Permit #2018010854
Permit Details
Status: COED
| Parcel Id: 07-11-31-7018-00210-0060 |
| GARAGE: 483 sqft |
| CONDITIONED SPACE: 2351 sqft |
| OPENED PORCH (WITH ROOF) : 290 sqft |
| OPENED PORCH (WITH ROOF) : 88 sqft |
| Total Square Footage: 3212 sqft |
| Block: 00210 |
| Subdivision: 2181 - SECTION 18-WYNNFIELD |
| Job Phone: (386)446-5161 |
| Location Address: 2 WILLOW PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 02/08/2018 |
| NOC: RECORDED |
| Applicant name: HUGO A CAMACHO |
| Owner: FERREIRA, ABEL V & SARA I |
|
Address 100 LONGVIEW ROAD MONROE, CT 06468 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
IDEAL HOMES AT PALM COAST, INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 353639 PALM COAST, FL 32137 |
CBC1250774 (Exp: 08/31/2026) | (386)446-5161 | (386)447-0238 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
JOANNA S REELEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
2 MARKET PLACE D PALM COAST, FL 32137 |
CCC1327485 (Exp: 08/31/2020) | 386-445-7945 |
BOB BELL
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3200 PARKER DRIVE ST AUGUSTINE, FL 32084 |
LG35711 (Exp: 08/31/2027) | 904-417-6470 | 877-566-4016 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/23/2018 | FINAL APPROVED | JCOLASANTI |
| U -UTILITY RESIDENTIAL FINAL | 10/22/2018 | FINAL APPROVED | LFITZGERALD |
| GAS FINAL | 10/19/2018 | APPROVED | JGIBSON |
| FINAL SURVEY (OFFICE USE ONLY) | 10/18/2018 | APPROVED | DREWIS |
| Note: THIS IS A REINSPECTION | |||
| ROW - FINAL INSPECTION | 10/18/2018 | FINAL APPROVED | KHOWELL |
| ROW - FINAL APRON (AFTER POUR) | 10/18/2018 | APPROVED | KHOWELL |
| FINAL SURVEY (OFFICE USE ONLY) | 10/17/2018 | Disapproved - NO FEE | DREWIS |
| Note: Property line elevations of 29.1' and 28.9' on the left side allow flow from the adjacent property, Tech. Manual Sec. 5 Eng. Standard 300.01 A1 c6. Daniel Rewis 986-4736 | |||
| GAS ROUGH | 10/09/2018 | APPROVED | JGIBSON |
| GAS ROUGH | 09/28/2018 | CANCELLED BY APPLICANT | JGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 09/19/2018 | APPROVED | KHOWELL |
| ELECTRIC - EARLY POWER | 08/31/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED EARLY POWER 3:30 | |||
| ROW- PAVER RESTRAINTS | 08/28/2018 | APPROVED | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 08/28/2018 | PARTIALLY APPROVED | KHOWELL |
| Note: APRON AND RESTAINT INSPECTION, CONTRACTOR SHOULD CHECK CULVERT PIPE ELEVATION PRIOR TO POURING CONCRETE | |||
| ROW- PRE-APRON (PRE-POUR) | 08/27/2018 | CANCELLED BY APPLICANT | KHOWELL |
| ROW- PRE-APRON (PRE-POUR) | 08/24/2018 | Disapproved -FEE REQUIRED | KHOWELL |
| Note: NOT FORMED PER SITE PLAN AND UPPER PAVER RESTRAINT WAS NOT FORMED FROM THE RIGHT SIDE OF THE GARAGE BACK TO THE RIGHT SIDE OF THE HOUSE. SITE PLAN NEEDS TO BE REVISED OR CHANGE FORMS TO MATCH SITE PLAN. | |||
| U - SEWER TIE IN | 07/12/2018 | APPROVED | LFITZGERALD |
| Note: City performed sewer tap, due to a repair for this sewer lateral/main, plummer tied into remaining stub. | |||
| GRAVITY SEWER TEST | 07/12/2018 | APPROVED | JGIBSON |
| LATH/BRICK/ WATER BARRIER | 06/29/2018 | APPROVED | JCOLASANTI |
| INSULATION | 06/29/2018 | APPROVED | JCOLASANTI |
| ALL ROUGH | 06/25/2018 | APPROVED - AS NOTED | JCOLASANTI |
| Note: WHIRLPOOL PUMPS BONDING 680.62 (B) METAL PARTS OF ELECTRICAL EQUIPMENT ASSOCIATED WITH TUB WATER CIRCULATING SYSTEM INCLUDING PUMP MOTORS SHALL BE BONDED TOGETHER (pump needs to be bonded to the metal handle of the tub, will check at insulation). | |||
| ROOF VALLEY & METAL | 06/14/2018 | APPROVED | JCOLASANTI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/04/2018 | APPROVED - AS NOTED | JCOLASANTI |
| Note: strap ridge to trussfront entrance FBC 802 | |||
| ELECTRIC-TUG | 05/11/2018 | APPROVED - AS NOTED | RMARTIN |
| Note: SPOKE TO SUSAN FPL RELEASED TUG POWER 11:25 | |||
| TIE BEAM / LINTEL | 05/07/2018 | APPROVED | JCOLASANTI |
| TIE BEAM / LINTEL | 05/04/2018 | CANCELLED BY APPLICANT | WMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 04/13/2018 | APPROVED | FREODICA |
| MONOLITHIC SLAB | 03/29/2018 | APPROVED | CMINI |
| PLUMBING 1ST ROUGH UNDERGROUND | 03/22/2018 | APPROVED | JGIBSON |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 10/18/2018 | 10/18/2018 |
| Note: Released By: DREWIS | |||
