Permit #2017120920

Permit Details

Status: COED

Block: 00000
Subdivision: 1164 - PINE LAKES INDUSTRIAL PARK
Job Phone: 386-238-1570
Location Address: 10 COMMERCE BLVD
Type: BC - BUILDING COMMERCIAL
Issue Date: 03/16/2018
NOC: RECORDED
Applicant name: GARY LYNN ROBERTS
Owner: GIOIA PROPERTIES LLC

Address

PO BOX 352918

PALM COAST, FL 32135

Lot: 0080
Contracted Stated Job Value: ¤1,700,000.00
Job Description: 30,000 SQ FT BUILDING (GIOIA SAILS)
Type: CN

Contractor

COMMERCIAL CONSTRUCTION INC.
Status Location Address State License Number Phone Fax
ACTIVE

7 SUNSHINE BLVD

ORMOND BEACH, FL 32174

CGC059441 (Exp: 08/31/2026) 386-238-1570 386-238-1571

Sub Contractors

GARY S WELBORN
Status Location Address State License Number Phone Fax
ACTIVE

1709 North Nova Road

Holly Hill, 32117

CFC1426839 (Exp: 08/31/2026) (386) 257-1172 386-252-5979
MICHAEL SCOTT CAIN
Status Location Address State License Number Phone Fax
INACTIVE

45 HUMMINGBIRD LANE

ORMOND BEACH, FL 32174

EC13003801 (Exp: 08/31/2024) (386)547-7102 386-265-1989
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366

