBCM 5th edition sec. 307. F.Reodica -386-986-4734. | |||
| PLUM | HOLD | 01/02/2018 | 01/16/2018 |
| Note: Held By: FREODICA 1.Sheet No. P2: a.Provide support detail ot a 40- gallon hot water heater located above ceiling for structural safety per FBCP 5th edition sec. 307.1. b. Clarify the capacity of hot water heater as enegry calculation shows one(1) gallon only per FBC 5th edition sec. 107.2.1. c. Provide the pipe size of hot water main distribution supply on riser diagram per FBCP 5th ed.604.3. 2. Sheet No.P3: a. Pipe sizes on accessible toilets near offices do not match with sanitary riser diagram. Coordinate for clarity per FBC 5th ed. 107.2.1. b. Provide DWV pipe sizes for kitchen sink per FBC 5th ed. 710/906. c. Lavatory on sanitary riser diagram for future tenant space is missing. Coordinate with plan per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734. | |||
| UD1 | HOLD | 01/02/2018 | 01/08/2018 |
| Note: Held By: CJOHNSON Future tenant space requires separate water service. Refer to Civil plans |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤8,322.00 | 10/09/2018 |
| REINSPECTION FEE | ¤40.00 | 10/09/2018 |
| REINSPECTION FEE | ¤40.00 | 10/09/2018 |
| REVISION | ¤40.00 | 10/09/2018 |
| REVISION | ¤40.00 | 10/09/2018 |
| REVISION | ¤40.00 | 10/09/2018 |
| FIRE COMMERCIAL IMPACT FEE | (¤8,322.00) | 10/09/2018 |
| TRANSPORTATION IMPACT FEE | ¤50,520.00 | 10/09/2018 |
| TRANSPORTATION IMPACT FEE | (¤50,520.00) | 10/09/2018 |
| REINSPECTION FEE | ¤40.00 | 09/17/2018 |
| REINSPECTION FEE | ¤40.00 | 09/17/2018 |
| REVISION | ¤40.00 | 09/17/2018 |
| REVISION | ¤40.00 | 09/17/2018 |
| REINSPECTION FEE | ¤40.00 | 09/17/2018 |
| REINSPECTION FEE | ¤40.00 | 09/17/2018 |
| REINSPECTION FEE | ¤40.00 | 09/17/2018 |
| REVISION | ¤40.00 | 09/17/2018 |
| REVISION | ¤40.00 | 09/17/2018 |
| REVISION | ¤40.00 | 09/17/2018 |
| REVISION | ¤40.00 | 09/17/2018 |
| REVISION | ¤40.00 | 09/17/2018 |
| REVISION | ¤40.00 | 09/17/2018 |
| REINSPECTION FEE | ¤40.00 | 05/29/2018 |
| REINSPECTION FEE | ¤40.00 | 05/21/2018 |
| REINSPECTION FEE | ¤40.00 | 05/21/2018 |
| ADDITIONAL FEE | ¤249.66 | 03/21/2018 |
| ADDITIONAL FEE | ¤3,195.09 | 03/21/2018 |
| ADMIN COMMERCIAL | ¤60.00 | 03/16/2018 |
| ELECTRIC FEE | ¤1,080.00 | 03/16/2018 |
| ENGINEERING PERMIT FEES | ¤120.00 | 03/16/2018 |
| MECHANICAL FEE | ¤1,080.00 | 03/16/2018 |
| PERMIT FEE | ¤9,350.00 | 03/16/2018 |
| PLAN CHECK FEE | ¤1,955.00 | 03/16/2018 |
| PLUMBING FEE | ¤1,080.00 | 03/16/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤249.66) | 03/16/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤3,195.09) | 03/16/2018 |
| SITE PLAN 20 | ¤20.00 | 03/16/2018 |
| SURCHARGE FS 533.721 | ¤147.45 | 03/16/2018 |
| SURCHARGE - FS 468.631 | ¤221.18 | 03/16/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,953.63 |