Permit #2017120971
Permit Details
Status: COED
| Parcel Id: 07-11-31-7006-00030-0240 |
| CONDITIONED SPACE: 1863 sqft |
| GARAGE: 565 sqft |
| OPENED PORCH (WITH ROOF) : 44 sqft |
| OPENED PORCH (WITH ROOF) : 376 sqft |
| Total Square Footage: 2848 sqft |
| Block: 00030 |
| Subdivision: 2213 - SECTION 6-FLORIDA PARK |
| Job Phone: (386)445-9393 |
| Location Address: 30 FLEMING CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/19/2018 |
| NOC: RECORDED |
| Applicant name: ANTONIO JR AMARAL |
| Owner: MINUTILLO GIUSEPPE & LEONILDA MINUTILLO H&W |
|
Address 66 ALBERT DRIVE PARLIN, NJ 08859 |
| Lot: 0240 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
AMARAL HOMES & POOLS, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
13 Utility Drive PALM COAST, FL 32137 |
CBC058062 (Exp: 08/31/2026) | (386)445-9393 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ANTONIO AMARAL JR
| Status | Location Address | State License Number |
| ACTIVE |
1370 PALM HARBOR PKWY PALM COAST, FL 32137 |
CCC058004 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/01/2019 | APPROVED | MWILLIAMS |
| Note: THIS IS A REINSPECTION | |||
| BLD - BUILDING FINAL | 04/26/2019 | Disapproved -FEE REQUIRED | WMILLER |
| Note: 1. TEST CAPS ON FUTURE DWV…. P3005.1.5 PROVISIONS FOR FUTURE FIXTURES. REPLACE TEST CAPS WITH PERMANENT PLUG OR CAP FITTING (SCHEDULE 40) (NOT A TEST CAP) (future plumbing on porch) 2. SPACES AROUND PIPES MUST BE SEALED….SEALING OF ANNULAR SPACES…P2606.1 (future plumbing on porch) 3. need the correction for electric that was asked for by final at all-rough | |||
| ROW - FINAL APRON (AFTER POUR) | 04/26/2019 | APPROVED | RGROSS |
| PROJECT STATUS (OFFICE USE) | 04/26/2019 | APPROVED - AS NOTED | RGROSS |
| Note: PROJECT STATUS ADDED BY INSPECTOR AFTER NOTICING THAT THE SOD ON THE LEFT SIDE PROPERTY LINE AND VACANT WAS NOT BLENDED INTO THE SURROUNDING ELEVATION. PER BUILDER, THIS WILL BE CORRECTED FIRST THING MONDAY MORNING. | |||
| ROW - DRAINAGE | 04/26/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL INSPECTION | 04/26/2019 | APPROVED | RGROSS |
| Note: BUILDER TO LOWER SOD ELEVATION AT THE LEFT PROPERTY LINE TO BLEND WITH SURROUNDING SWALE ELEVATION. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/26/2019 | FINAL APPROVED | JNICHOLS |
| FINAL SURVEY (OFFICE USE ONLY) | 04/25/2019 | APPROVED | JHINDMAN |
| ROW- PRE-APRON (PRE-POUR) | 04/05/2019 | APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 04/02/2019 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Tony requested this inspection. Culverts and culvert ends to be poured are full of water. Sub base material too soft to pour and will need recompacted in the apron after it dries out. Face board on the right side is not parallel to the road edge. | |||
| ELECTRIC - EARLY POWER | 03/05/2019 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO DELL FPL RELEASED EARLY POWER 3:10 | |||
| ELECTRIC - EARLY POWER | 03/04/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: ALL DOORS LOCKED NEED ACCESS FOR INSPECTION........ STILL LOCKED | |||
| ELECTRIC - EARLY POWER | 03/01/2019 | Disapproved -FEE REQUIRED | RMARTIN |
| Note: ALL DOORS LOCKED NEED ACCESS FOR INSPECTION | |||
| ROW - DRAINAGE | 03/01/2019 | PARTIALLY APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. BUILDER DID MAKE AN ATTEMPT TO DRAIN WATER FROM THE REAR. HOWEVER, SHORTLY AFTER THE EFFORT ANOTHER RAIN WASHED OUT MUCH OF WHAT HAD BEEN DONE. PER BUILDER WILL HAVE WORK DONE AGAIN ON MONDAY 3/4/19. NEXT DRAINAGE INSPECTION SCHEDULED FOR 3/7/19. | |||