Inspection History

Type Request Date Result Inspector
U - UTILITY COMMERCIAL FINAL 10/09/2018 APPROVED JNICHOLS
Note: From: Jim Nichols Sent: Tuesday, October 9, 2018 2:10 PM To: Chris Johnson <CJohnson@palmcoastgov.com> Subject: RE: gioia sails - 2017120920 Yes I had gone by earlier today and my stuff looked good. From: Chris Johnson Sent: Tuesday, October 9, 2018 10:02 AM To: Jim Nichols <JNichols@palmcoastgov.com> Cc: Barbie Bembry <BBembry@palmcoastgov.com> Subject: FW: gioia sails - 2017120920 Jim, Are you OK with finaling out Gioia Sails? It doesn’t look like the final was requested
GRAVITY SEWER 10/03/2018 FINAL APPROVED JNICHOLS
BLD - SITE LIGHTING-POLE SET/FIXTURE 09/24/2018 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION, revision obtained
PLUMBING FINAL 09/21/2018 APPROVED CMINI
HVAC FINAL 09/21/2018 APPROVED CMINI
ELECTRIC FINAL 09/21/2018 APPROVED CMINI
Note: CANCELLED BY CONTRACTOR
BUILDING FINAL 09/21/2018 FINAL APPROVED WMILLER
Note: PENDING PLUMBING, HVAC, AND ELECTRIC, FINALS
FIRE FINAL 09/21/2018 FINAL APPROVED WMILLER
Note: FINAL FIRE APPROVED
BLD - SITE LIGHTING-POLE SET/FIXTURE 09/20/2018 Disapproved -FEE REQUIRED CMINI
Note: APPROVED PLAN ON EXTERIOR LIGHTS DO NOT MATCH WHAT IS INSTALLED
HVAC FINAL 09/19/2018 CANCELLED BY APPLICANT CMINI
ELECTRIC FINAL 09/19/2018 Disapproved -FEE REQUIRED RMARTIN
Note: APPROVED PLANS NEED TO MATCH PANEL SCHEDULES IN ALL PANELS, NEED TO SHOW WELL CIRCUIT, NEED TO LABEL MOCP ON ALL AHUS
U-WATER SERVICE INSTALLATION 09/19/2018 APPROVED JNICHOLS
FIREWALL FINAL 09/18/2018 APPROVED CMINI
INSULATION 09/18/2018 APPROVED CMINI
FRAMING 09/18/2018 APPROVED - AS NOTED CMINI
Note: need revision by final showing new opening into tenant space
DOWN CELL 09/18/2018 APPROVED - AS NOTED CMINI
Note: all down cell complete
LATH/BRICK/WATER BARRIER 09/10/2018 APPROVED CMINI
ELECTRIC 2ND ROUGH 09/10/2018 APPROVED RMARTIN
ELECTRIC - EARLY POWER 09/07/2018 APPROVED - AS NOTED RMARTIN
Note: SPOKE TO DELL FPL RELEASED EARLY POWER 1:45
PLUMBING 2ND ROUGH 09/07/2018 APPROVED - AS NOTED JGIBSON
Note: NEED SHUT OFF FOR HOSE BIB BEFORE PLUMBING FINAL
ELECTRIC 2ND ROUGH 09/06/2018 Disapproved -FEE REQUIRED RMARTIN
Note: CONTRACTOR NOT ON SITE, NO ELECTRICIAN ON SITE, NEED SOMEONE ON SITE FOR DIRECTION ON WHAT INSPECTION IS FOR
ABOVE CEILING 09/04/2018 APPROVED CMINI
HVAC ROUGH 08/31/2018 APPROVED CMINI
EXTERIOR WALL SHEATHING / SHEARWALL 08/30/2018 APPROVED - AS NOTED CMINI
Note: densglas
FRAMING 08/28/2018 APPROVED - AS NOTED CMINI
Note: revision aquired and corrected for framing
ELECTRIC - EARLY POWER 08/09/2018 CANCELLED BY APPLICANT RMARTIN
Note: CANCELLED BY ELECTRICAL CONTRACTOR
ELECTRIC 2ND ROUGH 08/08/2018 APPROVED - AS NOTED RMARTIN
Note: NEED REVISION ON ADDED REST ROOM/ELECTRIC BY FINAL
FRAMING 07/20/2018 PARTIALLY APPROVED JHINDMAN
Note: rear bathroom and front entry framing except ceiling. Provide revision for ceiling framing.
FRAMING 07/16/2018 PARTIALLY APPROVED JCOLASANTI
Note: bracing ok for trusses at entrance
FRAMING 07/12/2018 Disapproved -FEE REQUIRED JCOLASANTI