| SW1 | HOLD | 10/15/2018 | 10/17/2018 |
| Note: Held By: DREWIS Final survey Property line elevations of 29.1' and 28.9' on the left side allow flow from the adjacent property, Tech. Manual Sec. 5 Eng. Standard 300.01 A1 c6. Daniel Rewis 986-4736 | |||
| PLUM | COMPLETE | 10/01/2018 | 10/04/2018 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 08/17/2018 | 08/20/2018 |
| Note: Released By: AMOBLEY | |||
| URB | COMPLETE | 08/17/2018 | 08/20/2018 |
| Note: Released By: JBEAUDET | |||
| SW1 | COMPLETE | 08/17/2018 | 08/20/2018 |
| Note: Released By: JHINDMAN | |||
| ZON | COMPLETE | 07/20/2018 | 07/20/2018 |
| Note: Released By: AMOBLEY | |||
| BLD | COMPLETE | 07/20/2018 | 07/23/2018 |
| Note: Released By: JHINDMAN | |||
| SW1 | COMPLETE | 04/10/2018 | 04/12/2018 |
| Note: Released By: JHINDMAN FOUNDATION S | |||
| ZON | COMPLETE | 02/02/2018 | 02/05/2018 |
| Note: Released By: TAWILLIAMS | |||
| BLD | COMPLETE | 02/02/2018 | 02/05/2018 |
| Note: Released By: FREODICA | |||
| ELEC | COMPLETE | 02/02/2018 | 02/07/2018 |
| Note: Released By: DREWIS | |||
| MECH | COMPLETE | 02/02/2018 | 02/05/2018 |
| Note: Released By: FREODICA | |||
| BLD | HOLD | 01/23/2018 | 01/24/2018 |
| Note: Held By: JHINDMAN Plans shall be designed to comply with FBC 6th edition (2017). 2. Provide the Florida Product approval numbers for the windows, exterior doors and the overhead door. F.S.S. 553.. J. Hindman 986-3784. | |||
| ELEC | HOLD | 01/23/2018 | 01/25/2018 |
| Note: Held By: DREWIS FBC referance shall be 6th edition which requires the 2014 NEC be utilized. Daniel Rewis 986-4736 | |||
| ENGIN1 | COMPLETE | 01/23/2018 | 02/01/2018 |
| Note: Released By: TBAKER | |||
| MECH | HOLD | 01/23/2018 | 01/25/2018 |
| Note: Held By: FREODICA Provide updated energy calculation Form R405-2017 per FBCEC 6th ed. R405.4. F.Reodica -386-986-4734. | |||
| PLUM | COMPLETE | 01/23/2018 | 01/25/2018 |
| Note: Released By: FREODICA | |||
| SW1 | COMPLETE | 01/23/2018 | 01/25/2018 |
| Note: Released By: DREWIS | |||
| UD1 | COMPLETE | 01/23/2018 | 01/29/2018 |
| Note: Released By: MBACON This is a Gravity sewer, the Sewer Tie-in Inspection is a visual inspection it must be called in the day before the tie-in is to be made. The morning of the tie-in the inspector should be contacted to coordinate the time of the tie-in so he can witness the tie-in and help prevent failed inspections due to cave in or mud/water preventing the visual inspection. All new Concrete work including Driveway Pavers must maintain at least a 4.5 feet clear zone from all Water / Reuse Meter Pits or Pep Tank lids and 9 feet behind the pep tank lids. All sewer cleanouts or valves located within the concrete area must be raised flush with the grade and sewer cleanouts must have a flush brass cap. | |||
| ZON | HOLD | 01/23/2018 | 01/23/2018 |
| Note: Held By: AMOBLEY Shrubs must wrap both sides of house and street side will require additional shrubs Please submit the latest version of the ROW Utilization Agreement. If you need a copy contact zoning and we can email you the correct form |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADDITIONAL FEE | ¤40.00 | 10/24/2018 |
| GAS PIPING | ¤40.00 | 10/24/2018 |
| REVISION | ¤40.00 | 10/24/2018 |
| REVISION | ¤40.00 | 10/24/2018 |
| REINSPECTION FEE | ¤40.00 | 10/24/2018 |
| REINSPECTION FEE | ¤40.00 | 10/24/2018 |
| NEW RESIDENTIAL INSPECTIONS | ¤600.00 | 02/08/2018 |
| SITE PLAN 20 | ¤20.00 | 02/08/2018 |
| SURCHARGE FS 533.721 | ¤14.80 | 02/08/2018 |
| SURCHARGE - FS 468.631 | ¤22.20 | 02/08/2018 |
| STORM WATER PERMIT FEES | ¤80.00 | 02/08/2018 |
| 3% TRANS IMPACT FEE CREDIT | (¤93.74) | 02/08/2018 |
| MECHANICAL FEE | ¤240.00 | 02/08/2018 |
| 3% PARKS IMPACT FEE CREDIT | (¤25.48) | 02/08/2018 |
| PLAN CHECK FEE | ¤120.00 | 02/08/2018 |
| PLUMBING FEE | ¤240.00 | 02/08/2018 |
| ADMIN FEE | ¤20.00 | 02/08/2018 |
| ELECTRIC FEE | ¤240.00 | 02/08/2018 |
| 3% FIRE IMPACT FEE CREDIT | (¤6.56) | 02/08/2018 |
| IMPACT FEE FIRE NONRESIDENTIAL | ¤218.79 | 02/08/2018 |
| IMPACT FEE PARKS | ¤849.24 | 02/08/2018 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 02/08/2018 |
| RECORDING FEE REIMBURSE DOC | ¤52.50 | 02/08/2018 |
| IMPACT FEE TRANSPORTATION | ¤3,124.67 | 02/08/2018 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤9,556.42 |