| ROW - DRAINAGE | 02/28/2019 | PARTIALLY APPROVED | RGROSS |
| Note: THIS IS A REINSPECTION. PARTIALLY APPROVED. BUILDER MADE ATTEMPT TO DRAIN WATER FROM BACK TO FRONT. SITE WILL BE REGULARLY MONITORED NEXT INSTPECTION. 3/1/19 | |||
| ROW - DRAINAGE | 02/22/2019 | Disapproved - NO FEE | RGROSS |
| Note: STANDING WATER ON THE RIGHT REAR PROPERTY NEEDS TO TEMPORARILY DRAIN TO THE FRONT. PER NEIGHBOR, DURING HARD RAINS WATER IS SLOWLY DRAINING ONTO THEIR PROPERTY. NEXT INSPECTION 2/28/19. | |||
| U - SEWER TIE IN | 01/16/2019 | APPROVED | JGIBSON |
| GRAVITY SEWER TEST | 01/16/2019 | APPROVED | JGIBSON |
| INSULATION | 11/27/2018 | APPROVED | MWILLIAMS |
| INSULATION | 11/26/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL (need the APPROVED paperwork on site at time of final) (NEED ENERGY CALCS AT TIME OF INSPECTION) | |||
| ALL ROUGH | 11/14/2018 | APPROVED - AS NOTED | WMILLER |
| Note: ELECTRICAL REVISION STILL NOT MATCHING CONDITIONS AT SITE (NEED CORRECTED REVSION MATCHING CONDITIONS AT SITE BY FINAL) | |||
| LATH/BRICK/ WATER BARRIER | 10/26/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| ALL ROUGH | 10/22/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: NEED REVISION FOR ALL ADDED ELECTRIC (CHECK ALL) ALSO NEED TO PASS ROOF VALLEY METAL PRIOR | |||
| ROOF VALLEY & METAL | 10/22/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| ROOF VALLEY & METAL | 10/22/2018 | APPROVED | WMILLER |
| Note: THIS IS A REINSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/22/2018 | APPROVED | WMILLER |
| Note: APPROVED | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/19/2018 | CANCELLED BY APPLICANT | WMILLER |
| Note: CANCELLED BY TONY | |||
| ROOF VALLEY & METAL | 10/19/2018 | CANCELLED BY APPLICANT | WMILLER |
| Note: CANCELLED BY TONY | |||
| ALL ROUGH | 10/19/2018 | CANCELLED BY APPLICANT | WMILLER |
| Note: cancelled via phone | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/17/2018 | Disapproved -FEE REQUIRED | WMILLER |
| Note: MISSING STRAPS AT TRUSS 15 MISSING FASTENERS AT ADDED STRAPP BACK SIDE OF PORCH WALL AT TRUSS 23 ALL MARKED ON PLANS AND ENGINEERING | |||
| ROOF VALLEY & METAL | 10/17/2018 | Disapproved - NO FEE | WMILLER |
| Note: MUST PASS 2460 ROOF SHEATHING / BRACES/TIES/DOWN CELLS PRIOR | |||
| TIE BEAM / LINTEL | 07/03/2018 | APPROVED | CMINI |
| TIE BEAM / LINTEL | 05/16/2018 | APPROVED | CMINI |
| FOUND SURVEY APPROVED (OFFICE) | 05/09/2018 | APPROVED | DREWIS |
| MONOLITHIC SLAB | 04/06/2018 | APPROVED | WMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/27/2018 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| ELEC | COMPLETE | 04/29/2019 | 04/30/2019 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 04/23/2019 | 04/25/2019 |
| Note: Released By: JHINDMAN Final S | |||
| UD1 | COMPLETE | 03/12/2019 | 03/15/2019 |
| Note: Released By: AHALL Gravity Sewer new homes This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. The NFPA Clear Zone distance there can be no obstacles in front of the Hydrant and 3.0’ on both sides and 4’ behind. | |||
| ENGIN1 | COMPLETE | 03/12/2019 | 03/18/2019 |
| Note: Released By: TBAKER | |||
| ZON | COMPLETE | 03/12/2019 | 03/12/2019 |
| Note: Released By: AMOBLEY | |||
| SW1 | CANCEL | 03/12/2019 | 03/15/2019 |
| ELEC | COMPLETE | 11/08/2018 | 11/11/2018 |
| Note: Released By: DREWIS | |||
| BLD | COMPLETE | 06/26/2018 | 06/29/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 05/08/2018 | 05/09/2018 |