Note: need engineering per truss drawings for girder truss T4 FBC 802
ROOF SHEATHING / BRACE / TIE DOWN 07/12/2018 APPROVED JCOLASANTI
FIREWALL 2ND ROUGH 07/10/2018 PARTIALLY APPROVED JCOLASANTI
Note: will need final inspection on firewall
FRAMING 07/10/2018 Disapproved - NO FEE JCOLASANTI
Note: need person of authority on job side FBC 110 at time of inspectoion
ROOF SHEATHING / BRACE / TIE DOWN 07/10/2018 Disapproved -FEE REQUIRED JCOLASANTI
Note: need person of authority on job side FBC 110 at time of inspectoion
LDSC-TREE BARRICADE 07/03/2018 Disapproved -FEE REQUIRED WBUTLER
Note: 7/3/18 WMB Need to install tree barricades as discussed with CCI contractor and call for another inspection prior to any excavation work in the area for the water lines going to the backflow preventer.
ELECTRIC 2ND ROUGH 07/03/2018 PARTIALLY APPROVED CMINI
Note: firewall outlets per strapping and ground screws. need revision for additional outlet
FRAMING 06/28/2018 PARTIALLY APPROVED JCOLASANTI
Note: all framing complete except for tower, will call in when ready
PLUMBING 2ND ROUGH 06/19/2018 APPROVED JGIBSON
ELECTRIC 2ND ROUGH 06/18/2018 CANCELLED BY APPLICANT RMARTIN
ELECTRIC 2ND ROUGH 06/15/2018 PARTIALLY APPROVED RMARTIN
Note: INTERIOR WALLS ONLY MARKED ON PRINT, MAKING CHANGES ON SOUTH END OF BUILDING
ELECTRIC 2ND ROUGH 06/14/2018 PARTIALLY APPROVED RMARTIN
Note: WALLS ONLY FRONT ROOMS AND EAST REST ROOMS MARKED ON PLAN
PLUMBING 2ND ROUGH 06/14/2018 Disapproved -FEE REQUIRED JGIBSON
Note: p-308.5 piping support for all CPVC SHOULD BE TO SCHEDULE ON HANGER SPACING, MISSING NAIL PLATES , NEED TO TEST WITH WATER NOT AIR ON PLASTIC PIPE, NEED SHUT-OFFS FOR ALL HOSE BIBS
FRAMING 06/14/2018 Disapproved - NO FEE JCOLASANTI
Note: need revision for office and bathroom areas not to plan...(ok to drrywall factory partitions marked on plans)
WINDOW NAILING 05/30/2018 APPROVED CMINI
WINDOW NAILING 05/24/2018 Disapproved -FEE REQUIRED CMINI
Note: could not locate window anchoring schedule, paperwork is wet also. could not locate super
FRAMING 05/21/2018 Disapproved -FEE REQUIRED CMINI
Note: still waiting for revision on control joint deletion, also need revison for connection of mansard framing of new detail.
LINTEL 04/16/2018 APPROVED - AS NOTED CMINI
Note: revision for deleting control joints by next inspection
DOWN CELL 04/11/2018 PARTIALLY APPROVED JCOLASANTI
Note: need letter by engineer to omit control joints per detail....columns at front entrance not done, need revision if going to frame. 10' of wall inspecterd area mzrked on plans.
FOUNDATION SURVEY - OFFICE USE ONLY 04/10/2018 APPROVED DREWIS
MONOLITHIC SLAB 04/03/2018 APPROVED - AS NOTED CMINI
Note: THIS IS A REINSPECTION, fire riser pipe boxed out
MONOLITHIC SLAB 04/02/2018 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 04/02/2018 Disapproved -FEE REQUIRED JHINDMAN
Note: 1 fire underground piping has not been permitted and inspected 6th ed. FBC 105.1
ELECTRIC 1ST ROUGH 04/02/2018 APPROVED - AS NOTED RMARTIN
Note: Grounding UFER GROUND
ELECTRIC 1ST ROUGH 03/20/2018 APPROVED RMARTIN
PLUMBING 1ST ROUGH 03/20/2018 APPROVED JGIBSON

Review History

Department Status Date In Date Out
ELEC COMPLETE 09/21/2018 09/25/2018
Note: Released By: DREWIS
BLD COMPLETE 09/20/2018 09/21/2018
Note: Released By: JHINDMAN
ELEC COMPLETE 09/20/2018 09/21/2018
Note: Released By: DREWIS
ELEC COMPLETE 08/28/2018 09/05/2018
Note: Released By: JHINDMAN
BLD COMPLETE 08/21/2018 08/27/2018
Note: Released By: JHINDMAN
BLD HOLD 08/09/2018 08/09/2018
Note: Held By: JHINDMAN 1. Provide signed and sealed revisions.
PLUM COMPLETE 08/03/2018 08/07/2018
Note: Released By: FREODICA Revision: plumbing riser diagram at tenant 2 bathroom.
MECH COMPLETE 07/06/2018 07/18/2018
Note: Released By: FREODICA Revision: Added ventilation to new bathroom at tenent 2.
BLD COMPLETE 07/03/2018 07/06/2018
Note: Released By: JHINDMAN
ELEC COMPLETE 07/03/2018 07/09/2018
Note: Released By: DREWIS
FD1 CANCEL 07/03/2018 07/06/2018
Note: 1. Fire Alarm is under seperate permit
PLUM HOLD 07/03/2018 07/18/2018
Note: Held By: FREODICA Revision 5 dated 7-3-18:: Provide plumbing riser (sanitary and domestic water-hot and cold) of the new bathroom at tenant 2. signed and sealed by design professional or with signature and license number of a plumbing contractor per FBC 6th ed. 107.3.5/107.1. F.Reodica -386-986-4734.
BLD COMPLETE 06/20/2018 06/27/2018
Note: Released By: JHINDMAN
BLD COMPLETE 06/07/2018 06/19/2018
Note: Released By: JHINDMAN
BLD HOLD 04/16/2018 04/18/2018
Note: Held By: JHINDMAN 1. Provide an original signed and sealed engineers letter. Digital signatures can omly be accepted on a permit that was submitted using the digital submittal process. J. Hindman 986-3784.
SW1 COMPLETE 04/09/2018 04/10/2018
Note: Released By: DREWIS FOUNDATION S
UD1 COMPLETE 03/13/2018 03/16/2018
Note: Released By: DRAMIREZ Steve Flanagan met with the contractor and reviewed the revised plan. Comment has been satisfied.
BLD COMPLETE 03/13/2018 03/14/2018
Note: Released By: JHINDMAN
MECH COMPLETE 03/13/2018 03/16/2018
Note: Released By: FREODICA
UD1 HOLD 02/21/2018 02/23/2018
Note: Held By: CJOHNSON P2 still shows both units water combined. Future tenant space requires separate water service. Refer to Civil plans
ELEC COMPLETE 02/21/2018 02/27/2018
Note: Released By: DREWIS
MECH HOLD 02/21/2018 02/28/2018
Note: Held By: FREODICA Repeat comments for item 1 and 3. Held By: FREODICA 1. Mechanical plan (M1) shall be signed and sealed by FL registered engineer per FBC 5th edition section 105.3.2.1(3) 3. Provide condensate drain disposal to comply with FBCM 5th edition sec. 307. F.Reodica -386-986-4734. Additional comment based on 2-21-18 submittal: The total distributed supply air in CFM of hvac uniits adjacent to 10-ton unit exceeded its capacity. Clarify per FBC 5th ed. 107.2.1.
PLUM COMPLETE 02/21/2018 02/28/2018
Note: Released By: FREODICA
BLD HOLD 02/21/2018 02/27/2018
Note: Held By: JHINDMAN 1. Provide signed and sealed plans for the metal building. (omly the first page is signd and sealed.). 5th ed. FBC 107.1. 2. Provide complete structural details for the tower walls and roof Spoke with Gary Roberts 2/28. about the issues
FI1 COMPLETE 02/21/2018 02/27/2018
Note: Released By: JHINDMAN
BLD HOLD 01/02/2018 01/17/2018
Note: Held By: JHINDMAN 1. Provide signed and sealed plans for the metal building. (omly the first page is signd and sealed.). 5th ed. FBC 107.1. 2. Provide complete structural details for the tower walls and roof. 3. The dumpster, Fire underground, fire alarm and fire sprinkler are to be permitted under seperate permits. J. Hindman 986-3784.
DSD COMPLETE 01/02/2018 01/10/2018
Note: Released By: DRAMIREZ Held By: DRAMIREZ The dumpster requires a separate permit. Please apply for a separate permit and remove plan sheets from file.
ELEC HOLD 01/02/2018 01/09/2018
Note: Held By: DREWIS Please provide a service GFCI for the AHUs, NEC 2011 210.63. Daniel Rewis 986-4736
FI1 HOLD 01/02/2018 01/17/2018
Note: Held By: JHINDMAN 1. Provide fire extinguishes spacing not to exceed 75 feet from any area. NFPA 10. J. Hindman 986-3784.
MECH HOLD 01/02/2018 01/16/2018
Note: Held By: FREODICA 1. Mechanical plan (M1) shall be signed and sealed by FL registered engineer per FBC 5th edition section 105.3.2.1(3) 2. Toiler rooms shall be provided with exhaust ventilation per FBCM 5th editon Table 403.3. 3. Provide condensate drain disposal to comply with FBCM 5th edition sec. 307. F.Reodica -386-986-4734.
PLUM HOLD 01/02/2018 01/16/2018
Note: Held By: FREODICA 1.Sheet No. P2: a.Provide support detail ot a 40- gallon hot water heater located above ceiling for structural safety per FBCP 5th edition sec. 307.1. b. Clarify the capacity of hot water heater as enegry calculation shows one(1) gallon only per FBC 5th edition sec. 107.2.1. c. Provide the pipe size of hot water main distribution supply on riser diagram per FBCP 5th ed.604.3. 2. Sheet No.P3: a. Pipe sizes on accessible toilets near offices do not match with sanitary riser diagram. Coordinate for clarity per FBC 5th ed. 107.2.1. b. Provide DWV pipe sizes for kitchen sink per FBC 5th ed. 710/906. c. Lavatory on sanitary riser diagram for future tenant space is missing. Coordinate with plan per FBC 5th ed. 107.2.1. F.Reodica -386-986-4734.
UD1 HOLD 01/02/2018 01/08/2018
Note: Held By: CJOHNSON Future tenant space requires separate water service. Refer to Civil plans