| Note: Released By: DREWIS foundation s | |||
| ZON | COMPLETE | 02/07/2018 | 02/07/2018 |
| Note: Released By: AMOBLEY | |||
| ZON | HOLD | 01/30/2018 | 01/30/2018 |
| Note: Held By: AMOBLEY Color of home does not meet the approved LRV | |||
| MECH | COMPLETE | 01/30/2018 | 02/01/2018 |
| Note: Released By: FREODICA | |||
| PLUM | COMPLETE | 01/30/2018 | 02/01/2018 |
| Note: Released By: FREODICA | |||
| ELEC | COMPLETE | 01/30/2018 | 02/02/2018 |
| Note: Released By: DREWIS | |||
| BLD | COMPLETE | 01/02/2018 | 01/03/2018 |
| Note: Released By: FREODICA | |||
| ELEC | HOLD | 01/02/2018 | 01/08/2018 |
| Note: Held By: DREWIS Receptacle need on right side dining room wall & master bedroom behind door swing, NEC 2011 210.52. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 01/02/2018 | 01/19/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 01/02/2018 | 01/03/2018 |
| Note: Held By: FREODICA 1. Provide signature of builder on energy performance level (EPL) display card per FBCEC 5th ed. R401.3. 2. Provide signature of owner/agent on energy code compliance certification per FBC 5th ed. R401.2 3. Provide eqquipment sizing calculation including manufacture and model number of selected hvac units and its performance data per FBCEC 5th ed. R403.6.1. 4. Provide hvac plan either prepared by design professional or a mechanical contractor with signature and license number per FBC 5th ed. 107.3.4.2. F.Reodica -386-986-4734. | |||
| PLUM | HOLD | 01/02/2018 | 01/03/2018 |
| Note: Held By: FREODICA Provide sanitary riser diagram either prepared by design professional or a plumbing contractor with signature and license number per FBC 5th ed. 107.1. F.Reodica -386-986-4734. | |||
| SW1 | COMPLETE | 01/02/2018 | 01/08/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 01/02/2018 | 01/03/2018 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 01/02/2018 | 01/03/2018 |
| Note: Held By: AMOBLEY Landscape plan is not complete. Should show all foundation plantings (shrubs and trees) Colors of home does not meet the approved LRV |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION FEE | ¤40.00 | 05/01/2019 |
| REINSPECTION FEE | ¤40.00 | 05/01/2019 |
| REINSPECTION FEE | ¤40.00 | 05/01/2019 |
| REINSPECTION FEE | ¤40.00 | 05/01/2019 |
| REINSPECTION FEE | ¤40.00 | 05/01/2019 |
| REINSPECTION FEE | ¤40.00 | 05/01/2019 |
| REINSPECTION FEE | ¤40.00 | 05/01/2019 |
| REVISION | ¤40.00 | 05/01/2019 |
| REVISION | ¤40.00 | 05/01/2019 |
| REVISION | ¤40.00 | 05/01/2019 |
| SITE PLAN 20 | ¤20.00 | 02/19/2018 |
| SURCHARGE FS 533.721 | ¤12.57 | 02/19/2018 |
| SURCHARGE - FS 468.631 | ¤18.86 | 02/19/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/19/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 02/19/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤494.00 | 02/19/2018 |
| ADMIN FEE | ¤20.00 | 02/19/2018 |
| ELECTRIC FEE | ¤208.20 | 02/19/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 02/19/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 02/19/2018 |
| IMPACT FEE PARKS | ¤849.24 | 02/19/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/19/2018 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 02/19/2018 |
| MECHANICAL FEE | ¤208.20 | 02/19/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 02/19/2018 |
| PLAN CHECK FEE | ¤98.80 | 02/19/2018 |
| PLUMBING FEE | ¤208.20 | 02/19/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,435.75 |