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
IMPACT FEE FIRE NONRESIDENTIAL ¤8,322.00 10/09/2018
REINSPECTION FEE ¤40.00 10/09/2018
REINSPECTION FEE ¤40.00 10/09/2018
REVISION ¤40.00 10/09/2018
REVISION ¤40.00 10/09/2018
REVISION ¤40.00 10/09/2018
FIRE COMMERCIAL IMPACT FEE (¤8,322.00) 10/09/2018
TRANSPORTATION IMPACT FEE ¤50,520.00 10/09/2018
TRANSPORTATION IMPACT FEE (¤50,520.00) 10/09/2018
REINSPECTION FEE ¤40.00 09/17/2018
REINSPECTION FEE ¤40.00 09/17/2018
REVISION ¤40.00 09/17/2018
REVISION ¤40.00 09/17/2018
REINSPECTION FEE ¤40.00 09/17/2018
REINSPECTION FEE ¤40.00 09/17/2018
REINSPECTION FEE ¤40.00 09/17/2018
REVISION ¤40.00 09/17/2018
REVISION ¤40.00 09/17/2018
REVISION ¤40.00 09/17/2018
REVISION ¤40.00 09/17/2018
REVISION ¤40.00 09/17/2018
REVISION ¤40.00 09/17/2018
REINSPECTION FEE ¤40.00 05/29/2018
REINSPECTION FEE ¤40.00 05/21/2018
REINSPECTION FEE ¤40.00 05/21/2018
ADDITIONAL FEE ¤249.66 03/21/2018
ADDITIONAL FEE ¤3,195.09 03/21/2018
ADMIN COMMERCIAL ¤60.00 03/16/2018
ELECTRIC FEE ¤1,080.00 03/16/2018
ENGINEERING PERMIT FEES ¤120.00 03/16/2018
MECHANICAL FEE ¤1,080.00 03/16/2018
PERMIT FEE ¤9,350.00 03/16/2018
PLAN CHECK FEE ¤1,955.00 03/16/2018
PLUMBING FEE ¤1,080.00 03/16/2018
3% FIRE IMPACT FEE CREDIT (¤249.66) 03/16/2018
3% TRANS IMPACT FEE CREDIT (¤3,195.09) 03/16/2018
SITE PLAN 20 ¤20.00 03/16/2018
SURCHARGE FS 533.721 ¤147.45 03/16/2018
SURCHARGE - FS 468.631 ¤221.18 03/16/2018
Fees Total Due: ¤0.00 Total Paid: ¤15,953.63